| Change Managment Report - Extended Requests | |||||||||||||||||||||
| Change Requests: April 29th, 2005 through May 3rd, 2005 | |||||||||||||||||||||
| Change Request | Requestor | Start Date & Time | Stop Date & Time | Duration | Two Week Notice | Environment Impact | Server/Device | Application/Tool | Request Description | Business Impact | Mtg. Approval | Mtg. Approval/Review | Business Approver(s) and Apprvl | Technical Approver(s) and Apprvl | Contingency Plan | Implementation Actions | Validation Criteria/Test Plan | Project Name | Remedy Ticket Number | Coordinator / Implementor | Date In |
| Extended | |||||||||||||||||||||
| 20221 | DAVID ASTEMBORSKI | 3/28/05 1:00 AM | 6/27/05 10:00 AM | 30 MINS | Yes | PRODUCTION | CCSMVS | DRS | OLD CHANGE REQUEST # 10849. REPLACE THE UNSUPPORTED CA-EPS SYSTEM SOFTWARE WITH A SUPPORTED VERSION OF LRS-DRS SYSTEM SOFTWARE | NO IMPACT. | Y | 09/21/ | PETER LAMB (N) | PETER LAMB (N) | STOP
DRS START EPS |
STOP
EPS ON CCSMVS START DRS ON CCSMVS |
MONITOR DRS FORWARDING OF SAP REPORTS CORRECTLY TO THE RDS REPORT DISTRIBUTION DATA BASE ON CCSMVS | ENH_NT_UPGRADE SAPGUI ON ALL CITRIX SERVERS | DAVID ASTEMBORSKI | 8/27/04 12:00 AM | |
| 21047 | JOHN WILCOX | 4/18/05 8:00 AM | 5/5/05 3:00 PM | 5 HOURS | N/A | TEST | KIOWA | LIVELINK | UPGRADE FROM LIVELINK 9.1 SP2 TO 9.1 SP4 IN PREPARATION TO GO TO VERSION 9.2 | ANY PERSON USING TEST LIVELINK | Y | 12/14/ | -- NO BUSINESS APPROVER(S) ASSIGNED -- | JUDITH KING (N); JOHN WILCOX (Y) | 1) BACKUP COMPLETED JUST PRIOR TO UPGRADE. 2) TIME REQUIRED SHOULD BE VERY QUICK AS WE JUST HAVE TO POINT THE APPLICATION TO THE OLD DIRECTORY. 3) JUDY KING AND ALL APPROVERS WILL BE NOTIFIED. | BACKUP THE DATABASE AND ALL DIRECTORIES. FOLLOW THE INSTRUCTIONS SUPPLIED FOR UPDATING LIVELINK TO 9.1 SP4. NEW VERSION WILL BE IN A NEW DIRECTORY. | VERSION NUMBER CHANGES TO 9.1 SP4 | UPGRADE TO 9.1.SP4 | JOHN WILCOX | 12/7/04 11:52 AM | |
| 21805 | LAWRENCE STENGER | 4/18/05 8:00 AM | 6/17/05 6:00 PM | 45 DAYS | Yes | PRODUCTION | BLACKBERRY | BLACKBERRY | PASSWORD POLICY ADDITION TO 500 BLACKBERRY USERS. GO FROM 4 CHARACTERS TO 6. | 500 BLACKBERRY USERS WILL BE AFFECTED. TO MITIGATE SUPPORT AND CUSTOMER ISSUES IMPLEMENTATION WILL BE STAGED WITH 10 TO 20 USER POLICIES DONE PER DAY. | Y | 4/12/2 | DWIGHT ALLMON (N) | MARK TIMPE (Y) | SWITCH USERS BACK TO THEIR OLD BLACKBERRY PASSWORD POLICY. | COMMUNICATE TO USERS THAT WILL BE MOVED TO THE POLICY 24 HOURS IN ADVANCE EACH DAY. MOVE 10 TO 20 USERS TO THE NEW BLACKBERRY POLICY PER DAY. | USERS ARE WORKING ON THE NEW PASSWORD POLICY FOR BLACKBERRY | WORKORDER | 1050946 | MARK TIMPE | 3/29/05 4:31 PM |
| 21868 | GEORGE DINAKAR | 4/25/05 6:00 AM | 5/6/05 6:00 PM | 10 DAYS | N/A | DEVELOPMENT | BLACKTAIL | COGNOS SERIES 8 (BETA) | WE ARE IMPLEMENTING THE NEW COGNOS SOFTWARE SERIES 8 AS A BETA TEST PROGRAM IN BLACKTAIL. IT INVOLVES CUBES, REPORTNET AND OTHER COGNOS TOOLS. | ONLY THE COGNOS DEVELOPERS (CIF) | Y | 4/19/2 | -- NO BUSINESS APPROVER(S) ASSIGNED -- | WILLIAM MALLOT (N); CHERYL LANDWEHR (Y); CARLA LEET (N) | 1) APRIL 22 2) 2 DAYS 3) GEORGE DINAKAR (720-560-7676) |
COGNOS INC WILL BE INSTALLING THE NEW SERIES 8 AS BETA TEST. | SERIES 8 INSTALLED AND TEST NEW FUNCTIONALITIES | CIF | CHERYL LANDWEHR / GEORGE DINAKAR | 4/12/05 4:32 PM | |
| 21765 | LAWRENCE STENGER | 5/2/05 8:00 AM | 5/6/05 5:00 PM | 30 HOURS | Yes | PRODUCTION | TELEPHONY PPN, IN BUILDING 1 | TELEPHONY | RECOVER OCTEL STATIONS AND DISABLE PORTS NOT USED. | NONE | A | 4/12/2 | DWIGHT ALLMON (N) | MYRA PIETILA (N) | RENABLE THE PORTS. | PHYSICAL VERIFICATION BEFORE CHANGES AND DELETES ARE
MADE PERFORM CHANGES AND DELETES TO STATION PROGRAMMING RECOVER STATIONS ON OCTEL VOICEMAIL SYSTEM |
PORTS THAT ARE NOT USED ARE DISABLED. | CONTACT CENTER SYSTEMS - PHS 1 | MYRA PIETILA / RICHELLE CAWTHRA | 3/24/05 10:02 AM | |
| 21766 | LAWRENCE STENGER | 5/2/05 8:00 AM | 5/6/05 5:00 PM | 30 HOURS | Yes | PRODUCTION | TELEPHONY EPN2 BUILDING 1 | TELEPHONY | PREPARE PORTS BEFORE AVAYA UPGRADE | NONE | A | 4/12/2 | DWIGHT ALLMON (N) | MYRA PIETILA (N) | RENABLE PORTS | PHYSICAL VERIFICATION BEFORE CHANGES AND DELETES ARE
MADE PERFORM CHANGES AND DELETES TO STATION PROGRAMMING RECOVER STATIONS ON OCTEL VOICEMAIL SYSTEM |
PORTS HAVE BEEN RECOVERED | CCS PROJECT - PHASE 1 | MYRA PIETILA / RICHELLE CAWTHRA | 3/24/05 10:05 AM | |
| 21767 | LAWRENCE STENGER | 5/2/05 8:00 AM | 5/6/05 5:00 PM | 30 HOURS | Yes | PRODUCTION | TELEPHONY EPN3, IN BUILDING 1 | TELEPHONY | PREPARE PORTS FOR AVAYA UPGRADE | NONE | A | 4/12/2 | DWIGHT ALLMON (N) | MYRA PIETILA (N) | RENABLE PORTS | PHYSICAL VERIFICATION BEFORE CHANGES AND DELETES ARE
MADE PERFORM CHANGES AND DELETES TO STATION PROGRAMMING RECOVER STATIONS ON OCTEL VOICEMAIL SYSTEM |
PORTS HAVE BEEN DISABLED AND CONSOLIDATED | CCS PROJECT - PHASE 1 | MYRA PIETILA / RICHELLE CAWTHRA | 3/24/05 10:09 AM | |
| Short-term Requests | |||||||||||||||||||||
| 21978 | SCOTT ANDERSEN | 4/27/05 9:30 PM | 4/27/05 10:00 PM | 30 MINS | No | PRODUCTION | XX-PTL01, XX-PTL02 | PORTAL - SBA | INSTALLATION OF SBA ONLY CODE TO FIX PROBLEM WITH SERIAL NUMBER SEARCH | ALL PORTAL APPLICATIONS (SBA AND SALES COMM) WILL BE MOMENTARILY UNAVAILABLE. | A | WILLIAM PURCELL (Y); PENELOPE BARTELL (N) | CARL NEER (Y); SCOTT ANDERSEN (Y); COREY EVANS (Y) | RERUN THE INSTALL SBA JOB, USING VERSION 1.0.371.0 | RUN THE SBA INSTALL JOB ON THE SERVERS. | SERIAL NUMBER SEARCH IS WORKING | SBA | 1086263 | SCOTT ANDERSEN / COREY EVANS | 4/27/05 8:39 AM | |
| 21983 | JAMES BIDDLE | 4/28/05 7:00 PM | 4/28/05 9:00 PM | 60 MINS | No | PRODUCTION | SAN MIGUEL | INTEROP INSTANCE ON JAVA APPLICATION SERVER | BREAK FIX: DEPLOY A NEW VERSION OF THE INTEROP APPLICATION. CODE HAS BEEN TESTED ON DEV AND TST INSTANCES OF INTEROP | MINIMAL IMPACT: OFF HOUR DEPLOY, SERVER RESTART TAKES ~ 2 SECONDS, NO IMPACT TO OPERATING SYSTEM OR OTHER APPLICATIONS. | A | JUDITH DUNN (Y); WARREN ROSENBLUM (Y) | SONG ZHANG (Y) | APPLICATION SERVER REVERT TO PREVIOUS CODE. | DEPLOY INTEROP.WAR TO THE SUN ONE JAVA APPLICATION SERVER INSTANCE FOR INTEROP PROD. | ERROR LOG SHOULD DOCUMENT CODE LAUNCH WITHOUT ERRORS. DEVELOPER SONG ZHANG WILL VERIFY SITE FUNCTIONALITY | INTEROP | 1081465 | JAMES BIDDLE | 4/28/05 10:08 AM | |
| Friday, April 29, 2005 | |||||||||||||||||||||
| 21985 | BARBARA MCFADDEN | 4/29/05 9:00 AM | 4/29/05 5:00 PM | 4 HOURS | N/A | QAS/STAGING | HQSQLSTG01 | PORTAL | RECREATE PORTAL, SHAREPOINT AND BIZTALK DATABASES SO THAT THE TRANSACTION LOG AND DATA FILES ARE ON DIFFERENT DISKS UTILIZING DIFFERENT CONTROLLERS. | SERVICES FOR PORTAL, SHAREPOINT AND BIZTALK WILL BE SHUTDOWN SO DATABASES CAN BE BACKED UP, DELETED AND REBUILT. | A | -- NO BUSINESS APPROVER(S) ASSIGNED -- | JUDITH KING (Y); KATHY GOODELL (Y) | RESTORE ALL DATABASES TO ONE FILE SYSTEM WITH BACKUPS TAKEN BEFORE CHANGE. | SHUTDOWN APPLICATION SERVICES, BACK UP DATABASES, DROP DATABASES AND REBUILD FROM BACKUP. | THE APPLICATIONS CAN ATTACH TO ALL THE DATABASES. | 1086991 | BARBARA MCFADDEN | 4/28/05 2:35 PM | ||
| 21898 | DANIEL TRUJILLO | 4/29/05 11:00 AM | 4/29/05 3:00 PM | 60 MINS | No | PRODUCTION | MINNEAPOLIS, MN WAN ROUTER | QWEST DOMESTIC WAN | RE-SCHEDULE OF FAILED CR 21597. CONVERT THE MINNEAPOLIS, MN OFFICE TO THE QWEST DOMESTIC WAN FROM THE MCI DOMESTIC WAN | WIDE AREA NETWORK CONNECTIVITY WILL BE LOST FOR 5 MINUTES WHILE THE LOCAL AREA NETWORK IS CUTOVER FROM EXISTING MCI WAN & ROUTER TO NEW QWEST WAN & NEW ROUTER. NEW ROUTER AND CIRCUIT WILL BE INSTALLED AND TESTED PRIOR TO THE CUTOVER IN ORDER TO MINIMIZE DISRUPTION. ACTUAL CUTOVER TIME IS SCHEDULED FOR 12:00 CDT | Y | 4/19/2 | MELANIE COLLUM (N) | JAMES WAMSLEY (Y); BRADY FOURNIEA (Y) | RE-CONNECT EXISTING ROUTER AND MCI WAN LINK, CUT LAN BACK OVER TO EXISTING ROUTER FROM THE NEW ONE. | 1 - INSTALL THE NEW ROUTER INTO THE EQUIPMENT RACK 2 - PLUG INTO UPS AND POWER UP 3 - DISCONNECT THE EXTERNAL MODEM FROM THE EXISTING ROUTER AND CONNECT IT TO THE NEW ROUTER AND TEST CONNECTIVITY. 4 - ACTIVATE THE NEW WAN CIRCUIT WITH QWEST, TEST FROM LOUISVILLE. 5 - DISCONNECT THE ETHERNET CABLE CONNECTING THE EXISTING ROUTER TO THE CISCO LAN SWITCH FROM EXISTING ROUTER AND PLUG IT INTO THE NEW ROUTER, CONNECT NEW ROUTER TO NEW WAN CIRCUIT. 6 - TEST NEW CONNECTION IN OFFICE AND REMOTELY VIA HQ | VERIFY CONSOLE CONNECTIVITY TO NEW ROUTER & OFFICE LAN VIA THE QWEST DOMESTIC WAN. QWEST ENGINEERING CONFIRMATION OF CONNECTIVITY AT THE TIME OF THE CUTOVER. VALIDATION BY LOCAL OFFICE STAFF. | WAN CONVERSION | N/A | DANIEL TRUJILLO / JAMES WAMSLEY | 4/18/05 10:32 AM |
| 21955 | JULIANNE IRWIN | 4/29/05 12:00 PM | 4/29/05 3:00 PM | 3 HOURS | N/A | TEST | DENALI | SAP - TST | APPLY HR SUPPORT PACKS (SAP PROPRIETORY CODE) UPDATES. | TEST HR USERS. | Y | 4/26/2 | -- NO BUSINESS APPROVER(S) ASSIGNED -- | GREG SCHAFER (N) | PERFORM DB RESTORE FROM 4/28, APPROX. 4 HOURS, NORMAL EXCALATION PROCEDURES WILL BE FOLLOWED. | INSTALL HR CODES CHANGES. | SAP HR USERS WILL TEST. | SAP STACK UPDATE | N/A | JULIANNE IRWIN | 4/25/05 8:59 AM |
| 21954 | JULIANNE IRWIN | 4/29/05 12:00 PM | 4/29/05 8:00 PM | 8 HOURS | N/A | QAS/STAGING | PINATUBO | SAP - QAS | APPLY SAP PROPRIETARY CODE PLUG-INS TO REMAIN CURRENT. | SAP TEST USERS, HOWEVER SYSTEM WILL BE UP. | Y | 4/26/2 | -- NO BUSINESS APPROVER(S) ASSIGNED -- | GREG SCHAFER (N) | RESTORE DB FROM BACKUP ON 4/28 TO LAST APPROX. 4 HOURS. NORMAL ESCALATION PROCEDURES WILL BE FOLLOWED. | INSTALL SAP CODE CHANGE UPDATES. | GLOBAL TRADE USERS TO TEST. | SAP STACK UPDATE | JULIANNE IRWIN | 4/25/05 8:55 AM | |
| 21774 | DANIEL PECORA | 4/29/05 6:00 PM | 4/30/05 6:00 AM | 6 HOURS | Yes | PRODUCTION | KRUGER | APPLICATION SERVER FOR ACEVA AND SERVIGISTICS | UPGRADE THE VERITAS FILE SYSTEM AND VOLUME MANAGER VERSION TO 4.0. REASON: THE VERSION CURRENTLY ON THE SERVER IS WILL NOT BE SUPPORTED AFTER 2005. | THE ACEVA AND SERVIGISTICS APPLICATIONS WILL NOT BE AVAILABLE DURING THE UPGRADE. THE DATABASE WILL BE AVAILABLE, BUT WITHOUT THE APPLICATION BEHIND IT, THE APPLICATION WILL BE WORTHLESS. | A | 4/19/2 | DOROTHY WEYTHMAN (Y); WARREN ROSENBLUM (Y); LEONARD COLE (Y) | JAMES BIDDLE (Y); SHELLEY BURGER (Y); JUDITH KING (Y) | FULL AND INCREMENTAL BACKUPS WILL BE CONFIRMED BEFORE THE CHANGE CONTROL STARTS. IF THERE ARE HARDWARE OR BACKUP PROBLEMS, THE CHANGE CONTROL WILL BE CANCELED. IT'S POSSIBLE THAT A FULL SERVER RESTORE COULD TAKE 24 HOURS. NORMAL ESCALATION PROCEDURE WILL BE FOLLOWED. | SEE UPGRADE PLAN AT G:\EDS\HW CURRENCY\VERITAS UPGRADES | USE THE FOLLOWING VERITAS COMMANDS TO CONFIRM DISK GROUP, AND FILE SYSTEM VERSIONS; VXUPGRADE "FILE SYSTEM NAME" : VXDG LIST "DISK GROUP NAME". THE DATABASE AND APPLICATION SUPPORT TEAMS WILL ALSO CHECK THEIR RESPECTIVE DB'S AND APPLICATIONS. | HW/SW CURRENCY | N/A | DANIEL PECORA / JOSE SALAS | 3/24/05 11:38 AM |
| 21856 | MICHAEL GRANGER | 4/29/05 7:00 PM | 4/29/05 7:30 PM | 30 MINS | Yes | PRODUCTION | ANDURIL (PIX FIREWALL) | NA | EXISTING CLARIFY PAGING APPLICATION TRAFFIC BETWEEN STK AND ANTENNA CORP. NEEDS TO BE MOVED (RE-ROUTED) ONTO THE NEW LAN-TO-LAN TUNNEL. | A FEW MINUTES OF DOWN TIME WHILE CONFIG WORK IS DONE ON OUR RESPECITIVE FIREWALLS TO REROUTE VIA THE TUNNELS. | N | 4/12/2 | THOMAS SAIERS (Y) | JAMES BOEHMLER (Y) | UNDO THE NEW ROUTE STATEMENTS SO THAT THE TRAFFIC WOULD BE ROUTED NORMALLY OVER THE INTERNET. IF THE CHANGE GOES PAST 30 MINUTES, WE WILL REVERT AND CONTACT THE HELPDESK. | ADDING ROUTE STATEMENTS ON ANDURIL (PIX FIREWALL) FOR BOTH ANTENNA SUBNETS TO BE REACHED VIA THE TUNNEL | APPS EITHER WORK OR THEY DON'T. | MICHAEL GRANGER | 4/11/05 4:41 PM | ||
| 21894 | BRYCE WILSON | 4/29/05 7:00 PM | 4/29/05 10:00 PM | 1 HOURS | Yes | PRODUCTION | CRPD | CLARIFY | SBA RELATED CODE MIGRATIONS FOR CLARIFY | NO IMPACT. THES SYSTEM WILL NOT BE DOWN. GLOBAL SERVICE AND TEC WILL SEE NO IMPACT. | A | 4/19/2 | BARB LARSEN (N) | WILLIAM MALLOT (Y) | ROLLBACK CODE MODULES - 15MINS- TEC 911 MGR | SBA RELATED CODE MIGRATIONS FOR CLARIFY | RUN TEST CASE THRU CODE ON PROD | SBA AND B/F W/O | SATISH VEGESNA | 4/15/05 10:38 AM | |
| 21884 | RICK RAINWATER | 4/29/05 7:00 PM | 4/30/05 12:00 AM | 29 HOURS | Yes | PRODUCTION | SEE PROD SERVER SPREADSHEET | SEE PROD SERVER SPREADSHEET | UPGRADE SYMANTEC ANTIVIRUS CLIENT TO 9.0.3 ON ALL LISTED SERVERS. PLEASE REVIEW SPREADSHEET LOCATED G:\EDS\SERVERMANAGEMENT\PATCH MANAGEMENT\SYMANTECCLIENTUPGRADE.XLS | SERVERS/SYSTEMS WILL BE NOT BE AVAILABLE DURING UPGRADE AND REBOOT. | A | 4/19/2 | WARREN ROSENBLUM (Y); DWIGHT ALLMON (N) | MICHAEL MOORE (Y); RICK RAINWATER (Y) | A FULL BACKUP WILL BE MADE AND USED TO RESTORE PREVIOUS SETUP. | UPGRADING THE SYMANTEC ANTIVIRUS FROM 8.0/8.1.1 TO 9.0.3 WHICH IS RECOMMENDED BY SYMANTEC (SYM05-003 UPX PARSING ENGINE HEAP OVERFLOW) | THIS UPGRADE HAS BEEN APPLIED TO THE DEV SERVERS. | UPGRADE TO SYMANTEC CLIENT 9.0.3 | 1081306 | RICK RAINWATER | 4/14/05 6:43 AM |
| 21869 | DANIEL PECORA | 4/29/05 7:00 PM | 4/30/05 7:00 AM | 6 HOURS | Yes | PRODUCTION | RAKSHAKA | CLEARCASE SERVER FOR TAPE ENGINEERING | UPGRADE THE VERITAS FILE SYSTEM AND VOLUME MANAGER VERSION TO 4.0. REASON: THE VERSION CURRENTLY ON THE SERVER WILL NOT BE SUPPORTED AFTER 2005. | THE CLEARCASE APPLICATION FOR THE TAPE ENGINEERING GROUP WILL NOT BE AVAILABLE DURING THE UPGRADE. | A | 4/19/2 | ROBERT CREAGER (Y); RALPH HEWITT III (Y) | WARREN ROSENBLUM (N) | FULL AND INCREMENTAL BACKUPS WILL BE CONFIRMED BEFORE THE CHANGE CONTROL STARTS, ALONG WITH A FULL BEFORE THE UPGRADE BEGINS. IF THERE ARE HARDWARE OR BACKUP PROBLEMS THE CHANGE CONTROL WILL BE CANCELED. IT'S POSSIBLE THAT A FULL SERVER RESTORE COULD TAKE 24 HOURS. NORMAL ESCALATION PROCEDURES WILL BE FOLLOWED AS WELL AS COMMUNICATION TO THE BUSINESS CONTACT. | SEE UPGRADE PLAN AT G:\EDS\HW CURRENCY\VERITAS UPGRADES. | UNIX ADMIN WILL VERIFY ALL FILE SYSTEMS AND VOLUMES. ADMIN WILL ALSO USE THE FOLLOWING VERITAS COMMANDS TO CONFIRM DISK GROUP, AND FILE SYSTEM VERSIONS; VXUPGRADE "FILE SYSTEM NAME" : VXDG LIST "DISK GROUP NAME". THE CLEARCASE APPLICATION SUPPORT TEAM WILL ALSO CHECK THE APPLICATION AFTER THE UPGRADE HAS BEEN COMPLETED. | HW/SW CURRENCY | N/A | DANIEL PECORA / DONALD LOWE | 4/13/05 7:40 AM |
| 21775 | KARIMUTHU RANGASAMY | 4/29/05 9:00 PM | 4/29/05 10:00 PM | 30 MINS | Yes | PRODUCTION | LSV-EWEB06 | MICROSOFT CONTENT MANAGEMENT SERVER | APPLY MICROSOFT CMS PATCH ON SERVER LSV-EWEB06 | NO IMPACT, AS THE PRODUCTION SERVERS ARE IN CLUSTER ENVIRONMENT | A | 3/29/2 | GEORGE SMITH (N); PENELOPE BARTELL (Y); MARK MARTI (Y); RAJEEV ANKIREDDYPALLI (Y); SARAH BROWN (Y); GURDIP SINGH CLARE (N) | MARK MCDERMOND (N) | ON ANY ISSUE WE WILL UNINSTALL THE PATCH. | APPLY MIRCOSOFT CMS FIX ON SERVER LSV-EWEB06. | WE WILL BE MONITORING THE WEBSITE FOR SPECIFIC SYSTEM ERRORS | KARIMUTHU RANGASAMY | 3/24/05 11:40 AM | ||
| Saturday, April 30, 2005 | |||||||||||||||||||||
| 21975 | ROBERT HAYNES | 4/30/05 12:15 AM | 4/30/05 12:45 AM | 30 MINS | No | PRODUCTION | DOLORES/GLADSTONE | SIEBEL 7.5 PRD | INCLUDE THE OPPORTUNITY COMMIT FLAG IN THE SIEBEL 7.5 PRD QUOTE HEADER EXTRACTS FOR SAP. | NONE | A | CHRISTINA D'AMICO (N); CHRIS RIVERS (N); ANN BRUINSMA (Y) | WILLIAM MALLOT (Y) | SIEBEL 7.5 HAS A COLD BACKUP TAKEN EVERY SATURDAY MORNING. RESTORE OF THE DATABASE CAN TAKE FROM 8 TO 10 HOURS. CONTACT BOB HAYNES IF RESTORE WINDOW IS EXEEDED. | MOVE MODIFIED SCRIPTS TO PRODUCTION DIRECTORIES, UPDATE SCRIPT'S ENVRIOMENTAL PARAMETERS. | COMMIT FLAG WILL APPEAR IN THE SAP EXTRACT. | SAP EXTRACTS | 1086133 | ROBERT HAYNES | 4/26/05 3:23 PM | |
| 21879 | DANIEL PECORA | 4/30/05 1:00 AM | 4/30/05 9:00 AM | 4 HOURS | Yes | PRODUCTION | HQ-SQL01 | SEE IMPACT FIELD | UPGRADE THE LEVEL OF RDAC (MULTI-PATHING SOFTWARE) FROM 8.40.G2.02 TO 9.10.G2.01 REASON: RDAC LEVEL MUST BE ABOVE VERSION 9 BEFORE THE DISK ARRAY FIRMWARE CAN BE UPGRADED. IT IS ALSO A CURRENCY LEVEL ITEM. | THE FOLLOWING APPLICATIONS WILL SEE A BRIEF OUTAGE WHILE SERVICES ARE FAILING OVER FROM ONE NODE TO THE OTHER; HYPERION, PRICEBOOK, BIZTALK, BLACKBERRY ADMIN CONSOLE, CONTRACT REVIEW, CRC, EPARTNERS, FRED, ORDERS, PORTL/SBA, SALES COMMUNITY, SHAREPOINT, AND STORAGETEK TEMP LICENSE REPOSITORY. | A | 4/19/2 | GEORGE SMITH (Y); DWIGHT ALLMON (N); WILLIAM PURCELL (Y); PENELOPE BARTELL (Y); MARK MARTI (Y); JUDY HEIN (Y); CRAIG MCAULIFFE (Y) | REBECCA MATZ (Y); JUDITH KING (Y); WENDY DYAKOVICH (Y); CARLOS SILVA (Y); KATHY GOODELL (Y) | IF NECESSARY, THE ORIGINAL VERSION WOULD BE REINSTALLED. THE ONLY PROBLEM WITH THAT IS, IT WILL HOLD UP OUR MADATORY DISK ARRAY CODE UPGRADE. IF A FULL SERVER RESTORE IS REQUIRED, 24 HOURS MAY BE NEEDED. NORMAL ESCALATION PROCEUDRES WOULD BE USED IF PROBLEMS SHOULD ARISE. | SEE UPGRADE PLAN AT G:\EDS\HW CURRENCY\RDAC | THE WINDOWS ADMIN WILL USE SYSTEM TOOLS TO REVIEW THE NEW RDAC VERSION. THE INSTALL LOGS WILL ALSO BE REVIEWED. ALL DRIVES, FILE SYSTEMS, AND DISK PATHING WILL BE CHECKED AFTER THE RDAC UPGRADE. THE DATABASES WILL BE CHECKED AFTER THE SERVER IS BACK ONLINE. | HW/SW CURRENCY | N/A | DANIEL PECORA / MATT BAROODY | 4/13/05 3:41 PM |
| 21880 | DANIEL PECORA | 4/30/05 1:00 AM | 4/30/05 9:00 AM | 4 HOURS | Yes | PRODUCTION | HQ-SQL02 | SEE IMPACT FIELD | UPGRADE THE LEVEL OF RDAC (MULTI-PATHING SOFTWARE) FROM 8.40.G2.02 TO 9.10.G2.01 REASON: RDAC LEVEL MUST BE ABOVE VERSION 9 BEFORE THE DISK ARRAY FIRMWARE CAN BE UPGRADED. IT IS ALSO A CURRENCY LEVEL ITEM. | THE FOLLOWING APPLICATIONS WILL SEE A BRIEF OUTAGE WHILE SERVICES ARE FAILING OVER FROM ONE NODE TO THE OTHER; CHANNELSITEQUOTE, CONTRACT REVIEW, CMS, MEDIA, NCOMPASS. | A | 4/19/2 | PENELOPE BARTELL (Y); MARK MARTI (Y) | REBECCA MATZ (Y); JUDITH KING (Y); WENDY DYAKOVICH (Y); CARLOS SILVA (Y); KATHY GOODELL (Y) | IF NECESSARY, THE ORIGINAL VERSION WOULD BE REINSTALLED. THE ONLY PROBLEM WITH THAT IS, IT WILL HOLD UP OUR MADATORY DISK ARRAY CODE UPGRADE. IF A FULL SERVER RESTORE IS REQUIRED, 24 HOURS MAY BE NEEDED. NORMAL ESCALATION PROCEUDRES WOULD BE USED IF PROBLEMS SHOULD ARISE. | SEE UPGRADE PLAN AT G:\EDS\HW CURRENCY\RDAC | THE WINDOWS ADMIN WILL USE SYSTEM TOOLS TO REVIEW THE NEW RDAC VERSION. THE INSTALL LOGS WILL ALSO BE REVIEWED. ALL DRIVES, FILE SYSTEMS, AND DISK PATHING WILL BE CHECKED AFTER THE RDAC UPGRADE. THE DATABASES WILL BE CHECKED AFTER THE SERVER IS BACK ONLINE. | HW/SW CURRENCY | N/A | DANIEL PECORA / MATT BAROODY | 4/13/05 3:42 PM |
| 21881 | DANIEL PECORA | 4/30/05 1:00 AM | 4/30/05 9:00 AM | 4 HOURS | Yes | PRODUCTION | HQ-SQL03 | SEE IMPACT FIELD | UPGRADE THE LEVEL OF RDAC (MULTI-PATHING SOFTWARE) FROM 8.40.G2.02 TO 9.10.G2.01 REASON: RDAC LEVEL MUST BE ABOVE VERSION 9 BEFORE THE DISK ARRAY FIRMWARE CAN BE UPGRADED. IT IS ALSO A CURRENCY LEVEL ITEM. | THE FOLLOWING APPLICATIONS WILL SEE A BRIEF OUTAGE WHILE SERVICES ARE FAILING OVER FROM ONE NODE TO THE OTHER; BLACKBERRY ADMIN CONSOLE, HYPERION, PRIMUS, AND REAL ESTATE. | A | 4/19/2 | JACKIE HYNES (Y); JUDY HEIN (Y); BARB LARSEN (Y) | JUDITH KING (Y) | IF NECESSARY, THE ORIGINAL VERSION WOULD BE REINSTALLED. THE ONLY PROBLEM WITH THAT IS, IT WILL HOLD UP OUR MADATORY DISK ARRAY CODE UPGRADE. IF A FULL SERVER RESTORE IS REQUIRED, 24 HOURS MAY BE NEEDED. NORMAL ESCALATION PROCEUDRES WOULD BE USED IF PROBLEMS SHOULD ARISE. | SEE UPGRADE PLAN AT G:\EDS\HW CURRENCY\RDAC | THE WINDOWS ADMIN WILL USE SYSTEM TOOLS TO REVIEW THE NEW RDAC VERSION. THE INSTALL LOGS WILL ALSO BE REVIEWED. ALL DRIVES, FILE SYSTEMS, AND DISK PATHING WILL BE CHECKED AFTER THE RDAC UPGRADE. THE DATABASES WILL BE CHECKED AFTER THE SERVER IS BACK ONLINE. | HW/SW CURRENCY | N/A | DANIEL PECORA / DWIGHT BUEHLER | 4/13/05 3:58 PM |
| 21882 | DANIEL PECORA | 4/30/05 1:00 AM | 4/30/05 9:00 AM | 4 HOURS | Yes | PRODUCTION | HQ-SQL04 | SEE IMPACT FIELD | UPGRADE THE LEVEL OF RDAC (MULTI-PATHING SOFTWARE) FROM 8.40.G2.02 TO 9.10.G2.01 REASON: RDAC LEVEL MUST BE ABOVE VERSION 9 BEFORE THE DISK ARRAY FIRMWARE CAN BE UPGRADED. IT IS ALSO A CURRENCY LEVEL ITEM. | THE FOLLOWING APPLICATIONS WILL SEE A BRIEF OUTAGE WHILE SERVICES ARE FAILING OVER FROM ONE NODE TO THE OTHER; ASURE, DOCENT, INQUSITE, IPC, KPMG, AND OSIRIS. | A | 4/19/2 | CONSTANCE BURKHARD (Y); BARBARA MELTON (N); TAMARA MILLER (Y); ASHIK MOMEN (Y); THOMAS APPS (Y); ANN BRUINSMA (Y); RAJEEV ANKIREDDYPALLI (Y); MARTIN MILES (Y); SARAH BROWN (Y) | JUDITH KING (Y) | IF NECESSARY, THE ORIGINAL VERSION WOULD BE REINSTALLED. THE ONLY PROBLEM WITH THAT IS, IT WILL HOLD UP OUR MADATORY DISK ARRAY CODE UPGRADE. IF A FULL SERVER RESTORE IS REQUIRED, 24 HOURS MAY BE NEEDED. NORMAL ESCALATION PROCEUDRES WOULD BE USED IF PROBLEMS SHOULD ARISE. | SEE UPGRADE PLAN AT G:\EDS\HW CURRENCY\RDAC | THE WINDOWS ADMIN WILL USE SYSTEM TOOLS TO REVIEW THE NEW RDAC VERSION. THE INSTALL LOGS WILL ALSO BE REVIEWED. ALL DRIVES, FILE SYSTEMS, AND DISK PATHING WILL BE CHECKED AFTER THE RDAC UPGRADE. THE DATABASES WILL BE CHECKED AFTER THE SERVER IS BACK ONLINE. | HW/SW CURRENCY | N/A | DANIEL PECORA / DWIGHT BUEHLER | 4/13/05 3:59 PM |
| 21908 | ROBERT HAYNES | 4/30/05 4:00 AM | 4/30/05 2:00 PM | 10 HOURS | No | PRODUCTION | LSV-APPS08, 11 AND 24 | SIEBEL 6.0 PROD | PROMOTION SIEBEL 6.0 QAS REPOSITORY TO SIEBEL 6.0 PROD. | SIEBEL 6.0 PROD WILL BE UNAVAILABLE DUING PROMOTION PROCESS, FOR SIEBEL.SRF REPLACEMENT AND APPLICATION SERVICE CYCLE | N | 4/26/2 | CHRISTINA D'AMICO (Y); ANN BRUINSMA (Y); RAJEEV ANKIREDDYPALLI (Y) | WILLIAM MALLOT (Y) | SIEBEL 6.0 PROD HAS A COLD BACKUP TAKEN EVERY SATURDAY MORNING. RESTORE OF THE DATABASE CAN TAKE FROM 8 TO 10 HOURS. NOTIFY BOB HAYNES IF RESTORE WINDOW IS EXCEEDED. | PROMOTION OF SIEBEL 6.0 QAS REPOSITORY, COMPILATON OF SIEBEL.SRF FILE, CREATION AND DISTRIBUTION OF SIEBEL.SRF KIT, REPLACEMENT OF SIEBEL.SRF WITH NEW COPY AND CYCLE OF APPLICATION SERVICES ON ALL THREE WINDOWS APPLICATION SERVERS | SIEBEL 6.0 QAS FUNCTIONALITY WILL BE AVAILABLE IN PRODUCTION. | RESPOSITORY MIGRATION/PROMOTION | 1083168 | ROBERT HAYNES | 4/19/05 8:56 AM |
| 21916 | ROBERT HAYNES | 4/30/05 4:00 AM | 4/30/05 2:00 PM | 12 HOURS | No | PRODUCTION | SAN MIGUEL CLUSTER | SIEBEL 7.5 PRD | PROMOTION/MIGRATION OF SIEBEL 7.5 QAS REPOSITORY TO SIEBEL 7.5 PRD. | SIEBEL 7.5 WILL BE UNAVAILABLE DURING PROMOTION PROCESS AND SERVICE CYCLE | N | 4/26/2 | CHRISTINA D'AMICO (Y); TED GUDLEVICH (N); ANN BRUINSMA (Y); MARTIN MILES (Y) | WILLIAM MALLOT (Y) | SIEBEL 7.5 PRD DATABASE HAS A COLD BACKUP TAKEN EVERY SATURDAY MORNING. IT CAN TAKE FROM 8 TO 10 HOURS TO RESTORE. CONTACT BOB HAYNES IF RESTORE WINDOW IS EXCEEDED. | MIGRATION/PROMOTION OF SIEBEL 7.5 QAS REPOSITIORY TO SIEBEL 7.5 PRD, COMPILE REPOSITORY, MOVE TO THE PRODUCTION SERVER, GENERATE GENBSCRIPTS AND CYCLE APPLICATION AND WEB SERVICES. | SIEBEL 7.5 QAS APPLICATION UPDATES WILL BE VISIBLE IN SIEBEL 7.5 PRD. | REPOSITORY MIGRATION/PROMOTION | 1083221 | ROBERT HAYNES | 4/19/05 10:44 AM |
| 21896 | ROBERT HAYNES | 4/30/05 8:00 AM | 4/30/05 9:00 AM | 30 MINS | Yes | PRODUCTION | DOLORES/GLADSTONE | SIEBEL 7.5 PRD | INSTALL AND RUN SIEBEL 7.5.3 ENVRIONMENT VERIFICATION TOOL (EVT) ON DOLORES/GLADSTONE. PRODUCES REPORT FOR UNIX ENVIRONMENT VERIFICATION AND TUNING. | NONE | A | 4/19/2 | CHRISTINA D'AMICO (N); ANN BRUINSMA (Y) | WILLIAM MALLOT (Y) | SIEBEL 7.5 PRD DATABASE HAS A COLD BACKUP TAKEN EVERY SATURDAY MORNING AT MIDNIGHT. RESTORE OF THE DATABASE CAN TAKE 8 TO 10 HOURS. CONTACT BOB HAYNES IF RESTORE WINDOW IS EXCEEDED. | INSTALL AND RUN SIEBEL 7.5.3 ENVRIONMENT VERIFICATION TOOL (EVT) ON DOLORES/GLADSTONE. PRODUCES REPORT FOR UNIX ENVIRONMENT VERIFICATION AND TUNING. | ENVRIONMENT VERIFICATION REPORT GENERATED | ENVRIONMENT VERIFICATION | 1082327 | ROBERT HAYNES | 4/15/05 1:49 PM |
| 21849 | GLENN EINSPAHR | 4/30/05 1:00 PM | 4/30/05 5:00 PM | 3 HOURS | Yes | PRODUCTION | SERVERS LISTED BELOW | SQL, EXCHANGE BACKUPS | CSE NEEDS TO TROULBLESHOOT A BACKEND ISSUE ON ARRAY 428-1 AND UPGRADE CODE. THE FOLLOWING SERVERS WILL BE IMPACTED:HQ-SQL01,HQ-SQL02,HQ-SQL03,HQ-SQL04,HQ-SQL06,HQ-SQL07,HQ-SQLDEV01,HQ-SQLSTG01,HQ-SQLSTG02,HQ-SQLSTG03, HQ-XTENDO1. | THERE SHOULD NOT BE AN OUTAGE TO SQL SERVICES WHILE THE ARRAY IS OFF-LINE. STEPS ARE BEING TAKEN TO MAINTAIN SERVICE AVAILABILITY. AFTER CSE PERFORMS WORK ON ARRAY, SQL RESOURCES AND SERVICES WILL NEED TO BE RESTARTED. THIS IS NECESSARY FOR THE DISK DEPENDENCY TO BE ADDED BACK TO THE SQL SERVICE. HQ-XTEND01 WILL BE OFF-LINE DURING THE ARRAY OUTAGE. | A | 4/12/2 | STANLEY CROUSE (N); JAMES FREW (N); CONSTANCE BURKHARD (Y); CHRIS RIVERS (N); TAMARA MILLER (Y); ANDREW ZARTMAN (Y); JACKIE HYNES (N); DWIGHT ALLMON (Y); JUDITH KING (Y); WILLIAM PURCELL (Y); ASHIK MOMEN (Y); THOMAS APPS (Y); PENELOPE BARTELL (N); JESSE SHAFFER (N); MARK MARTI (Y); JUDY HEIN (Y); WENDELL RUSSELL (Y); RAJEEV ANKIREDDYPALLI (N); BARB LARSEN (Y) | JUDITH KING (Y); WENDY DYAKOVICH (Y); KATHY GOODELL (N) | BACKUPS WILL BE COMPLETED THE NIGHT BEFORE. | MODIFY DEPENDENCIES ON SQL CLUSTER RESOURCES. DISK
RESOURCES TAKEN OFF-LINE ON ALL SQL SERVERS. HQ-XTEND01 SHUT DOWN. EXCHANGE
BACKUP VOLUMES TAKEN OFF-LINE. CSE WORKS ON ARRAY. CSE NOTIFIES SERVER TEAM
ONCE COMPLETE. SERVER TEAM VALIDATES DISK CONNECTIVITY. HQ-XTEND01 BROUGHT
ON-LINE. EXCHANGE BACKUP DISK BROUGHT ON-LINE. SQL RESOURCES TAKEN OFF-LINE AND DISK DEPENDENCIES ADDED. SQL RESOURCES BROUGHT ON-LINE. SEV 1 TICKETS WILL BE OPENED TO APPROPRIATE APPLICATION SUPPORT TEAMS. |
ALL DISK WILL BE ACCESSABLE | GLENN EINSPAHR | 4/8/05 2:03 PM | ||
| Sunday, May 01, 2005 | |||||||||||||||||||||
| 21776 | DANIEL PECORA | 5/1/05 7:00 AM | 5/1/05 7:00 PM | 6 HOURS | Yes | PRODUCTION | CONUNDRUM | SEE IMPACT FIELD | UPGRADE THE VERITAS FILE SYSTEM AND VOLUME MANAGER VERSION TO 4.0. REASON: THE VERSION CURRENTLY ON THE SERVER IS WILL NOT BE SUPPORTED AFTER 2005. | THE FOLLOWING APPLICATIONS/DATABASES WILL NOT BE AVAILABLE DURING THE UPGRADE; PINNACLE SNAPSHOT, ECOM, HR/PTO VACATION, RESUMIX, SWATS, LEGACY WAREHOUSE, SIEBEL 6.0. ALSO, WINDOWS SERVERS LSV-APPS08/11/24 WILL NEED A REBOOT ONCE THE SERVER IS BACK ONLINE. | A | 4/19/2 | CHRISTINA D'AMICO (Y); WARREN ROSENBLUM (Y); BARBARA RUCKER (Y); CARLA LEET (Y); ANN BRUINSMA (Y); RAJEEV ANKIREDDYPALLI (Y) | WILLIAM MALLOT (Y); ROBERT HAYNES (Y); JUDITH KING (Y) | FULL AND INCREMENTAL BACKUPS WILL BE CONFIRMED BEFORE THE CHANGE CONTROL STARTS. IF THERE ARE HARDWARE OR BACKUP PROBLEMS, THE CHANGE CONTROL WILL BE CANCELED. IT'S POSSIBLE THAT A FULL SERVER RESTORE COULD TAKE 24 HOURS. NORMAL ESCALATION PROCEDURE WILL BE FOLLOWED. | SEE UPGRADE PLAN AT G:\EDS\HW CURRENCY\VERITAS UPGRADES | USE THE FOLLOWING VERITAS COMMANDS TO CONFIRM DISK GROUP, AND FILE SYSTEM VERSIONS; VXUPGRADE "FILE SYSTEM NAME" : VXDG LIST "DISK GROUP NAME". THE DATABASE AND APPLICATION SUPPORT TEAMS WILL ALSO CHECK THEIR RESPECTIVE DB'S AND APPLICATIONS. | HW/SW CURRENCY | N/A | DANIEL PECORA / JOSE SALAS | 3/24/05 1:07 PM |
| Monday, May 02, 2005 | |||||||||||||||||||||
| 21615 | DANIEL TRUJILLO | 5/2/05 4:00 PM | 5/2/05 8:00 PM | 120 MINS | Yes | PRODUCTION | FLASH - HAYWARD, CA WAN ROUTER | QWEST DOMESTIC WAN | CONVERT THE FLASH - HAYWARD, CA OFFICE TO THE QWEST DOMESTIC WAN FROM THE MCI DOMESTIC WAN | WIDE AREA NETWORK CONNECTIVITY WILL BE LOST FOR 5 MINUTES WHILE THE LOCAL AREA NETWORK IS CUTOVER FROM EXISTING MCI WAN & ROUTER TO NEW QWEST WAN & NEW ROUTER. NEW ROUTER AND CIRCUIT WILL BE INSTALLED AND TESTED PRIOR TO THE CUTOVER IN ORDER TO MINIMIZE DISRUPTION. ACTUAL CUTOVER TIME IS SCHEDULED FOR 12:00 PST | A | 4/12/2 | KATHY GREENBERG (Y) | JAMES WAMSLEY (Y) | RE-CONNECT EXISTING ROUTER AND MCI WAN LINK, CUT LAN BACK OVER TO EXISTING ROUTER FROM THE NEW ONE. | 1 - INSTALL THE NEW ROUTER INTO THE EQUIPMENT RACK 2 - PLUG INTO UPS AND POWER UP 3 - DISCONNECT THE EXTERNAL MODEM FROM THE EXISTING ROUTER AND CONNECT IT TO THE NEW ROUTER AND TEST CONNECTIVITY. 4 - ACTIVATE THE NEW WAN CIRCUIT WITH QWEST, TEST FROM LOUISVILLE. 5 - DISCONNECT THE ETHERNET CABLE CONNECTING THE EXISTING ROUTER TO THE CISCO LAN SWITCH FROM EXISTING ROUTER AND PLUG IT INTO THE NEW ROUTER, CONNECT NEW ROUTER TO NEW WAN CIRCUIT. 6 - TEST NEW CONNECTION IN OFFICE AND REMOTELY VIA HQ | VERIFY CONSOLE CONNECTIVITY TO NEW ROUTER & OFFICE LAN VIA THE QWEST DOMESTIC WAN. QWEST ENGINEERING CONFIRMATION OF CONNECTIVITY AT THE TIME OF THE CUTOVER. VALIDATION BY LOCAL OFFICE STAFF. | WAN CONVERSION | N/A | DANIEL TRUJILLO / JAMES WAMSLEY | 2/24/05 5:39 PM |
| Tuesday, May 03, 2005 | |||||||||||||||||||||
| 21467 | DANIEL TRUJILLO | 5/3/05 9:00 AM | 5/3/05 1:00 PM | 120 MINS | Yes | PRODUCTION | HOLLYWOOD, FL WAN ROUTER | QWEST DOMESTIC WAN | CONVERT THE HOLLYWOOD, FL (MIAMI) OFFICE TO THE QWEST DOMESTIC WAN FROM THE MCI DOMESTIC WAN | WIDE AREA NETWORK CONNECTIVITY WILL BE LOST FOR 5 MINUTES WHILE THE LOCAL AREA NETWORK IS CUTOVER FROM EXISTING MCI WAN & ROUTER TO NEW QWEST WAN & NEW ROUTER. NEW ROUTER AND CIRCUIT WILL BE INSTALLED AND TESTED PRIOR TO THE CUTOVER IN ORDER TO MINIMIZE DISRUPTION. ACTUAL CUTOVER TIME IS SCHEDULED FOR 12:00 CST. | A | 2/23/2 | WILLIAM BRUCE (N) | JAMES WAMSLEY (N) | RE-CONNECT EXISTING ROUTER AND MCI WAN LINK, CUT LAN BACK OVER TO EXISTING ROUTER FROM THE NEW ONE. | 1 - INSTALL THE NEW ROUTER INTO THE EQUIPMENT RACK 2 - PLUG INTO UPS AND POWER UP 3 - DISCONNECT THE EXTERNAL MODEM FROM THE EXISTING ROUTER AND CONNECT IT TO THE NEW ROUTER AND TEST CONNECTIVITY. 4 - ACTIVATE THE NEW WAN CIRCUIT WITH QWEST, TEST FROM LOUISVILLE. 5 - DISCONNECT THE ETHERNET CABLE CONNECTING THE EXISTING ROUTER TO THE CISCO LAN SWITCH FROM EXISTING ROUTER AND PLUG IT INTO THE NEW ROUTER, CONNECT NEW ROUTER TO NEW WAN CIRCUIT. 6 - TEST NEW CONNECTION IN OFFICE AND REMOTELY VIA HQ | VERIFY CONSOLE CONNECTIVITY TO NEW ROUTER & OFFICE LAN VIA THE QWEST DOMESTIC WAN. VALIDATION BY LOCAL OFFICE STAFF | WAN CONVERSION | N/A | DANIEL TRUJILLO / RONALD STEVENS | 2/14/05 9:41 AM |
| Future Re | |||||||||||||||||||||
| 21617 | DANIEL TRUJILLO | 5/3/05 4:30 PM | 5/3/05 8:30 PM | 120 MINS | Yes | PRODUCTION | FLASH DENVER, CO WAN ROUTER | QWEST DOMESTIC WAN | CONVERT THE FLASH LOGISTICS, DENVER OFFICE TO THE QWEST DOMESTIC WAN FROM THE MCI DOMESTIC WAN | WIDE AREA NETWORK CONNECTIVITY WILL BE LOST FOR 5 MINUTES WHILE THE LOCAL AREA NETWORK IS CUTOVER FROM EXISTING MCI WAN & ROUTER TO NEW QWEST WAN & NEW ROUTER. NEW ROUTER AND CIRCUIT WILL BE INSTALLED AND TESTED PRIOR TO THE CUTOVER IN ORDER TO MINIMIZE DISRUPTION. ACTUAL CUTOVER TIME IS SCHEDULED FOR 12:00 MST. | N | 4/19/2 | KATHY GREENBERG (Y) | JAMES WAMSLEY (Y) | RE-CONNECT EXISTING ROUTER AND MCI WAN LINK, CUT LAN BACK OVER TO EXISTING ROUTER FROM THE NEW ONE. | 1 - INSTALL THE NEW ROUTER INTO THE EQUIPMENT RACK 2 - PLUG INTO UPS AND POWER UP 3 - DISCONNECT THE EXTERNAL MODEM FROM THE EXISTING ROUTER AND CONNECT IT TO THE NEW ROUTER AND TEST CONNECTIVITY. 4 - ACTIVATE THE NEW WAN CIRCUIT WITH QWEST, TEST FROM LOUISVILLE. 5 - DISCONNECT THE ETHERNET CABLE CONNECTING THE EXISTING ROUTER TO THE CISCO LAN SWITCH FROM EXISTING ROUTER AND PLUG IT INTO THE NEW ROUTER, CONNECT NEW ROUTER TO NEW WAN CIRCUIT. 6 - TEST NEW CONNECTION IN OFFICE AND REMOTELY VIA HQ | VERIFY CONSOLE CONNECTIVITY TO NEW ROUTER & OFFICE LAN VIA THE QWEST DOMESTIC WAN. QWEST ENGINEERING CONFIRMATION OF CONNECTIVITY AT THE TIME OF THE CUTOVER. VALIDATION BY LOCAL OFFICE STAFF. | WAN CONVERSION | N/A | DANIEL TRUJILLO / JAMES WAMSLEY | 2/24/05 5:43 PM |
| 21628 | DANIEL TRUJILLO | 5/3/05 6:00 PM | 5/3/05 11:00 PM | 120 MINS | Yes | PRODUCTION | WIPRO REDWOOD CITY WAN ROUTER | QWEST DOMESTIC WAN | CONVERT THE WIPRO TECHNOLOGIES REDWOOD CITY, CA PARTNER CONNECTION OFFICE TO THE QWEST DOMESTIC WAN FROM THE MCI DOMESTIC WAN | WIDE AREA NETWORK CONNECTIVITY WILL BE LOST FOR 30-45 MINUTES WHILE EXISTING CISCO ROUTER IS RECONFIGURED FOR THE QWEST IQ NETWORK (WE ARE NOT REPLACING AN EXISTING ROUTER AT THIS SITE) | N | 4/19/2 | ROBERT YOUNKIN (N) | JAMES WAMSLEY (Y) | RE-CONFIGURE THE CISCO ROUTER TO THE MCI WAN CONFIGURATION. RE-CONNECT EXISTING MCI WAN LINK, TEST CONNECTIVITY VIA MCI WAN CONSOLE. | 1 - TAKE ROUTER OFFLINE. 2 - RECONFIGURE THE ROUTER FOR THE NEW ROUTING PROTOCOL (BORDER GATEWAY PROTOCOL) ON THE QWEST IQ WAN. 3 - TURN UP THE NEW QWEST CIRCUIT AND TEST FOR CONNECTIVITY | VERIFY CONSOLE CONNECTIVITY TO NEW ROUTER & OFFICE LAN VIA THE QWEST DOMESTIC WAN. QWEST ENGINEERING CONFIRMATION OF CONNECTIVITY AT THE TIME OF THE CUTOVER. VALIDATION BY LOCAL OFFICE STAFF. | WAN CONVERSION | N/A | DANIEL TRUJILLO / JAMES WAMSLEY | 2/25/05 4:24 PM |
| 21918 | LESLIE CHISUM | 5/4/05 7:30 AM | 5/4/05 8:30 AM | 30 MINS | Yes | PRODUCTION | SUGERLOAF | NETWORK MONITORING | MOVE SINGLE SOURCE POWER DROP FOR SERVER SUGERLOAF FROM CPC 1 TO CPC 10 SO THAT CPC CAN BE REPLACED. | NETWORK MONITORING WILL BE UNAVAILABLE WHILE SERVER IS POWERED DOWN FOR POWER DROP CHANGE. | N | 4/26/2 | WARREN ROSENBLUM (Y) | RITA ROTE (Y) | RECONNECT SERVER TO CPC 1 POWER SOURCE | POWER SOURCE FROM CPC 1 WILL BE UNPLUGGED AND LINE FROM CPC 10 WILL BE PLUGGED IN. | SERVER POST TEST. | 1083381 | LESLIE CHISUM | 4/19/05 2:04 PM | |
| 21885 | DANIEL PECORA | 5/4/05 9:00 AM | 5/4/05 3:00 PM | 3 HOURS | Yes | PRODUCTION | HQ-SSV01 | CAMPUS SECURITY SERVER | UPGRADE THE LEVEL OF RDAC (MULTI-PATHING SOFTWARE) FROM 8.40.G2.02 TO 9.10.G2.01 REASON: RDAC LEVEL MUST BE ABOVE VERSION 9 BEFORE THE DISK ARRAY FIRMWARE CAN BE UPGRADED. IT IS ALSO A CURRENCY LEVEL ITEM. | THE SECURITY ARCHIVING SERVICES WILL BE UNAVAILABLE DURING THE DRIVER UPGRADE. SECURITY SCANNING WILL STILL BE AVAILABLE ON HQ-SSV02. | N | 4/19/2 | TAMARA MILLER (Y) | WARREN ROSENBLUM (Y) | IF NECESSARY, THE ORIGINAL VERSION WOULD BE REINSTALLED. THE ONLY PROBLEM WITH THAT IS, IT WILL HOLD UP OUR MADATORY DISK ARRAY CODE UPGRADE. IF A FULL SERVER RESTORE IS REQUIRED, 24 HOURS MAY BE NEEDED. NORMAL ESCALATION PROCEUDRES WOULD BE USED IF PROBLEMS SHOULD ARISE. | SEE UPGRADE PLAN AT G:\EDS\HW CURRENCY\RDAC | THE WINDOWS ADMIN WILL USE SYSTEM TOOLS TO REVIEW THE NEW RDAC VERSION. THE INSTALL LOGS WILL ALSO BE REVIEWED. ALL DRIVES, FILE SYSTEMS, AND DISK PATHING WILL BE CHECKED AFTER THE RDAC UPGRADE. THE SECURITY APPLICATION WILL BE CHECKED AFTER THE SERVER IS BACK ONLINE. | HW/SW CURRENCY | N/A | DANIEL PECORA / MATT BAROODY | 4/14/05 9:06 AM |
| 21886 | DANIEL PECORA | 5/4/05 9:00 AM | 5/4/05 3:00 PM | 3 HOURS | Yes | PRODUCTION | HQ-SSV02 | CAMPUS SECURITY SERVER | UPGRADE THE LEVEL OF RDAC (MULTI-PATHING SOFTWARE) FROM 8.40.G2.02 TO 9.10.G2.01 REASON: RDAC LEVEL MUST BE ABOVE VERSION 9 BEFORE THE DISK ARRAY FIRMWARE CAN BE UPGRADED. IT IS ALSO A CURRENCY LEVEL ITEM. | THE SECURITY ARCHIVING SERVICES WILL BE UNAVAILABLE DURING THE DRIVER UPGRADE. SECURITY SCANNING WILL STILL BE AVAILABLE ON HQ-SSV01. | N | 4/19/2 | TAMARA MILLER (Y) | WARREN ROSENBLUM (Y) | IF NECESSARY, THE ORIGINAL VERSION WOULD BE REINSTALLED. THE ONLY PROBLEM WITH THAT IS, IT WILL HOLD UP OUR MADATORY DISK ARRAY CODE UPGRADE. IF A FULL SERVER RESTORE IS REQUIRED, 24 HOURS MAY BE NEEDED. NORMAL ESCALATION PROCEUDRES WOULD BE USED IF PROBLEMS SHOULD ARISE. | SEE UPGRADE PLAN AT G:\EDS\HW CURRENCY\RDAC | THE WINDOWS ADMIN WILL USE SYSTEM TOOLS TO REVIEW THE NEW RDAC VERSION. THE INSTALL LOGS WILL ALSO BE REVIEWED. ALL DRIVES, FILE SYSTEMS, AND DISK PATHING WILL BE CHECKED AFTER THE RDAC UPGRADE. THE SECURITY APPLICATION WILL BE CHECKED AFTER THE SERVER IS BACK ONLINE. | HW/SW CURRENCY | N/A | DANIEL PECORA / MATT BAROODY | 4/14/05 9:07 AM |
| 21984 | KEITH HUITT | 5/4/05 9:00 AM | 5/5/05 5:00 PM | 2 DAYS | N/A | DEVELOPMENT | LSV-ITS02 | SAP ITS | UPGRADE ITS FROM VERSION 610 TO VERSION 620 TO SUPPORT THE WORKPLACE TO ENTERPRISE PORTAL PROJECT. | ITS DEVELOPMENT. ESS/ITS SUPPORT WILL BE DONE FROM THE ITS INSTANCES (DVL/TST/QAS) THAT ARE NOW ON LSV-TST01. | N | -- NO BUSINESS APPROVER(S) ASSIGNED -- | WARREN ROSENBLUM (N); GREG SCHAFER (N) | UNINSTALL VERSION 620 AND INSTALL 610 THEN COPY THE CURRENT TEMPLATE AND MIMES FROM THE BACKUP THAT WILL BE TAKEN PRIOR TO ANY WORK BEING DONE ON THE SERVER. | I WILL BE UNINSTALLING THE CURRENT VERSION (610) OF ITS ON LSV-ITS02 THEN USING THE SAP INSTALLATION TOOL SAPINST I WILL THEN INSTALL THE 620 INSTANCES FOR DVL, TST AND QAS. AFTER THE INSTALLATION IS COMPLETE I WILL COPY OVER THE CUSTOM EXTERNAL SITES TEMPLATES AND MIMES FROM THE BACKUP (Z* FOLDERS). | I'M ABLE TO ACCESS SAP DVL, TST AND QAS VIA THE ITS SERVER (WEB BROWSER). I WILL ALSO BE ABLE TO ACCESS THE ITS ADMIN TOOL. | WORKPLACE MIGRATION | KEITH HUITT | 4/28/05 11:28 AM | ||
| 21605 | DANIEL TRUJILLO | 5/4/05 5:00 PM | 5/4/05 9:00 PM | 120 MINS | Yes | PRODUCTION | PCS-FREEMONT, CA WAN ROUTER | QWEST DOMESTIC WAN | CONVERT THE PCS PARTNER CONNECTION - FREEMONT, CA OFFICE TO THE QWEST DOMESTIC WAN FROM THE MCI DOMESTIC WAN | WIDE AREA NETWORK CONNECTIVITY WILL BE LOST FOR 5-10 MINUTES WHILE THE LOCAL AREA NETWORK IS CUTOVER FROM EXISTING MCI WAN & ROUTER TO NEW QWEST WAN & NEW ROUTER. NEW ROUTER AND CIRCUIT WILL BE INSTALLED AND TESTED PRIOR TO THE CUTOVER IN ORDER TO MINIMIZE DISRUPTION. ACTUAL CUTOVER TIME IS SCHEDULED FOR 12:00 PM | N | 4/12/2 | KATHY GREENBERG (Y) | JAMES WAMSLEY (Y) | RE-CONNECT EXISTING ROUTER AND MCI WAN LINK, CUT LAN BACK OVER TO EXISTING ROUTER FROM THE NEW ONE. | 1 - INSTALL THE NEW ROUTER INTO THE EQUIPMENT RACK 2 - PLUG INTO UPS AND POWER UP 3 - DISCONNECT THE EXTERNAL MODEM FROM THE EXISTING ROUTER AND CONNECT IT TO THE NEW ROUTER AND TEST CONNECTIVITY. 4 - ACTIVATE THE NEW WAN CIRCUIT WITH QWEST, TEST FROM LOUISVILLE. 5 - DISCONNECT THE ETHERNET CABLE CONNECTING THE EXISTING ROUTER TO THE CISCO LAN SWITCH FROM EXISTING ROUTER AND PLUG IT INTO THE NEW ROUTER, CONNECT NEW ROUTER TO NEW WAN CIRCUIT. 6 - TEST NEW CONNECTION IN OFFICE AND REMOTELY VIA HQ | VERIFY CONSOLE CONNECTIVITY TO NEW ROUTER & OFFICE LAN VIA THE QWEST DOMESTIC WAN. QWEST ENGINEERING CONFIRMATION OF CONNECTIVITY AT THE TIME OF THE CUTOVER. VALIDATION BY LOCAL OFFICE STAFF. | WAN CONVERSION | N/A | DANIEL TRUJILLO / JAMES WAMSLEY | 2/24/05 4:29 PM |
| 21969 | BRAD BALLARD | 5/5/05 8:00 AM | 5/5/05 12:00 PM | 4 HOURS | No | PRODUCTION | FARWELL, KATAKA, ELBERT | CIF DATA WAREHOUSE | WEEKLY PROMOTION OF CIF CODE, DATABASE AND SCHEDULING CHANGES, AND DATA MAINTENANCE | NO SERVER OR DATABASE OUTAGE, AGREEMENT WITH AFFECTED USERS WILL BE NEGOTIATED PRIOR TO WINDOW. | N | CHERYL LANDWEHR (N); CARLA LEET (N) | SUE TORRERO (N) | DEFINED AND APPROVED BEFORE WINDOW | DEFINED AND APPROVED BEFORE WINDOW | DEFINED AND APPROVED BEFORE WINDOW | CIF SUPPORT | BRAD BALLARD / JABAKUMAR ISAAC | 4/26/05 10:34 AM | ||
| 21630 | DANIEL TRUJILLO | 5/5/05 9:00 AM | 5/5/05 1:00 PM | 120 MINS | Yes | PRODUCTION | BELL SOUTH- JACKSON WAN ROUTER | QWEST DOMESTIC WAN | CONVERT THE BELL SOUTH - JACKSON, MS OFFICE TO THE QWEST DOMESTIC WAN FROM THE MCI DOMESTIC WAN | WIDE AREA NETWORK CONNECTIVITY WILL BE LOST FOR 30-45 MINUTES WHILE EXISTING CISCO ROUTER IS RECONFIGURED FOR THE QWEST IQ NETWORK (WE ARE NOT REPLACING AN EXISTING ROUTER AT THIS SITE) | N | 4/19/2 | LARRY MANUEL (N) | JAMES WAMSLEY (Y) | RE-CONFIGURE THE CISCO ROUTER TO THE MCI WAN CONFIGURATION. RE-CONNECT EXISTING MCI WAN LINK, TEST CONNECTIVITY VIA MCI WAN CONSOLE. | 1 - TAKE ROUTER OFFLINE. 2 - RECONFIGURE THE ROUTER FOR THE NEW ROUTING PROTOCOL (BORDER GATEWAY PROTOCOL) ON THE QWEST IQ WAN. 3 - TURN UP THE NEW QWEST CIRCUIT AND TEST FOR CONNECTIVITY | VERIFY CONSOLE CONNECTIVITY TO NEW ROUTER & OFFICE LAN VIA THE QWEST DOMESTIC WAN. QWEST ENGINEERING CONFIRMATION OF CONNECTIVITY AT THE TIME OF THE CUTOVER. VALIDATION BY LOCAL OFFICE STAFF. | WAN CONVERSION | N/A | DANIEL TRUJILLO / JAMES WAMSLEY | 2/25/05 4:34 PM |
| 21835 | STEPHEN PARKER | 5/5/05 11:00 AM | 5/5/05 12:00 PM | 1 HOURS | Yes | PRODUCTION | HQ-WEB01 | HR | WORK ORDER - 1077063 ADD "GRANT SPECIAL ACCESS" TO REWARD AND RECOGNITION. DOCUMENTATION ON WO AVAILABLE AT LSV-DFS01/BET/PROJECTS/6-WORK ORDERS/E-BUSINESS/1077063 | HR - REWARD AND RECOGNITION. NO REBOOT OR IIS RESTART REQUIRED. | N | 4/19/2 | BARBARA RUCKER (Y) | SARAH KENNEDY (Y) | THE OLD ASPS HAVE BEEN COPIED TO A SAVE CODE LOCATION. IF THE MOVE FAILS, THE OLD ASPS WILL BE RESTORED. | APS'S WILL BE MOVED FROM THE DEVELOPMENT ENVIROMENT HQ-DEV01 TO THE PRODUCTION ENVIROMENT HQ-WEB01 | ASP DATES IN PRODUCTION WILL MATCH THOSE IN DEVELOPMENT. UPON MOVEMENT, THE PRODUCTION SYSTEM WILL IMMEDIATELY BE TESTED FOR FUNCTIONALITY BY THE DEVELOPER AND CUSTOMER. | WORK ORDER | 1077063 | STEPHEN PARKER | 4/6/05 12:41 PM |
| 21821 | SCOTT ANDERSEN | 5/5/05 6:00 PM | 5/5/05 7:00 PM | 60 MINS | Yes | PRODUCTION | HQ-ASP01 | PORTAL ADMIN | IMPLEMENTING PRODUCTION PORTAL ADMIN SITE FOR MAINTAINING SBA PORTAL SECURITY. | NONE - NO CURRENT USERS IN PRODUCTION. BILL PURCELL USING DEVELOPMENT VERSION UNTIL PRODUCTION IS AVAILABLE. | N | 4/19/2 | WILLIAM PURCELL (N) | BRADFORD ANDERSON (N); SCOTT ANDERSEN (Y) | REMOVE SITE. | CREATE A NEW WEBSITE ON HQ-ASP01. THE WEB SITE SHOULD BE NAMED PORTALADMIN, URL IS PORTALADMIN.STORTEK.COM. (DNS ENTRY ALREADY MADE.) A NEW APP POOL WILL ALSO NEED TO BE CREATED WITH AN IDENTITY OF LOUISVILLE\SVC-SHAREPOINTSECSA. | APPLICATION IS AVAILABLE. | SBA PORTAL | SCOTT ANDERSEN / CHRIS WILPER | 4/1/05 11:51 AM | |
| 21887 | DANIEL PECORA | 5/5/05 8:00 PM | 5/6/05 4:00 AM | 4 HOURS | Yes | PRODUCTION | LSV-NAS01 | CORPORATE WINS (HQ) AND DHCP (HQ/NA) CLUSTER | UPGRADE THE LEVEL OF RDAC (MULTI-PATHING SOFTWARE) FROM 8.30.92 TO 9.10.G2.01 REASON: RDAC LEVEL MUST BE ABOVE VERSION 9 BEFORE THE DISK ARRAY FIRMWARE CAN BE UPGRADED. IT IS ALSO A CURRENCY LEVEL ITEM. | SERVICES: WINS/DHCP/CISCO SECURE, AND IXOS ORDER LOAD BALANCER (USER INITIATED). NO OUTAGE FOR THE FOLLOWING; WINS/DHCP/CISCO SECURE/IXOS. SINCE THE TWO SERVERS ARE CLUSTERED, THERE WILL ONLY BE A BRIEF MOMENT WHEN WINS/DHCP/IXOS/CISCO SECURE SERVICES ARE FAILING OVER FROM ONE NODE TO THE OTHER NODE AND BACK AFTER THE INSTALL HAS COMPLETED. EXPECT 2-4 FAIL-OVERS TO OCCUR DURING THE UPGRADE. | N | 4/19/2 | WARREN ROSENBLUM (Y); DWIGHT ALLMON (Y); JOHN ROSS (Y); BARB LARSEN (Y) | DANIEL PECORA (Y) | IF NECESSARY, THE ORIGINAL VERSION WOULD BE REINSTALLED. THE ONLY PROBLEM WITH THAT IS, IT WILL HOLD UP OUR MADATORY DISK ARRAY CODE UPGRADE. IF A FULL SERVER RESTORE IS REQUIRED, 24 HOURS MAY BE NEEDED. NORMAL ESCALATION PROCEUDRES WOULD BE USED IF PROBLEMS SHOULD ARISE. SINCE WE ARE UPGRADING ONE SIDE OF THE CLUSTER AT A TIME, IF PROBLEMS ARISE, WE CAN EITHER STOP AND FIX THE PROBLEM, OR REVERT BACK, OR RUN ON ONE SIDE OF THE CLUSTER. MANAGENMENT CAN MAKE THAT DECISION. | SEE UPGRADE PLAN AT G:\EDS\HW CURRENCY\RDAC | THE WINDOWS ADMIN WILL USE SYSTEM TOOLS TO REVIEW THE NEW RDAC VERSION. THE INSTALL LOGS WILL ALSO BE REVIEWED. ALL DRIVES, FILE SYSTEMS, AND DISK PATHING WILL BE CHECKED AFTER THE RDAC UPGRADE. THE SERVICES (WINS/DHCP/CISCO SECURE, AND IXOS ORDER LOAD BALANCER) WILL BE CHECKED AFTER THE UPGRADE HAS BEEN COMPLETED. | HW/SW CURRENCY | N/A | DANIEL PECORA / DWIGHT BUEHLER | 4/14/05 9:52 AM |
| 21888 | DANIEL PECORA | 5/5/05 8:00 PM | 5/6/05 4:00 AM | 4 HOURS | Yes | PRODUCTION | LSV-NAS02 | CORPORATE WINS (HQ) AND DHCP (HQ/NA) CLUSTER | UPGRADE THE LEVEL OF RDAC (MULTI-PATHING SOFTWARE) FROM 8.30.92 TO 9.10.G2.01 REASON: RDAC LEVEL MUST BE ABOVE VERSION 9 BEFORE THE DISK ARRAY FIRMWARE CAN BE UPGRADED. IT IS ALSO A CURRENCY LEVEL ITEM. | SERVICES: WINS/DHCP/CISCO SECURE, AND IXOS ORDER LOAD BALANCER (USER INITIATED). NO OUTAGE FOR THE FOLLOWING; WINS/DHCP/CISCO SECURE/IXOS. SINCE THE TWO SERVERS ARE CLUSTERED, THERE WILL ONLY BE A BRIEF MOMENT WHEN WINS/DHCP/IXOS/CISCO SECURE SERVICES ARE FAILING OVER FROM ONE NODE TO THE OTHER NODE AND BACK AFTER THE INSTALL HAS COMPLETED. EXPECT 2-4 FAIL-OVERS TO OCCUR DURING THE UPGRADE. | N | 4/19/2 | WARREN ROSENBLUM (Y); DWIGHT ALLMON (Y); JOHN ROSS (Y); BARB LARSEN (Y) | DANIEL PECORA (Y) | IF NECESSARY, THE ORIGINAL VERSION WOULD BE REINSTALLED. THE ONLY PROBLEM WITH THAT IS, IT WILL HOLD UP OUR MADATORY DISK ARRAY CODE UPGRADE. IF A FULL SERVER RESTORE IS REQUIRED, 24 HOURS MAY BE NEEDED. NORMAL ESCALATION PROCEUDRES WOULD BE USED IF PROBLEMS SHOULD ARISE. SINCE WE ARE UPGRADING ONE SIDE OF THE CLUSTER AT A TIME, IF PROBLEMS ARISE, WE CAN EITHER STOP AND FIX THE PROBLEM, OR REVERT BACK, OR RUN ON ONE SIDE OF THE CLUSTER. MANAGENMENT CAN MAKE THAT DECISION. | SEE UPGRADE PLAN AT G:\EDS\HW CURRENCY\RDAC | THE WINDOWS ADMIN WILL USE SYSTEM TOOLS TO REVIEW THE NEW RDAC VERSION. THE INSTALL LOGS WILL ALSO BE REVIEWED. ALL DRIVES, FILE SYSTEMS, AND DISK PATHING WILL BE CHECKED AFTER THE RDAC UPGRADE. THE SERVICES (WINS/DHCP/CISCO SECURE, AND IXOS ORDER LOAD BALANCER) WILL BE CHECKED AFTER THE UPGRADE HAS BEEN COMPLETED. | HW/SW CURRENCY | N/A | DANIEL PECORA / DWIGHT BUEHLER | 4/14/05 9:52 AM |
| 21627 | DANIEL TRUJILLO | 5/6/05 10:00 AM | 5/6/05 2:00 PM | 120 MINS | Yes | PRODUCTION | LITTLE ROCK, AR WAN ROUTER | QWEST DOMESTIC WAN | CONVERT THE LITTLE ROCK, AR OFFICE TO THE QWEST DOMESTIC WAN FROM THE MCI DOMESTIC WAN | WIDE AREA NETWORK CONNECTIVITY WILL BE LOST FOR 30-45 MINUTES WHILE EXISTING CISCO ROUTER IS RECONFIGURED FOR THE QWEST IQ NETWORK (WE ARE NOT REPLACING AN EXISTING ROUTER AT THIS SITE) | N | 4/19/2 | GEOFFREY RENNIE (N) | JAMES WAMSLEY (N) | RE-CONFIGURE THE CISCO ROUTER TO THE MCI WAN CONFIGURATION. RE-CONNECT EXISTING MCI WAN LINK, TEST CONNECTIVITY VIA MCI WAN CONSOLE. | 1 - TAKE ROUTER OFFLINE. 2 - RECONFIGURE THE ROUTER FOR THE NEW ROUTING PROTOCOL (BORDER GATEWAY PROTOCOL) ON THE QWEST IQ WAN. 3 - TURN UP THE NEW QWEST CIRCUIT AND TEST FOR CONNECTIVITY | VERIFY CONSOLE CONNECTIVITY TO NEW ROUTER & OFFICE LAN VIA THE QWEST DOMESTIC WAN. QWEST ENGINEERING CONFIRMATION OF CONNECTIVITY AT THE TIME OF THE CUTOVER. VALIDATION BY LOCAL OFFICE STAFF. | WAN CONVERSION | N/A | DANIEL TRUJILLO / JAMES WAMSLEY | 2/25/05 4:20 PM |
| 21799 | TONY HUFF | 5/6/05 12:00 PM | 5/6/05 3:00 PM | 1 HOURS | Yes | PRODUCTION | NISA | NETBACKUP | GREG SHAW IS REQUESTING THAT WE ADD A SYSKONNECT CARD TO SERVER NISA AS THE PRIMARY GIGABIT INTERFACE. | NO IMPACT, ALL NETBACKUP FUNCTIONS WILL BE FAILED OVER TO STAR. | N | 4/5/20 | DWIGHT ALLMON (N) | TONY HUFF (N) | REPLACING THE SYSKONNECT CART WITH THE ORIGINAL GIG-ETHER CARD. BACKUPS WILL HAVE RUN ON THE PREVIOUS DAY. | SERVICES ON NISA WILL BE FAILED OVER TO STAR. SYSTEM WILL BE BROUGHT DOWN. CSE WILL REPLACE THE GIG-ETHER CARD WITH THE NEW SYSKONNECT CARD. SYSTEM WILL BE BROUGHT BACKUP. THE NEW SYSKONNECT CARD WILL BE CONFIGUED. THE SYSTEM WILL BE REBOOTED AND ASSUMME IT'S NETBACKUP SERVICES. | IFCONFIG -A | 1071078 | TONY HUFF | 3/29/05 1:58 PM | |
| 21953 | DANIEL TRUJILLO | 5/6/05 5:00 PM | 5/6/05 10:00 PM | 120 MINS | No | PRODUCTION | NORCROSS, GA WAN ROUTER | QWEST DOMESTIC WAN | RESCHEDULED PER CR 21598: CONVERT THE NORCROSS, GA OFFICE TO THE QWEST DOMESTIC WAN FROM THE MCI DOMESTIC WAN. INSTALL UPGRADED BANDWIDTH ON QWEST WAN: FROM 4.5MBIT TO 6.0MBIT. | WIDE AREA NETWORK CONNECTIVITY WILL BE LOST MOMENTARILIY WHILE THE LOCAL AREA NETWORK IS CUTOVER FROM EXISTING MCI WAN & ROUTER TO NEW QWEST WAN & NEW ROUTER. NEW ROUTER AND CIRCUIT WILL BE INSTALLED AND TESTED PRIOR TO THE CUTOVER IN ORDER TO MINIMIZE DISRUPTION. ACTUAL CUTOVER TIME IS SCHEDULED FOR 8:00 PM EST | N | 4/26/2 | MARY MILLS (N); JENNIFER ODEN (N); JAMES PEPPERCORN (N); DENISE KAROLL (N); JOHN ROSS (N) | JAMES WAMSLEY (N); CURTIS CARROLL (N) | RE-CONNECT EXISTING ROUTER AND MCI WAN LINK, CUT LAN BACK OVER TO EXISTING ROUTER FROM THE NEW ONE. | 1 - INSTALL THE NEW ROUTER INTO THE EQUIPMENT RACK 2 - PLUG INTO UPS AND POWER UP 3 - DISCONNECT THE EXTERNAL MODEM FROM THE EXISTING ROUTER AND CONNECT IT TO THE NEW ROUTER AND TEST CONNECTIVITY. 4 - ACTIVATE THE NEW WAN CIRCUIT WITH QWEST, TEST FROM LOUISVILLE. 5 - DISCONNECT THE ETHERNET CABLE CONNECTING THE EXISTING ROUTER TO THE CISCO LAN SWITCH FROM EXISTING ROUTER AND PLUG IT INTO THE NEW ROUTER, CONNECT NEW ROUTER TO NEW WAN CIRCUIT. 6 - TEST NEW CONNECTION IN OFFICE AND REMOTELY VIA HQ | VERIFY CONSOLE CONNECTIVITY TO NEW ROUTER & OFFICE LAN VIA THE QWEST DOMESTIC WAN. QWEST ENGINEERING CONFIRMATION OF CONNECTIVITY AT THE TIME OF THE CUTOVER. VALIDATION BY LOCAL OFFICE STAFF. | WAN CONVERSION | DANIEL TRUJILLO / JAMES WAMSLEY | 4/25/05 8:42 AM | |
| 21867 | LAWRENCE STENGER | 5/6/05 6:00 PM | 5/6/05 8:00 PM | 30 MINS | Yes | PRODUCTION | ENTERPRISE EXCHANGE SYSTEM | EXCHANGE 2003 | TURN ON EXCHANGE 2003 NATIVE MODE IN OUR WORLD WIDE EXCHANGE 2003 ENVIRONMENT | ALL E-MAIL USERS COULD BE IMPACTED. NO OUTAGE IS PREDICTED FOR USERS. | N | 4/19/2 | DWIGHT ALLMON (N); MARTIN MILES (N) | JAMES FREW (N); PAUL CHARLISH (N) | TBD | TURN ON EXCHANGE 2003 NATIVE MODE. | EXCHANGE 2003 SERVERS ARE IN NATIVE MODE | WORK ORDER # 1081064 | 1081064 | RICK ANTCLIFF / PAUL CHARLISH | 4/12/05 4:21 PM |
| 21976 | SATISH VEGESNA | 5/6/05 7:00 PM | 5/6/05 7:30 PM | 30 MINS | No | PRODUCTION | MCKENNA & WASSACH | CLARIFY | THIS IS A STANDARD CHANGE CONTROL FOR ANY CLARIFY NON SCHEMA CHANGES TO BE RELEASD FOR THE WEEK. THIS WILL REQUIRE NO DOWN TIME TO USERS. | SINCE CHANGE WILL REQUIRE NO DOWN TIME TO USERS, THE USERS NEED TO UPDATE THEIR DESKTOP TO GET THE LATEST CODE. THE DETAILED IMPACT WILL BE COMMUNICATED TO THE USER SEPARATELY. | N | WARREN ROSENBLUM (N); BARB LARSEN (N) | WILLIAM MALLOT (N) | PROMOTE THE PREVIOUS VERSION OF THE CODE FROM SOURCE SAFE. | SEND COMMUNICATION TO USERS ON THE CHANGE. PROMOTE THE NEW CODE TO PRODUCTION. VALIDATE THE CHANGES. VALIDATE THE SYSTEM. RELEASE THE SYSTEM TO USERS. | PERFORM THE VALIDATION TASKS FOR THE CHANGE. | STANDARD FRIDAY NIGHT 7:00 PM | SATISH VEGESNA | 4/26/05 3:39 PM | ||
| 21919 | CARLOS SILVA | 5/6/05 7:00 PM | 5/7/05 12:00 AM | 2 HOURS | Yes | PRODUCTION | XX-PTL01 AND XX-PTL02 | SHAREPOINT PORTAL | IMPLEMENT CODE AND DATABASE CHANGES TO PORTAL, SBA AND SALES COMMUNITY. | ALL PORTAL APPLICATIONS (SBA AND SALES COMM) WILL BE MOMENTARILY UNAVAILABLE. | N | 4/26/2 | WILLIAM PURCELL (N); PENELOPE BARTELL (N) | CARL NEER (Y); CARLOS SILVA (Y); SCOTT ANDERSEN (Y) | RUN THE INSTALLATION JOBS FOR THE PORTAL APPLICATIONS POINTING TO PREVIOUS RELEASE. | RECORD THE CURRENT APPLICATION RELEASE. EXECUTE THE INSTALLATION JOBS FOR THE PORTAL APPLICATIONS AND EXECUTE THE DATABASE SCRIPTS. | PORTAL AND APPLICATIONS ARE AVAILABLE THRU HTTPS://PORTAL.STORAGETEK.COM | PORTAL | CARLOS SILVA / COREY EVANS | 4/19/05 2:47 PM | |
| 21930 | DANIEL PECORA | 5/6/05 8:00 PM | 5/7/05 4:00 AM | 4 HOURS | Yes | PRODUCTION | HQ-EXCHPF01 | CORPORATE EMAIL PUBLIC FOLDER CLUSTER | UPGRADE THE LEVEL OF RDAC (MULTI-PATHING SOFTWARE) FROM 8.40.3201 TO 9.10.G2.01 REASON: RDAC LEVEL MUST BE ABOVE VERSION 9 BEFORE THE DISK ARRAY FIRMWARE CAN BE UPGRADED. IT IS ALSO A CURRENCY LEVEL ITEM. | NONE - SINCE THE SERVERS ARE CLUSTERED, THERE WILL ONLY BE A BRIEF MOMENT WHEN MAIL IS NOT ROUTING WHILE SERVICES ARE FAILING OVER FROM THE ACTIVE NODE TO THE PASSIVE NODE, AND BACK AFTER THE INSTALL HAS COMPLETED. | N | 4/26/2 | DWIGHT ALLMON (Y); BARB LARSEN (Y) | WARREN ROSENBLUM (Y) | BACKUPS WILL BE CONFIRMED BEFORE THE UPGRADE BEGINS. IF NECESSARY, THE ORIGINAL DRIVER VERSION WOULD BE REINSTALLED. THE ONLY PROBLEM WITH THAT IS, IT WILL HOLD UP OUR MADATORY DISK ARRAY CODE UPGRADE. IF A FULL SERVER RESTORE IS REQUIRED, 24 HOURS MAY BE NEEDED. NORMAL ESCALATION PROCEUDRES WOULD BE USED IF PROBLEMS SHOULD ARISE. | SEE UPGRADE PLAN AT G:\EDS\HW CURRENCY\RDAC | THE WINDOWS ADMIN WILL USE SYSTEM TOOLS TO REVIEW THE NEW RDAC VERSION. THE INSTALL LOGS WILL ALSO BE REVIEWED. ALL DRIVES, FILE SYSTEMS, AND DISK PATHING WILL BE CHECKED AFTER THE RDAC UPGRADE. EMAIL FUNCTIONALITY WILL BE CHECKED AFTER THE SERVER IS BACK ONLINE. | HW/SW CURRENCY | N/A | DANIEL PECORA / MATT BAROODY | 4/21/05 1:51 PM |
| 21931 | DANIEL PECORA | 5/6/05 8:00 PM | 5/7/05 4:00 AM | 4 HOURS | Yes | PRODUCTION | HQ-EXCHPF04 | CORPORATE EMAIL PUBLIC FOLDER CLUSTER | UPGRADE THE LEVEL OF RDAC (MULTI-PATHING SOFTWARE) FROM 8.41.3007 TO 9.10.G2.01 REASON: RDAC LEVEL MUST BE ABOVE VERSION 9 BEFORE THE DISK ARRAY FIRMWARE CAN BE UPGRADED. IT IS ALSO A CURRENCY LEVEL ITEM. | NONE - SINCE THE SERVERS ARE CLUSTERED, THERE WILL ONLY BE A BRIEF MOMENT WHEN MAIL IS NOT ROUTING WHILE SERVICES ARE FAILING OVER FROM THE ACTIVE NODE TO THE PASSIVE NODE, AND BACK AFTER THE INSTALL HAS COMPLETED. | N | 4/26/2 | DWIGHT ALLMON (Y); BARB LARSEN (Y) | WARREN ROSENBLUM (Y) | BACKUPS WILL BE CONFIRMED BEFORE THE UPGRADE BEGINS. IF NECESSARY, THE ORIGINAL DRIVER VERSION WOULD BE REINSTALLED. THE ONLY PROBLEM WITH THAT IS, IT WILL HOLD UP OUR MADATORY DISK ARRAY CODE UPGRADE. IF A FULL SERVER RESTORE IS REQUIRED, 24 HOURS MAY BE NEEDED. NORMAL ESCALATION PROCEUDRES WOULD BE USED IF PROBLEMS SHOULD ARISE. | SEE UPGRADE PLAN AT G:\EDS\HW CURRENCY\RDAC | THE WINDOWS ADMIN WILL USE SYSTEM TOOLS TO REVIEW THE NEW RDAC VERSION. THE INSTALL LOGS WILL ALSO BE REVIEWED. ALL DRIVES, FILE SYSTEMS, AND DISK PATHING WILL BE CHECKED AFTER THE RDAC UPGRADE. EMAIL FUNCTIONALITY WILL BE CHECKED AFTER THE SERVER IS BACK ONLINE. | HW/SW CURRENCY | N/A | DANIEL PECORA / MATT BAROODY | 4/21/05 1:51 PM |
| 21838 | CYNTHIA FOREMAN | 5/7/05 1:00 AM | 5/7/05 9:00 AM | 8 HOURS | Yes | PRODUCTION | SAN MIGUEL | CLARIFY | REORG CLARIFY TABLES TO IMPROVE PERFORMANCE | CLARIFY WILL BE UNAVAILABLE | N | 4/26/2 | BARB LARSEN (Y) | WILLIAM MALLOT (Y); JUDITH KING (N) | RESTORE FROM COLD BACKUP | REORG CLARIFY TABLES TO IMPROVE PERFORMANCE | FRAGMENTATION WILL BE REDUCED | CYNTHIA FOREMAN | 4/6/05 3:28 PM | ||
| 21752 | KIM CHAMPOUX | 5/7/05 1:00 AM | 5/7/05 1:00 PM | 8 HOURS | Yes | PRODUCTION | LSV-APPS37 | PRIMUS | UPGRADE PRIMUS FROM 5.2 SP1 TO 6.0 | PRIMUS PRODUCTION USERS - TEC | N | 4/5/20 | MELVIN NELSON (N); BARB LARSEN (N) | KIM CHAMPOUX (N) | RE-INSTALL PRIMUS 5.2 SP1 | 1) UNINSTALL PRIMUS 5.2 SP1 2) INSTALL PRIMUS 6.0 | PRIMUS FUNCTIONS WORK PROPERLY | 1032616 | KIM CHAMPOUX | 3/23/05 4:59 PM | |
| 21753 | KIM CHAMPOUX | 5/7/05 1:00 AM | 5/7/05 1:00 PM | 8 HOURS | Yes | PRODUCTION | LSV-APPS40 | PRIMUS | UPGRADE PRIMUS FROM 5.2 SP1 TO 6.0 | PRIMUS PRODUCTION USERS - TEC | N | 4/5/20 | MELVIN NELSON (N); BARB LARSEN (N) | KIM CHAMPOUX (N) | RE-INSTALL PRIMUS 5.2 SP1 | 1) UNINSTALL PRIMUS 5.2 SP1 2) INSTALL PRIMUS 6.0 | PRIMUS FUNCTIONS WORK PROPERLY | 1032616 | KIM CHAMPOUX | 3/23/05 5:01 PM | |
| 21754 | KIM CHAMPOUX | 5/7/05 1:00 AM | 5/7/05 1:00 PM | 8 HOURS | Yes | PRODUCTION | LSV-APPS39 | PRIMUS | UPGRADE PRIMUS FROM 5.2 SP1 TO 6.0 | PRIMUS PRODUCTION USERS - TEC | N | 4/5/20 | MELVIN NELSON (N); BARB LARSEN (N) | KIM CHAMPOUX (N) | RE-INSTALL PRIMUS 5.2 SP1 | 1) UNINSTALL PRIMUS 5.2 SP1 2) INSTALL PRIMUS 6.0 | PRIMUS FUNCTIONS WORK PROPERLY | 1032616 | KIM CHAMPOUX | 3/23/05 5:04 PM | |
| 21755 | KIM CHAMPOUX | 5/7/05 1:00 AM | 5/7/05 1:00 PM | 8 HOURS | Yes | PRODUCTION | LSV-APPS41 | PRIMUS | UPGRADE PRIMUS FROM 5.2 SP1 TO 6.0 | PRIMUS PRODUCTION USERS - TEC | N | 4/5/20 | MELVIN NELSON (N); BARB LARSEN (N) | KIM CHAMPOUX (N) | RE-INSTALL PRIMUS 5.2 SP1 | 1) UNINSTALL PRIMUS 5.2 SP1 2) INSTALL PRIMUS 6.0 | PRIMUS FUNCTIONS WORK PROPERLY | 1032616 | KIM CHAMPOUX | 3/23/05 5:06 PM | |
| 21925 | JUDY JOHNSON | 5/7/05 1:00 AM | 5/9/05 3:00 AM | 48 HOURS | Yes | PRODUCTION | SAP PRODUCTION | SAP | IMPLEMENT ACTUAL COST/MATERIAL LEDGER FUNCTIONALITY INTO SAP. THIS WILL INCLUDE TRANSPORTS FOR CONFIGURATION AND DEVELOPMENT AS WELL AS CONVERSIONS. | INVENTORY CONTROL.SHOP FLOOR CONTROL - PRA & COL WAREHOUSING - PRA & COL MASTER SCHEDULING ORDER MANAGEMENT ACCOUNTS PAYABLE TRAFFIC OPERATIONS - PRA & COL | N | 4/26/2 | KERRY BEARLY (Y) | WARREN ROSENBLUM (Y) | DEACTIVATE THE ACTUAL COST/MATERIAL LEDGER MODULE THROUGH CONFIGURATION. | SAP TRANSPORTS WILL BE MIGRATED TO PRODUCTION RIGHT AFTER APRIL MM PERIOD CLOSE. THREE CONVERSION PROGRAMS WILL THEN EXECUTE. | CONFIGURATION IS IN PRODUCTION AND MATERIALS ARE CONVERTED. | ACTUAL COST/MATERIAL LEDGER | JUDY JOHNSON / JOSEPH WIGGINS | 4/21/05 11:39 AM | |
| 21901 | ROBERT HAYNES | 5/7/05 4:00 AM | 5/7/05 2:00 PM | 10 HOURS | Yes | PRODUCTION | LSV-APPS08, 11 AND 24 | SIEBEL 6.0 PROD | PROMOTION SIEBEL 6.0 QAS REPOSITORY TO SIEBEL 6.0 PROD. | SIEBEL 6.0 PROD WILL BE UNAVAILABLE DUING PROMOTION PROCESS, FOR SIEBEL.SRF REPLACEMENT AND APPLICATION SERVICE CYCLE | N | 4/26/2 | CHRISTINA D'AMICO (Y); ANN BRUINSMA (Y); RAJEEV ANKIREDDYPALLI (Y) | WILLIAM MALLOT (Y) | SIEBEL 6.0 PROD HAS A COLD BACKUP TAKEN EVERY SATURDAY MORNING. RESTORE OF THE DATABASE CAN TAKE FROM 8 TO 10 HOURS. NOTIFY BOB HAYNES IF RESTORE WINDOW IS EXCEEDED. | PROMOTION OF SIEBEL 6.0 QAS REPOSITORY, COMPILATON OF SIEBEL.SRF FILE, CREATION AND DISTRIBUTION OF SIEBEL.SRF KIT, REPLACEMENT OF SIEBEL.SRF WITH NEW COPY AND CYCLE OF APPLICATION SERVICES ON ALL THREE WINDOWS APPLICATION SERVERS | SIEBEL 6.0 QAS FUNCTIONALITY WILL BE AVAILABLE IN PRODUCTION. | RESPOSITORY MIGRATION/PROMOTION | 1083168 | ROBERT HAYNES | 4/19/05 8:50 AM |
| 21909 | ROBERT HAYNES | 5/7/05 4:00 AM | 5/7/05 2:00 PM | 12 HOURS | Yes | PRODUCTION | SAN MIGUEL CLUSTER | SIEBEL 7.5 PRD | PROMOTION/MIGRATION OF SIEBEL 7.5 QAS REPOSITORY TO SIEBEL 7.5 PRD. | SIEBEL 7.5 WILL BE UNAVAILABLE DURING PROMOTION PROCESS AND SERVICE CYCLE | N | 4/26/2 | CHRISTINA D'AMICO (N); TED GUDLEVICH (N); ANN BRUINSMA (Y); MARTIN MILES (Y) | WILLIAM MALLOT (Y) | SIEBEL 7.5 PRD DATABASE HAS A COLD BACKUP TAKEN EVERY SATURDAY MORNING. IT CAN TAKE FROM 8 TO 10 HOURS TO RESTORE. CONTACT BOB HAYNES IF RESTORE WINDOW IS EXCEEDED. | MIGRATION/PROMOTION OF SIEBEL 7.5 QAS REPOSITIORY TO SIEBEL 7.5 PRD, COMPILE REPOSITORY, MOVE TO THE PRODUCTION SERVER, GENERATE GENBSCRIPTS AND CYCLE APPLICATION AND WEB SERVICES. | SIEBEL 7.5 QAS APPLICATION UPDATES WILL BE VISIBLE IN SIEBEL 7.5 PRD. | REPOSITORY MIGRATION/PROMOTION | 1083221 | ROBERT HAYNES | 4/19/05 10:36 AM |
| 21728 | DAN LIVINGSTON | 5/7/05 8:00 AM | 5/7/05 4:00 PM | 5 HOURS | Yes | PRODUCTION | ELBERT | P12 - ACES CANADA | UPGRADE THE P12 DATABASE FROM 8.1.6.3 TO 9.2.0.6. THIS UPGRADE IS PART OF THE WORLDWIDE UPGRADE OF THE ACES ENVIRONMENTS TO ORACLE VERSION 9I | DATABASE WILL BE UNAVAILABLE TO ALL USERS OF ACES CANADA (P12 DATABASE) | N | 4/12/2 | BARB LARSEN (N); SALIM PATEL (N); GURPREET THATHGUR (N) | BALAMURUGAN SANKARANARAYANAN (N) | DATABASE WILL BE RESTORED FROM BACKUP TAKEN IMMEDIATELY PRIOR TO UPPGRADE | 1) BACKUP THE DATABASE 2) CHANGE ORACLE_HOME TO THE 817 ORACLE HOME, 3) UPGRADE DATABASE TO 8174, 4) UPGRADE DATABASE TO 9.2.0.6, 5) PERFORM ALL CHANGEOVER WORK | DATABASE WILL BE AVAILABLE AS ORACLE V 9.2.0.6 | ACES | 1072217 | DAN LIVINGSTON | 3/18/05 11:11 AM |
| 21741 | DANIEL TRUJILLO | 5/9/05 10:00 AM | 5/9/05 1:00 PM | 30 MINS | Yes | PRODUCTION | PITTSFORD, NY WAN ROUTER | QWEST DOMESTIC WAN | FOLLOW-UP PER FAILED CR# 21463. CONVERT THE PITTSFORD, NY OFFICE FROM THE DOMESTIC MCI WAN TO THE DOMESTIC QWEST WAN. | BRIEF LOSS IN WAN CONNECTIVITY WHILE THE LAN CONNECTION ON CISCO SWITCH IS MOVED OVER FROM EXISTING MCI WAN ROUTER TO THE NEW QWEST WAN ROUTER. | N | 3/29/2 | RANDOLPH BLAKESLEE (N) | JAMES WAMSLEY (N) | CUT THE LAN BACK OVER TO THE EXISTING MCI SOLUTION TO MAINTAIN WAN CONNECTIVITY. | NEW QWEST WAN CIRCUIT IS INSTALLED AND READY, NEW ROUTER IS READY. 1- ACTIVATE NEW CIRCUIT WITH QWEST ENGINEERING. 2 - TEST CIRCUIT CONNECTIVITY. 3 - CUT OVER LAN FROM CISCO SWITCH TO THE NEW ROUTER. 4 - TEST CONNECTIVITY | USERS IN OFFICE CAN ACCESS E-MAIL AND OTHER APPLICATIONS HOSTED IN LOUISVILLE OVER THE QWEST WAN. | WAN CONVERSION | DANIEL TRUJILLO / JAMES WAMSLEY | 3/22/05 10:38 AM | |
| 21933 | DANIEL PECORA | 5/9/05 8:00 PM | 5/10/05 4:00 AM | 4 HOURS | Yes | PRODUCTION | NA-EXCH01 | NORTH AMERICA CORPORATE EMAIL CLUSTER | UPGRADE THE LEVEL OF RDAC (MULTI-PATHING SOFTWARE) FROM 8.40.3201 TO 9.10.G2.01 REASON: RDAC LEVEL MUST BE ABOVE VERSION 9 BEFORE THE DISK ARRAY FIRMWARE CAN BE UPGRADED. IT IS ALSO A CURRENCY LEVEL ITEM. | NONE - SINCE THE SERVER IS CLUSTERED, THERE WILL ONLY BE A BRIEF MOMENT WHEN MAIL IS NOT ROUTING WHILE SERVICES ARE FAILING OVER FROM THE ACTIVE NODE TO THE PASSIVE NODE, AND BACK AFTER THE INSTALL HAS COMPLETED. | N | 4/26/2 | DWIGHT ALLMON (Y); JOHN ROSS (Y); BARB LARSEN (Y) | WARREN ROSENBLUM (Y) | BACKUPS WILL BE CONFIRMED BEFORE THE UPGRADE BEGINS. IF NECESSARY, THE ORIGINAL DRIVER VERSION WOULD BE REINSTALLED. THE ONLY PROBLEM WITH THAT IS, IT WILL HOLD UP OUR MADATORY DISK ARRAY CODE UPGRADE. IF A FULL SERVER RESTORE IS REQUIRED, 24 HOURS MAY BE NEEDED. NORMAL ESCALATION PROCEUDRES WOULD BE USED IF PROBLEMS SHOULD ARISE. | SEE UPGRADE PLAN AT G:\EDS\HW CURRENCY\RDAC | THE WINDOWS ADMIN WILL USE SYSTEM TOOLS TO REVIEW THE NEW RDAC VERSION. THE INSTALL LOGS WILL ALSO BE REVIEWED. ALL DRIVES, FILE SYSTEMS, AND DISK PATHING WILL BE CHECKED AFTER THE RDAC UPGRADE. EMAIL FUNCTIONALITY WILL BE CHECKED AFTER THE SERVER IS BACK ONLINE. | HW/SW CURRENCY | N/A | DANIEL PECORA / DWIGHT BUEHLER | 4/21/05 2:15 PM |
| 21934 | DANIEL PECORA | 5/9/05 8:00 PM | 5/10/05 4:00 AM | 4 HOURS | Yes | PRODUCTION | NA-EXCH04 | NORTH AMERICA CORPORATE EMAIL CLUSTER | UPGRADE THE LEVEL OF RDAC (MULTI-PATHING SOFTWARE) FROM 8.40.3201 TO 9.10.G2.01 REASON: RDAC LEVEL MUST BE ABOVE VERSION 9 BEFORE THE DISK ARRAY FIRMWARE CAN BE UPGRADED. IT IS ALSO A CURRENCY LEVEL ITEM. | NONE - SINCE THE SERVER IS CLUSTERED, THERE WILL ONLY BE A BRIEF MOMENT WHEN MAIL IS NOT ROUTING WHILE SERVICES ARE FAILING OVER FROM THE ACTIVE NODE TO THE PASSIVE NODE, AND BACK AFTER THE INSTALL HAS COMPLETED. | N | 4/26/2 | DWIGHT ALLMON (Y); JOHN ROSS (Y); BARB LARSEN (Y) | WARREN ROSENBLUM (Y) | BACKUPS WILL BE CONFIRMED BEFORE THE UPGRADE BEGINS. IF NECESSARY, THE ORIGINAL DRIVER VERSION WOULD BE REINSTALLED. THE ONLY PROBLEM WITH THAT IS, IT WILL HOLD UP OUR MADATORY DISK ARRAY CODE UPGRADE. IF A FULL SERVER RESTORE IS REQUIRED, 24 HOURS MAY BE NEEDED. NORMAL ESCALATION PROCEUDRES WOULD BE USED IF PROBLEMS SHOULD ARISE. | SEE UPGRADE PLAN AT G:\EDS\HW CURRENCY\RDAC | THE WINDOWS ADMIN WILL USE SYSTEM TOOLS TO REVIEW THE NEW RDAC VERSION. THE INSTALL LOGS WILL ALSO BE REVIEWED. ALL DRIVES, FILE SYSTEMS, AND DISK PATHING WILL BE CHECKED AFTER THE RDAC UPGRADE. EMAIL FUNCTIONALITY WILL BE CHECKED AFTER THE SERVER IS BACK ONLINE. | HW/SW CURRENCY | N/A | DANIEL PECORA / DWIGHT BUEHLER | 4/21/05 2:16 PM |
| 21956 | JOHN GRANT | 5/10/05 10:00 AM | 5/10/05 11:00 AM | 1 HOURS | Yes | PRODUCTION | SMS SOFTWARE DISTRIBUTION | SECURITY PATCHES | DISTRIBUTE THE MS05-020 CUMULATIVE SECURITY UPDATE FOR INTERNET EXPLORER VIA SMS TO PROTECT AGAINST MULTIPLE VULNERABILITIES. STORAGETEK GIS SECURITY MANAGEMENT HAS CATEGORIZED THIS PATCH AS CRITICAL (8.3/10) AND DETERMINED THAT THE IMPACT OF AN EXPLOIT TO THE VULNERABILITY FIXED BY THIS PATCH TO BE MEDIUM-HIGH (8/10). THIS JOB WILL RUN DAILY FOR TWO WEEKS AFTER WHICH IT WILL CONTINUE TO RUN AS A WEEKLY DISTRIBUTION. | LOW IMPACT - THE INSTALL WILL BE RUN IN THE BACKGROUND AND THE REBOOT WILL BE SUPRESSED IN ORDER TO MINIMIZE CUSTOMER IMPACT. THE SIZE OF THIS PATCH FOR EACH VERSION OF INTERNET EXPLORER IS AS FOLLOWS: INTERNET EXPLORER 5.01 SP3 AND SP4 - 2.66MB, INTERNET EXPLORER 6 SP1 - 4.01MB. THIS PATCH WILL BE CONFIGURED TO AVOID SLOW CONNECTION SPEEDS DUE TO THE FACT THAT IT IS SO LARGE. | N | 4/26/2 | KATHY SCHUBERT (N) | BRIAN LANGE (N) | EXPIRE AND DISABLE THE ADVERTISEMENTS. | CREATE SEPARATE ADVERTISEMENTS USING THE DISTRIBUTE SOFTWARE UPDATES WIZARD AND ADVERTISE THEM TO THEIR RESPECTIVE COLLECTIONS. | WILL MONITOR THE NUMBERS OF MACHINES REQUIRING THE UPDATE AS WELL AS MACHINES THAT HAVE INSTALLED THE UPDATE. STATUS WILL BE REPORTED TO THE SECURITY TEAM ON A WEEKLY BASIS. | JOHN GRANT | 4/25/05 10:24 AM | ||
| 21962 | BRENT VAN SICKLE | 5/10/05 10:00 AM | 5/10/05 3:00 PM | 3 HOURS | Yes | PRODUCTION | ELBERT | SFA1ARD (SIEBEL 6.0 ARCHIVE DATABASE) | RAY LAFRANCE IS REQUESTING THAT THE SFA1ARD(SIEBEL 6.0 ARCHIVE) DATABASE BE BUILT ON BLADESTORE. | ACCESS TO THE DATABASE WILL BE UNAVILABLE DURING THE MOVE. | N | 4/26/2 | WARREN ROSENBLUM (Y) | JUDITH KING (N) | RESTORE THE COLD BACKUP TAKEN PRIOR TO STARTING. | 1. A COLD BACKUP OF THE DATABASE WILL BE TAKE PRIOR TO THE MOVE. 2. A NEW CONTROL CREATE SCRIPT WILL BE GENERATED. 3. THE DATABASE FILES WILL BE MOVED TO THE BLADESTORE. 4. THE CONTROL FILE SCRIPT WILL BE MODIFIED WITH THE NEW LOCATION OF THE DATABASE FILES. 5. THE CONTROL FILE SCRIPT WILL BE RUN. 6. TAKE A COLD BACKUP WHEN FINISHED. | THE CREATE CONTROL FILE SCRIPT RUNS WITHOUT ERRORS AND I CAN CONNECT TO THE SFA1ARD DATABASE REMOTELY. | BRENT VAN SICKLE | 4/25/05 2:36 PM | ||
| 21957 | JOHN GRANT | 5/10/05 11:00 AM | 5/10/05 12:00 PM | 1 HOURS | Yes | PRODUCTION | SMS SOFTWARE DISTRIBUTION | SECURITY PATCHES | DISTRIBUTE THE MS05-019 PATCH FOR MICROSOFT WINDOWS OPERATING SYSTEMS VIA SMS TO PROTECT AGAINST VULNERABILITIES IN TCP/IP WHICH COULD ALLOW REMOTE CODE EXECUTION AND DENIAL OF SERVICE. STORAGETEK GIS SECURITY MANAGEMENT HAS CATEGORIZED THIS PATCH AS CRITICAL (10/10) AND DETERMINED THAT THE IMPACT OF AN EXPLOIT TO THE VULNERABILITY FIXED BY THIS PATCH TO BE HIGH (10/10). THIS JOB WILL RUN DAILY FOR TWO WEEKS AFTER WHICH IT WILL CONTINUE TO RUN AS A WEEKLY DISTRIBUTION. | LOW IMPACT - THE INSTALL WILL BE RUN IN THE BACKGROUND AND THE REBOOT WILL BE SUPRESSED IN ORDER TO MINIMIZE CUSTOMER IMPACT. THE SIZE OF THIS PATCH FOR EACH OS IS AS FOLLOWS: WINDOWS XP - 769KB, WINDOWS 2000 - 753KB. | N | 4/26/2 | KATHY SCHUBERT (N) | BRIAN LANGE (N) | EXPIRE AND DISABLE THE ADVERTISEMENTS. | CREATE SEPARATE ADVERTISEMENTS USING THE DISTRIBUTE SOFTWARE UPDATES WIZARD AND ADVERTISE THEM TO THEIR RESPECTIVE COLLECTIONS. | WILL MONITOR THE NUMBERS OF MACHINES REQUIRING THE UPDATE AS WELL AS MACHINES THAT HAVE INSTALLED THE UPDATE. STATUS WILL BE REPORTED TO THE SECURITY TEAM ON A WEEKLY BASIS. | JOHN GRANT | 4/25/05 10:40 AM | ||
| 21958 | JOHN GRANT | 5/10/05 12:00 PM | 5/10/05 1:00 PM | 1 HOURS | Yes | PRODUCTION | SMS SOFTWARE DISTRIBUTION | SECURITY PATCHES | DISTRIBUTE THE MS05-022 PATCH FOR MSN MESSENGER VIA SMS TO PROTECT AGAINST A VULNERABILITY IN MSN MESSENGER WHICH COULD LEAD TO REMOTE CODE EXECUTION. STORAGETEK GIS SECURITY MANAGEMENT HAS CATEGORIZED THIS PATCH AS CRITICAL (10/10) AND DETERMINED THAT THE IMPACT OF AN EXPLOIT TO THE VULNERABILITY FIXED BY THIS PATCH TO BE HIGH (10/10). THIS JOB WILL RUN DAILY FOR TWO WEEKS AFTER WHICH IT WILL CONTINUE TO RUN WEEKLY. | LOW IMPACT - THE INSTALL WILL BE RUN IN THE BACKGROUND AND THE REBOOT WILL BE SUPRESSED IN ORDER TO MINIMIZE CUSTOMER IMPACT. THE SIZE OF THIS PATCH IS AS FOLLOWS: MSN MESSENGER 6.2 - 5.12MB - 40.91MB. THIS PATCH WILL BE CONFIGURED TO AVOID SLOW CONNECTION SPEEDS DUE TO THE FACT THAT IT IS SO LARGE. | N | 4/26/2 | KATHY SCHUBERT (N) | BRIAN LANGE (N) | EXPIRE AND DISABLE THE ADVERTISEMENTS. | CREATE SEPARATE ADVERTISEMENTS USING THE DISTRIBUTE SOFTWARE UPDATES WIZARD AND ADVERTISE THEM TO THEIR RESPECTIVE COLLECTIONS. | WILL MONITOR THE NUMBERS OF MACHINES REQUIRING THE UPDATE AS WELL AS MACHINES THAT HAVE INSTALLED THE UPDATE. STATUS WILL BE REPORTED TO THE SECURITY TEAM ON A WEEKLY BASIS. | JOHN GRANT | 4/25/05 10:50 AM | ||
| 21959 | JOHN GRANT | 5/10/05 1:00 PM | 5/10/05 2:00 PM | 1 HOURS | Yes | PRODUCTION | SMS SOFTWARE DISTRIBUTION | SECURITY PATCHES | DISTRIBUTE THE MS05-017 PATCH FOR MICROSOFT WINDOWS OPERATING SYSTEMS VIA SMS TO PROTECT AGAINST A VULNERABILITY IN MESSAGE QUEUING WHICH COULD ALLOW REMOTE CODE EXECUTION. STORAGETEK GIS SECURITY MANAGEMENT HAS CATEGORIZED THIS PATCH AS IMPORTANT (10/10) AND DETERMINED THAT THE IMPACT OF AN EXPLOIT TO THE VULNERABILITY FIXED BY THIS PATCH TO BE HIGH (10/10). THIS JOB WILL RUN DAILY FOR TWO WEEKS AFTER WHICH IT WILL CONTINUE TO RUN AS A WEEKLY DISTRIBUTION. | LOW IMPACT - THE INSTALL WILL BE RUN IN THE BACKGROUND AND THE REBOOT WILL BE SUPRESSED IN ORDER TO MINIMIZE CUSTOMER IMPACT. THE SIZE OF THIS PATCH FOR EACH OS IS AS FOLLOWS: WINDOWS XP - 967KB, WINDOWS 2000 - 1.23MB. | N | 4/26/2 | KATHY SCHUBERT (N) | BRIAN LANGE (N) | EXPIRE AND DISABLE THE ADVERTISEMENTS. | CREATE SEPARATE ADVERTISEMENTS USING THE DISTRIBUTE SOFTWARE UPDATES WIZARD AND ADVERTISE THEM TO THEIR RESPECTIVE COLLECTIONS. | WILL MONITOR THE NUMBERS OF MACHINES REQUIRING THE UPDATE AS WELL AS MACHINES THAT HAVE INSTALLED THE UPDATE. STATUS WILL BE REPORTED TO THE SECURITY TEAM ON A WEEKLY BASIS. | JOHN GRANT | 4/25/05 11:14 AM | ||
| 21973 | MICHAEL GRANGER | 5/10/05 1:00 PM | 5/10/05 3:00 PM | 30 MINS | Yes | PRODUCTION | NA | NA | MAKE CHANGES ON THE ROUTING BETWEEN THE RMS-SOC IN SOUTHBOROUGH AND THE STORAGETEK NETWORK SO THAT WE HAVE PERMANENT CONNECTIVITY BETWEEN THE TWO ENVIRONMENTS WITHOUT THE NEED FOR VPN, SPECIFICALLY FOR THE SOC STAFF THAT NEED TO COME INTO STK TO SUPPORT THE GLOBAL SERVICES SDP APPLICATIONS. | POSSIBLE IMPACT IN CONNECTIVITY BETWEEN RMS AND STK, INCLUDING THE CURRENT VPN | N | DAVID TOMCZAK (Y) | JAMES BOEHMLER (Y) | CHECKPOINT FW, RMS CONCENTRATOR, AND WAN ROUTER CONFIGS WILL BE BACKED UP PRIOR TO THE CHANGES. IF BACKOUT NEEDED, THAT COULD TAKE UP TO AN HOUR TOTAL. | THE SUBNET USED BY THE SOC SUPPORT STAFF WILL BE ROUTED OVER TO THE STK SIDE, VIA THE RMS VPN CONCENTRATOR AND THE SOUTHBOROUGH STK WAN ROUTER, TO LOUISVILLE. MATT GINN OF GLOBAL SERVICES WILL CONFIGURE THE RMS CHECKPOINT FIREWALL TO SPECIFY THE ACCESS RULES THAT WILL GOVERN THE STK RESOURCES THEY CAN ACCESS, AND THE EQUIVALENT WILL BE DONE BY EDS NETWORK USING AN ACCESS-LIST ON THE SOUTHBOROUGH WAN ROUTER. | TESTING BY SOC STAFF. WILL VERYIFY OTHER PARTS OF THE SOUTHBOROUGH MULTI-FACETED ENVIRONMENT AREN'T AFFECTED BY THIS CHANGE. | MICHAEL GRANGER | 4/26/05 2:10 PM | |||
| 21960 | JOHN GRANT | 5/10/05 2:00 PM | 5/10/05 3:00 PM | 1 HOURS | Yes | PRODUCTION | SMS SOFTWARE DISTRIBUTION | SECURITY PATCHES | DISTRIBUTE THE MS05-016 PATCH FOR MICROSOFT WINDOWS OPERATING SYSTEMS VIA SMS TO PROTECT AGAINST A VULNERABILITY IN WINDOWS SHELL WHICH COULD ALLOW REMOTE CODE EXECUTION. STORAGETEK GIS SECURITY MANAGEMENT HAS CATEGORIZED THIS PATCH AS IMPORTANT (8.3/10) AND DETERMINED THAT THE IMPACT OF AN EXPLOIT TO THE VULNERABILITY FIXED BY THIS PATCH TO BE MEDIUM-HIGH (8/10). THIS JOB WILL RUN DAILY FOR TWO WEEKS AFTER WHICH IT WILL CONTINUE TO RUN AS A WEEKLY DISTRIBUTION. | LOW IMPACT - THE INSTALL WILL BE RUN IN THE BACKGROUND AND THE REBOOT WILL BE SUPRESSED IN ORDER TO MINIMIZE CUSTOMER IMPACT. THE SIZE OF THIS PATCH FOR EACH OS IS AS FOLLOWS: WINDOWS XP - 4.49MB, WINDOWS 2000 - 1.76MB. THE WINDOWS XP VERSION OF THIS PATCH WILL BE CONFIGURED TO AVOID SLOW CONNECTION SPEEDS DUE TO THE FACT THAT IT IS SO LARGE. | N | 4/26/2 | KATHY SCHUBERT (N) | BRIAN LANGE (N) | EXPIRE AND DISABLE THE ADVERTISEMENTS. | CREATE SEPARATE ADVERTISEMENTS USING THE DISTRIBUTE SOFTWARE UPDATES WIZARD AND ADVERTISE THEM TO THEIR RESPECTIVE COLLECTIONS. | WILL MONITOR THE NUMBERS OF MACHINES REQUIRING THE UPDATE AS WELL AS MACHINES THAT HAVE INSTALLED THE UPDATE. STATUS WILL BE REPORTED TO THE SECURITY TEAM ON A WEEKLY BASIS. | JOHN GRANT | 4/25/05 11:20 AM | ||
| 21961 | JOHN GRANT | 5/10/05 3:00 PM | 5/10/05 4:00 PM | 1 HOURS | Yes | PRODUCTION | SMS SOFTWARE DISTRIBUTION | SECURITY PATCHES | DISTRIBUTE THE MS05-018 PATCH FOR MICROSOFT WINDOWS OPERATING SYSTEMS VIA SMS TO PROTECT AGAINST VULNERABILITIES IN WINDOWS KERNEL WHICH COULD ALLOW ELEVATION OF PRIVILEGE AND DENIAL OF SERVICE. STORAGETEK GIS SECURITY MANAGEMENT HAS CATEGORIZED THIS PATCH AS IMPORTANT (7.5/10) AND DETERMINED THAT THE IMPACT OF AN EXPLOIT TO THE VULNERABILITY FIXED BY THIS PATCH TO BE HIGH (10/10). THIS JOB WILL RUN DAILY FOR TWO WEEKS AFTER WHICH IT WILL CONTINUE TO RUN AS A WEEKLY DISTRIBUTION. | LOW IMPACT - THE INSTALL WILL BE RUN IN THE BACKGROUND AND THE REBOOT WILL BE SUPRESSED IN ORDER TO MINIMIZE CUSTOMER IMPACT. THE SIZE OF THIS PATCH FOR EACH OS IS AS FOLLOWS: WINDOWS XP - 5.96MB, WINDOWS 2000 - 5.56MB. THIS PATCH WILL BE CONFIGURED TO AVOID SLOW CONNECTION SPEEDS DUE TO THE FACT THAT IT IS SO LARGE. | N | 4/26/2 | KATHY SCHUBERT (N) | BRIAN LANGE (N) | EXPIRE AND DISABLE THE ADVERTISEMENTS. | CREATE SEPARATE ADVERTISEMENTS USING THE DISTRIBUTE SOFTWARE UPDATES WIZARD AND ADVERTISE THEM TO THEIR RESPECTIVE COLLECTIONS. | WILL MONITOR THE NUMBERS OF MACHINES REQUIRING THE UPDATE AS WELL AS MACHINES THAT HAVE INSTALLED THE UPDATE. STATUS WILL BE REPORTED TO THE SECURITY TEAM ON A WEEKLY BASIS. | JOHN GRANT | 4/25/05 11:25 AM | ||
| 21935 | DANIEL PECORA | 5/10/05 8:00 PM | 5/11/05 4:00 AM | 4 HOURS | Yes | PRODUCTION | NA-EXCH02 | NORTH AMERICA CORPORATE EMAIL CLUSTER | UPGRADE THE LEVEL OF RDAC (MULTI-PATHING SOFTWARE) FROM 8.40.3201 TO 9.10.G2.01 REASON: RDAC LEVEL MUST BE ABOVE VERSION 9 BEFORE THE DISK ARRAY FIRMWARE CAN BE UPGRADED. IT IS ALSO A CURRENCY LEVEL ITEM. | NONE - SINCE THE SERVER IS CLUSTERED, THERE WILL ONLY BE A BRIEF MOMENT WHEN MAIL IS NOT ROUTING WHILE SERVICES ARE FAILING OVER FROM THE ACTIVE NODE TO THE PASSIVE NODE, AND BACK AFTER THE INSTALL HAS COMPLETED. | N | 4/26/2 | DWIGHT ALLMON (Y); JOHN ROSS (Y); BARB LARSEN (Y) | WARREN ROSENBLUM (Y) | BACKUPS WILL BE CONFIRMED BEFORE THE UPGRADE BEGINS. IF NECESSARY, THE ORIGINAL DRIVER VERSION WOULD BE REINSTALLED. THE ONLY PROBLEM WITH THAT IS, IT WILL HOLD UP OUR MADATORY DISK ARRAY CODE UPGRADE. IF A FULL SERVER RESTORE IS REQUIRED, 24 HOURS MAY BE NEEDED. NORMAL ESCALATION PROCEUDRES WOULD BE USED IF PROBLEMS SHOULD ARISE. | SEE UPGRADE PLAN AT G:\EDS\HW CURRENCY\RDAC | THE WINDOWS ADMIN WILL USE SYSTEM TOOLS TO REVIEW THE NEW RDAC VERSION. THE INSTALL LOGS WILL ALSO BE REVIEWED. ALL DRIVES, FILE SYSTEMS, AND DISK PATHING WILL BE CHECKED AFTER THE RDAC UPGRADE. EMAIL FUNCTIONALITY WILL BE CHECKED AFTER THE SERVER IS BACK ONLINE. | HW/SW CURRENCY | N/A | DANIEL PECORA / DWIGHT BUEHLER | 4/21/05 2:22 PM |
| 21936 | DANIEL PECORA | 5/10/05 8:00 PM | 5/11/05 4:00 AM | 4 HOURS | Yes | PRODUCTION | NA-EXCH05 | NORTH AMERICA CORPORATE EMAIL CLUSTER | UPGRADE THE LEVEL OF RDAC (MULTI-PATHING SOFTWARE) FROM 8.40.3201 TO 9.10.G2.01 REASON: RDAC LEVEL MUST BE ABOVE VERSION 9 BEFORE THE DISK ARRAY FIRMWARE CAN BE UPGRADED. IT IS ALSO A CURRENCY LEVEL ITEM. | NONE - SINCE THE SERVER IS CLUSTERED, THERE WILL ONLY BE A BRIEF MOMENT WHEN MAIL IS NOT ROUTING WHILE SERVICES ARE FAILING OVER FROM THE ACTIVE NODE TO THE PASSIVE NODE, AND BACK AFTER THE INSTALL HAS COMPLETED. | N | 4/26/2 | DWIGHT ALLMON (Y); JOHN ROSS (Y); BARB LARSEN (Y) | WARREN ROSENBLUM (Y) | BACKUPS WILL BE CONFIRMED BEFORE THE UPGRADE BEGINS. IF NECESSARY, THE ORIGINAL DRIVER VERSION WOULD BE REINSTALLED. THE ONLY PROBLEM WITH THAT IS, IT WILL HOLD UP OUR MADATORY DISK ARRAY CODE UPGRADE. IF A FULL SERVER RESTORE IS REQUIRED, 24 HOURS MAY BE NEEDED. NORMAL ESCALATION PROCEUDRES WOULD BE USED IF PROBLEMS SHOULD ARISE. | SEE UPGRADE PLAN AT G:\EDS\HW CURRENCY\RDAC | THE WINDOWS ADMIN WILL USE SYSTEM TOOLS TO REVIEW THE NEW RDAC VERSION. THE INSTALL LOGS WILL ALSO BE REVIEWED. ALL DRIVES, FILE SYSTEMS, AND DISK PATHING WILL BE CHECKED AFTER THE RDAC UPGRADE. EMAIL FUNCTIONALITY WILL BE CHECKED AFTER THE SERVER IS BACK ONLINE. | HW/SW CURRENCY | N/A | DANIEL PECORA / DWIGHT BUEHLER | 4/21/05 2:22 PM |
| 21612 | DANIEL TRUJILLO | 5/11/05 9:00 AM | 5/11/05 1:00 PM | 120 MINS | Yes | PRODUCTION | CSI -BELTSVILLE, MD WAN ROUTER | QWEST DOMESTIC WAN | CONVERT THE CSI -BELTSVILLE, MD OFFICE TO THE QWEST DOMESTIC WAN FROM THE MCI DOMESTIC WAN | WIDE AREA NETWORK CONNECTIVITY WILL BE LOST FOR 5-10 MINUTES WHILE THE LOCAL AREA NETWORK IS CUTOVER FROM EXISTING MCI WAN & ROUTER TO NEW QWEST WAN & NEW ROUTER. NEW ROUTER AND CIRCUIT WILL BE INSTALLED AND TESTED PRIOR TO THE CUTOVER IN ORDER TO MINIMIZE DISRUPTION. ACTUAL CUTOVER TIME IS SCHEDULED FOR 12:00 PM EST | N | 4/12/2 | DWIGHT ALLMON (N) | JAMES WAMSLEY (N) | RE-CONNECT EXISTING ROUTER AND MCI WAN LINK, CUT LAN BACK OVER TO EXISTING ROUTER FROM THE NEW ONE. | 1 - INSTALL THE NEW ROUTER INTO THE EQUIPMENT RACK 2 - PLUG INTO UPS AND POWER UP 3 - DISCONNECT THE EXTERNAL MODEM FROM THE EXISTING ROUTER AND CONNECT IT TO THE NEW ROUTER AND TEST CONNECTIVITY. 4 - ACTIVATE THE NEW WAN CIRCUIT WITH QWEST, TEST FROM LOUISVILLE. 5 - DISCONNECT THE ETHERNET CABLE CONNECTING THE EXISTING ROUTER TO THE CISCO LAN SWITCH FROM EXISTING ROUTER AND PLUG IT INTO THE NEW ROUTER, CONNECT NEW ROUTER TO NEW WAN CIRCUIT. 6 - TEST NEW CONNECTION IN OFFICE AND REMOTELY VIA HQ | VERIFY CONSOLE CONNECTIVITY TO NEW ROUTER & OFFICE LAN VIA THE QWEST DOMESTIC WAN. QWEST ENGINEERING CONFIRMATION OF CONNECTIVITY AT THE TIME OF THE CUTOVER. VALIDATION BY LOCAL OFFICE STAFF. | WAN CONVERSION | N/A | DANIEL TRUJILLO / JAMES WAMSLEY | 2/24/05 5:07 PM |
| 21579 | DANIEL TRUJILLO | 5/11/05 12:00 PM | 5/11/05 4:00 PM | 120 MINS | Yes | PRODUCTION | PHOENIX, AZ WAN ROUTER | QWEST DOMESTIC WAN | CONVERT THE PHOENIX, AZ OFFICE TO THE QWEST DOMESTIC WAN FROM THE MCI DOMESTIC WAN | WIDE AREA NETWORK CONNECTIVITY WILL BE LOST FOR 5 MINUTES WHILE THE LOCAL AREA NETWORK IS CUTOVER FROM EXISTING MCI WAN & ROUTER TO NEW QWEST WAN & NEW ROUTER. NEW ROUTER AND CIRCUIT WILL BE INSTALLED AND TESTED PRIOR TO THE CUTOVER IN ORDER TO MINIMIZE DISRUPTION. ACTUAL CUTOVER TIME IS SCHEDULED FOR 12:00 PST | N | 3/22/2 | ROBERT WILLEFORD (N) | JAMES WAMSLEY (N) | RE-CONNECT EXISTING ROUTER AND MCI WAN LINK, CUT LAN BACK OVER TO EXISTING ROUTER FROM THE NEW ONE. | 1 - INSTALL THE NEW ROUTER INTO THE EQUIPMENT RACK 2 - PLUG INTO UPS AND POWER UP 3 - DISCONNECT THE EXTERNAL MODEM FROM THE EXISTING ROUTER AND CONNECT IT TO THE NEW ROUTER AND TEST CONNECTIVITY. 4 - ACTIVATE THE NEW WAN CIRCUIT WITH QWEST, TEST FROM LOUISVILLE. 5 - DISCONNECT THE ETHERNET CABLE CONNECTING THE EXISTING ROUTER TO THE CISCO LAN SWITCH FROM EXISTING ROUTER AND PLUG IT INTO THE NEW ROUTER, CONNECT NEW ROUTER TO NEW WAN CIRCUIT. 6 - TEST NEW CONNECTION IN OFFICE AND REMOTELY VIA HQ | VERIFY CONSOLE CONNECTIVITY TO NEW ROUTER & OFFICE LAN VIA THE QWEST DOMESTIC WAN. QWEST ENGINEERING CONFIRMATION OF CONNECTIVITY AT THE TIME OF THE CUTOVER. VALIDATION BY LOCAL OFFICE STAFF. | WAN CONVERSION | N/A | DANIEL TRUJILLO / JAMES WAMSLEY | 2/24/05 2:36 PM |
| 21979 | DANIEL TRUJILLO | 5/11/05 12:00 PM | 5/11/05 4:00 PM | 30 MINS | Yes | PRODUCTION | FULLERTON, CA WAN ROUTER | QWEST DOMESTIC WAN | RE-SCHEDULE OF FAILED CR 21890, WIRING ISSUES CORRECTED. CONVERT THE FULLERTON, CA OFFICE TO THE QWEST DOMESTIC WAN FROM THE MCI DOMESTIC WAN | WIDE AREA NETWORK CONNECTIVITY WILL BE LOST FOR 5 MINUTES WHILE THE LOCAL AREA NETWORK IS CUTOVER FROM EXISTING MCI WAN & ROUTER TO NEW QWEST WAN & NEW ROUTER. NEW ROUTER AND CIRCUIT WILL BE INSTALLED AND TESTED PRIOR TO THE CUTOVER IN ORDER TO MINIMIZE DISRUPTION. ACTUAL CUTOVER TIME IS SCHEDULED FOR 12:00 PDT | N | PATRICK POWERS (N) | JAMES WAMSLEY (N) | RE-CONNECT EXISTING ROUTER AND MCI WAN LINK, CUT LAN BACK OVER TO EXISTING ROUTER FROM THE NEW ONE. | NEW WAN ROUTER HAS ALREADY BEEN RACKED IN THE OFFICE. NEW QWEST WAN CIRCUIT WILL BE ACTIVATED AND TESTED THROUGH TO THE NEW ROUTER. ONCE TESTING HAS BEEN COMPLETED, ONSITE TECHNICIAN WILL SWIGN LAN CONNECTION TO CISCO SWITCH OVER FROM OLD WAN ROUTER TO NEW WAN ROUTER. CONDUCT CONNECTIVITY TESTING OVER THE QWEST WAN. | VERIFY CONSOLE CONNECTIVITY TO NEW ROUTER & OFFICE LAN VIA THE QWEST DOMESTIC WAN. QWEST ENGINEERING CONFIRMATION OF CONNECTIVITY AT THE TIME OF THE CUTOVER. VALIDATION BY LOCAL OFFICE STAFF. | WAN CONVERSION | N/A | DANIEL TRUJILLO / JAMES WAMSLEY | 4/27/05 2:53 PM | |
| 21937 | DANIEL PECORA | 5/11/05 8:00 PM | 5/12/05 4:00 AM | 4 HOURS | Yes | PRODUCTION | HQ-EXCH01 | CORPORATE EMAIL CLUSTER | UPGRADE THE LEVEL OF RDAC (MULTI-PATHING SOFTWARE) FROM 8.40.3201 TO 9.10.G2.01 REASON: RDAC LEVEL MUST BE ABOVE VERSION 9 BEFORE THE DISK ARRAY FIRMWARE CAN BE UPGRADED. IT IS ALSO A CURRENCY LEVEL ITEM. | NONE - SINCE THE SERVER IS CLUSTERED, THERE WILL ONLY BE A BRIEF MOMENT WHEN MAIL IS NOT ROUTING WHILE SERVICES ARE FAILING OVER FROM THE ACTIVE NODE TO THE PASSIVE NODE, AND BACK AFTER THE INSTALL HAS COMPLETED. | N | 4/26/2 | DWIGHT ALLMON (Y); BARB LARSEN (Y) | WARREN ROSENBLUM (Y) | BACKUPS WILL BE CONFIRMED BEFORE THE UPGRADE BEGINS. IF NECESSARY, THE ORIGINAL DRIVER VERSION WOULD BE REINSTALLED. THE ONLY PROBLEM WITH THAT IS, IT WILL HOLD UP OUR MADATORY DISK ARRAY CODE UPGRADE. IF A FULL SERVER RESTORE IS REQUIRED, 24 HOURS MAY BE NEEDED. NORMAL ESCALATION PROCEUDRES WOULD BE USED IF PROBLEMS SHOULD ARISE. | SEE UPGRADE PLAN AT G:\EDS\HW CURRENCY\RDAC | THE WINDOWS ADMIN WILL USE SYSTEM TOOLS TO REVIEW THE NEW RDAC VERSION. THE INSTALL LOGS WILL ALSO BE REVIEWED. ALL DRIVES, FILE SYSTEMS, AND DISK PATHING WILL BE CHECKED AFTER THE RDAC UPGRADE. EMAIL FUNCTIONALITY WILL BE CHECKED AFTER THE SERVER IS BACK ONLINE. | HW/SW CURRENCY | N/A | DANIEL PECORA / MATT BAROODY | 4/21/05 2:34 PM |
| 21938 | DANIEL PECORA | 5/11/05 8:00 PM | 5/12/05 4:00 AM | 4 HOURS | Yes | PRODUCTION | HQ-EXCH04 | CORPORATE EMAIL CLUSTER | UPGRADE THE LEVEL OF RDAC (MULTI-PATHING SOFTWARE) FROM 8.40.3201 TO 9.10.G2.01 REASON: RDAC LEVEL MUST BE ABOVE VERSION 9 BEFORE THE DISK ARRAY FIRMWARE CAN BE UPGRADED. IT IS ALSO A CURRENCY LEVEL ITEM. | NONE - SINCE THE SERVER IS CLUSTERED, THERE WILL ONLY BE A BRIEF MOMENT WHEN MAIL IS NOT ROUTING WHILE SERVICES ARE FAILING OVER FROM THE ACTIVE NODE TO THE PASSIVE NODE, AND BACK AFTER THE INSTALL HAS COMPLETED. | N | 4/26/2 | DWIGHT ALLMON (Y); BARB LARSEN (Y) | WARREN ROSENBLUM (Y) | BACKUPS WILL BE CONFIRMED BEFORE THE UPGRADE BEGINS. IF NECESSARY, THE ORIGINAL DRIVER VERSION WOULD BE REINSTALLED. THE ONLY PROBLEM WITH THAT IS, IT WILL HOLD UP OUR MADATORY DISK ARRAY CODE UPGRADE. IF A FULL SERVER RESTORE IS REQUIRED, 24 HOURS MAY BE NEEDED. NORMAL ESCALATION PROCEUDRES WOULD BE USED IF PROBLEMS SHOULD ARISE. | SEE UPGRADE PLAN AT G:\EDS\HW CURRENCY\RDAC | THE WINDOWS ADMIN WILL USE SYSTEM TOOLS TO REVIEW THE NEW RDAC VERSION. THE INSTALL LOGS WILL ALSO BE REVIEWED. ALL DRIVES, FILE SYSTEMS, AND DISK PATHING WILL BE CHECKED AFTER THE RDAC UPGRADE. EMAIL FUNCTIONALITY WILL BE CHECKED AFTER THE SERVER IS BACK ONLINE. | HW/SW CURRENCY | N/A | DANIEL PECORA / MATT BAROODY | 4/21/05 2:34 PM |
| 21970 | BRAD BALLARD | 5/12/05 8:00 AM | 5/12/05 12:00 PM | 4 HOURS | Yes | PRODUCTION | FARWELL, KATAKA, ELBERT | CIF DATA WAREHOUSE | WEEKLY PROMOTION OF CIF CODE, DATABASE AND SCHEDULING CHANGES, AND DATA MAINTENANCE | NO SERVER OR DATABASE OUTAGE, AGREEMENT WITH AFFECTED USERS WILL BE NEGOTIATED PRIOR TO WINDOW. | N | CHERYL LANDWEHR (N); CARLA LEET (N) | SUE TORRERO (N) | DEFINED AND APPROVED BEFORE WINDOW | DEFINED AND APPROVED BEFORE WINDOW | DEFINED AND APPROVED BEFORE WINDOW | CIF SUPPORT | BRAD BALLARD / JABAKUMAR ISAAC | 4/26/05 10:34 AM | ||
| 21926 | STEPHEN PARKER | 5/12/05 11:00 AM | 5/12/05 12:00 PM | 1 HOURS | Yes | PRODUCTION | TBD | TBD | WORK ORDER - TBD DOCUMENTATION ON WO AVAILABLE AT LSV-DFS01/BET/PROJECTS/6-WORK ORDERS/E-BUSINESS/XXXXXX | NO REBOOT OR IIS RESTART REQUIRED. | N | 4/26/2 | BARBARA RUCKER (N) | SARAH KENNEDY (N) | THE ONE OLD ASP HAS BEEN COPIED TO A SAVE CODE LOCATION. IF THE MOVE FAILS, THE OLD ASP WILL BE RESTORED. | APS'S WILL BE MOVED FROM THE DEVELOPMENT ENVIROMENT (XXXXX) TO THE PRODUCTION ENVIROMENT (XXXXXX) | ASP DATES IN PRODUCTION WILL MATCH THOSE IN DEVELOPMENT. UPON MOVEMENT, THE PRODUCTION SYSTEM WILL IMMEDIATELY BE TESTED FOR FUNCTIONALITY BY THE DEVELOPER AND CUSTOMER. | WORK ORDER | TBD | STEPHEN PARKER | 4/21/05 1:17 PM |
| 21629 | DANIEL TRUJILLO | 5/12/05 4:00 PM | 5/12/05 8:00 PM | 120 MINS | Yes | PRODUCTION | SOUTHBOROUGH, MA WAN ROUTER | QWEST DOMESTIC WAN | CONVERT THE SOUTHBOROUGH, MA OFFICE TO THE QWEST DOMESTIC WAN FROM THE MCI DOMESTIC WAN | WIDE AREA NETWORK CONNECTIVITY WILL BE LOST FOR 30-45 MINUTES WHILE EXISTING CISCO ROUTER IS RECONFIGURED FOR THE QWEST IQ NETWORK (WE ARE NOT REPLACING AN EXISTING ROUTER AT THIS SITE) | N | 4/19/2 | DWIGHT ALLMON (N) | JAMES WAMSLEY (N) | RE-CONFIGURE THE CISCO ROUTER TO THE MCI WAN CONFIGURATION. RE-CONNECT EXISTING MCI WAN LINK, TEST CONNECTIVITY VIA MCI WAN CONSOLE. | 1 - TAKE ROUTER OFFLINE. 2 - RECONFIGURE THE ROUTER FOR THE NEW ROUTING PROTOCOL (BORDER GATEWAY PROTOCOL) ON THE QWEST IQ WAN. 3 - TURN UP THE NEW QWEST CIRCUIT AND TEST FOR CONNECTIVITY | VERIFY CONSOLE CONNECTIVITY TO NEW ROUTER & OFFICE LAN VIA THE QWEST DOMESTIC WAN. QWEST ENGINEERING CONFIRMATION OF CONNECTIVITY AT THE TIME OF THE CUTOVER. VALIDATION BY LOCAL OFFICE STAFF. | WAN CONVERSION | N/A | DANIEL TRUJILLO / JAMES WAMSLEY | 2/25/05 4:27 PM |
| 21852 | KIMBALL COOK | 5/12/05 5:00 PM | 5/12/05 6:30 PM | 2 HOURS | Yes | PRODUCTION | HQSQLPRD03 | GSM | BUILD A 2 DBS ON HQSQLPRD03 FOR THE RSM PROJECT USING THE GSM 4.0 SOFTWARE. W.O. 1070469 | NONE THESE ARE NEW DBS TO BE CREATED IN THIS PRODUCTION ENVIRONMENT. NO ONE IS USING THIS APPLICATION AT THIS TIME. | N | 4/12/2 | WILLIAM MASTERS (N) | JUDITH KING (N); KARLEE DAUM (N) | REMOVE THE DBS AND MARK THE CHANGE CONTROL AS A FAILURE. WORK WITH CUSTOMER AND VENDOR TO RESOLVE PROBLEMS. | RUN THE GSM SOFTWARE THAT WILL BUILD THE TWO DATABSES ASSURENT AND PORTAL ON THE STAGING CLUSTER HQSQLPRD03. | VERIFY WITH MY MSSQL ENTERPRISE TOOL THAT THEY EXIST. | RSM | W.O. 1070469 | KIMBALL COOK | 4/11/05 11:20 AM |
| 21939 | DANIEL PECORA | 5/12/05 8:00 PM | 5/13/05 4:00 AM | 4 HOURS | Yes | PRODUCTION | HQ-EXCH02 | CORPORATE EMAIL CLUSTER | UPGRADE THE LEVEL OF RDAC (MULTI-PATHING SOFTWARE) FROM 8.40.3201 TO 9.10.G2.01 REASON: RDAC LEVEL MUST BE ABOVE VERSION 9 BEFORE THE DISK ARRAY FIRMWARE CAN BE UPGRADED. IT IS ALSO A CURRENCY LEVEL ITEM. | NONE - SINCE THE SERVER IS CLUSTERED, THERE WILL ONLY BE A BRIEF MOMENT WHEN MAIL IS NOT ROUTING WHILE SERVICES ARE FAILING OVER FROM THE ACTIVE NODE TO THE PASSIVE NODE, AND BACK AFTER THE INSTALL HAS COMPLETED. | N | 4/26/2 | DWIGHT ALLMON (Y); BARB LARSEN (Y) | WARREN ROSENBLUM (Y) | BACKUPS WILL BE CONFIRMED BEFORE THE UPGRADE BEGINS. IF NECESSARY, THE ORIGINAL DRIVER VERSION WOULD BE REINSTALLED. THE ONLY PROBLEM WITH THAT IS, IT WILL HOLD UP OUR MADATORY DISK ARRAY CODE UPGRADE. IF A FULL SERVER RESTORE IS REQUIRED, 24 HOURS MAY BE NEEDED. NORMAL ESCALATION PROCEUDRES WOULD BE USED IF PROBLEMS SHOULD ARISE. | SEE UPGRADE PLAN AT G:\EDS\HW CURRENCY\RDAC | THE WINDOWS ADMIN WILL USE SYSTEM TOOLS TO REVIEW THE NEW RDAC VERSION. THE INSTALL LOGS WILL ALSO BE REVIEWED. ALL DRIVES, FILE SYSTEMS, AND DISK PATHING WILL BE CHECKED AFTER THE RDAC UPGRADE. EMAIL FUNCTIONALITY WILL BE CHECKED AFTER THE SERVER IS BACK ONLINE. | HW/SW CURRENCY | N/A | DANIEL PECORA / MATT BAROODY | 4/21/05 2:35 PM |
| 21940 | DANIEL PECORA | 5/12/05 8:00 PM | 5/13/05 4:00 AM | 4 HOURS | Yes | PRODUCTION | HQ-EXCH05 | CORPORATE EMAIL CLUSTER | UPGRADE THE LEVEL OF RDAC (MULTI-PATHING SOFTWARE) FROM 8.40.3201 TO 9.10.G2.01 REASON: RDAC LEVEL MUST BE ABOVE VERSION 9 BEFORE THE DISK ARRAY FIRMWARE CAN BE UPGRADED. IT IS ALSO A CURRENCY LEVEL ITEM. | NONE - SINCE THE SERVER IS CLUSTERED, THERE WILL ONLY BE A BRIEF MOMENT WHEN MAIL IS NOT ROUTING WHILE SERVICES ARE FAILING OVER FROM THE ACTIVE NODE TO THE PASSIVE NODE, AND BACK AFTER THE INSTALL HAS COMPLETED. | N | 4/26/2 | DWIGHT ALLMON (Y); BARB LARSEN (Y) | WARREN ROSENBLUM (Y) | BACKUPS WILL BE CONFIRMED BEFORE THE UPGRADE BEGINS. IF NECESSARY, THE ORIGINAL DRIVER VERSION WOULD BE REINSTALLED. THE ONLY PROBLEM WITH THAT IS, IT WILL HOLD UP OUR MADATORY DISK ARRAY CODE UPGRADE. IF A FULL SERVER RESTORE IS REQUIRED, 24 HOURS MAY BE NEEDED. NORMAL ESCALATION PROCEUDRES WOULD BE USED IF PROBLEMS SHOULD ARISE. | SEE UPGRADE PLAN AT G:\EDS\HW CURRENCY\RDAC | THE WINDOWS ADMIN WILL USE SYSTEM TOOLS TO REVIEW THE NEW RDAC VERSION. THE INSTALL LOGS WILL ALSO BE REVIEWED. ALL DRIVES, FILE SYSTEMS, AND DISK PATHING WILL BE CHECKED AFTER THE RDAC UPGRADE. EMAIL FUNCTIONALITY WILL BE CHECKED AFTER THE SERVER IS BACK ONLINE. | HW/SW CURRENCY | N/A | DANIEL PECORA / MATT BAROODY | 4/21/05 2:36 PM |
| 21625 | DANIEL TRUJILLO | 5/13/05 4:00 PM | 5/13/05 8:00 PM | 120 MINS | Yes | PRODUCTION | ELKRIDGE, MD WAN ROUTER | QWEST DOMESTIC WAN | CONVERT THE ELKRIDGE, MD OFFICE TO THE QWEST DOMESTIC WAN FROM THE MCI DOMESTIC WAN | WIDE AREA NETWORK CONNECTIVITY WILL BE LOST FOR 5-10 MINUTES WHILE THE LOCAL AREA NETWORK IS CUTOVER FROM EXISTING MCI WAN & ROUTER TO NEW QWEST WAN & NEW ROUTER. NEW ROUTER AND CIRCUIT WILL BE INSTALLED AND TESTED PRIOR TO THE CUTOVER IN ORDER TO MINIMIZE DISRUPTION. ACTUAL CUTOVER TIME IS SCHEDULED FOR 7:00 PM EST | N | 4/19/2 | CAROLYN HYDE (N) | JAMES WAMSLEY (N); STEVEN GAST (N) | RE-CONNECT EXISTING ROUTER AND MCI WAN LINK, CUT LAN BACK OVER TO EXISTING ROUTER FROM THE NEW ONE. | 1 - INSTALL THE NEW ROUTER INTO THE EQUIPMENT RACK 2 - PLUG INTO UPS AND POWER UP 3 - DISCONNECT THE EXTERNAL MODEM FROM THE EXISTING ROUTER AND CONNECT IT TO THE NEW ROUTER AND TEST CONNECTIVITY. 4 - ACTIVATE THE NEW WAN CIRCUIT WITH QWEST, TEST FROM LOUISVILLE. 5 - DISCONNECT THE ETHERNET CABLE CONNECTING THE EXISTING ROUTER TO THE CISCO LAN SWITCH FROM EXISTING ROUTER AND PLUG IT INTO THE NEW ROUTER, CONNECT NEW ROUTER TO NEW WAN CIRCUIT. 6 - TEST NEW CONNECTION IN OFFICE AND REMOTELY VIA HQ | VERIFY CONSOLE CONNECTIVITY TO NEW ROUTER & OFFICE LAN VIA THE QWEST DOMESTIC WAN. QWEST ENGINEERING CONFIRMATION OF CONNECTIVITY AT THE TIME OF THE CUTOVER. VALIDATION BY LOCAL OFFICE STAFF. | WAN CONVERSION | N/A | DANIEL TRUJILLO / JAMES WAMSLEY | 2/25/05 4:06 PM |
| 21817 | GEORGE DINAKAR | 5/13/05 5:00 PM | 5/13/05 11:00 PM | 6 HOURS | Yes | PRODUCTION | FARWELL | COGNOS REPORT NET | WE ARE APPLYING A HOT PATCH TO THE PRODUCTION SERVER.- CHANGING DATES AS WE NEED TO LOOK INTO THE DEPLOYMENT METHOD... ALSO-WAITING FOR INSTRUCTIONS FROM COGNOS SUPPORT) | CIF (COGNOS) USERS & DISTRIBUTED DELIVERY TEAM. NO SERVER OUTAGE. | N | 4/12/2 | CHERYL LANDWEHR (N); CARLA LEET (N) | WILLIAM MALLOT (N); CHERYL LANDWEHR (N) | 1) MAY 12, 2005 2) 4 HOURS 3) GEORGE DINAKAR 720-560-7676 |
INSTALL REPORT NET PATCH (HOT FIX) | CHECK THE REPORT NET APPLICATION [FIX INCORRECT DATA (ZERO-S VERSUS VALID VALUES) WHEN A TABULAR SET WAS USED] | CIF | CHERYL LANDWEHR / GEORGE DINAKAR | 3/31/05 5:02 PM | |
| 21977 | SATISH VEGESNA | 5/13/05 7:00 PM | 5/13/05 7:30 PM | 30 MINS | Yes | PRODUCTION | MCKENNA & WASSACH | CLARIFY | THIS IS A STANDARD CHANGE CONTROL FOR ANY CLARIFY NON SCHEMA CHANGES TO BE RELEASD FOR THE WEEK. THIS WILL REQUIRE NO DOWN TIME TO USERS. | SINCE CHANGE WILL REQUIRE NO DOWN TIME TO USERS, THE USERS NEED TO UPDATE THEIR DESKTOP TO GET THE LATEST CODE. THE DETAILED IMPACT WILL BE COMMUNICATED TO THE USER SEPARATELY. | N | WARREN ROSENBLUM (N); BARB LARSEN (N) | WILLIAM MALLOT (N) | PROMOTE THE PREVIOUS VERSION OF THE CODE FROM SOURCE SAFE. | SEND COMMUNICATION TO USERS ON THE CHANGE. PROMOTE THE NEW CODE TO PRODUCTION. VALIDATE THE CHANGES. VALIDATE THE SYSTEM. RELEASE THE SYSTEM TO USERS. | PERFORM THE VALIDATION TASKS FOR THE CHANGE. | STANDARD FRIDAY NIGHT 7:00 | SATISH VEGESNA | 4/27/05 8:39 AM | ||
| 21963 | CARL NEER | 5/13/05 7:00 PM | 5/14/05 12:00 AM | 2 HOURS | Yes | PRODUCTION | XX-PTL01, XX-PTL02 | PORTAL - SALES COMM | SALES COMM POST-DEPLOYMENT PERIOD - PRODUCTION TICKET CHANGES TO SALES COMM SITE | SBA - MOMENTARY DELAYS DURING IIS RESETS, SALES USERS - MOMENTARY DELAYS DURING IIS RESETS, SALES PUBLISHERS - NO PUBLISHING ACTIVITY DURING CHANGE WINDOW | N | 4/26/2 | WILLIAM PURCELL (Y); PENELOPE BARTELL (Y) | CARL NEER (Y); CARLOS SILVA (Y); SCOTT ANDERSEN (Y) | DEPENDING ON THE PROBLEM ENCOUNTERED, EITHER RESTORE THE PORTAL OR THE DATABASE GROUPS. PORTAL AND DB GROUP BACKUPS OCCUR 1 HOUR PRIOR TO CHANGE WINDOW, TIME TO RESTORE ESTIMATED AT 2 HOURS, BUSINESS APPROVERS NOTIFIED IF CHANGE WINDOW EXCEEDED. | EXECUTE PORTAL AND DB BACKUPS, PROMOTE PORTAL AND SALES COMM CODE TO PRODUCTION, PERFORM IIS RESETS ON BOTH SERVERS, VALIDATE SITE FUNCTIONALITY. | CHECK PUBLISHING UPDATES EXECUTE WITH DATASHEET, VALIDATE CORRECT EVENT HANDLING AND PUBLISHING CHANGES. | SALES COMM | 1085250 | CARL NEER / COREY EVANS | 4/25/05 2:50 PM |
| 21974 | JOHN SKALSKY | 5/13/05 7:00 PM | 5/14/05 12:00 AM | 24 HOURS | Yes | PRODUCTION | SEE PROD SERVER SPREADSHEET | SEE PROD SERVER SPREADSHEET | UPDATE ALL PRODUCTION SERVERS WITH LATEST SECURITY PATCHES | SERVERS/SYSTEMS WILL NOT BE AVAILABLE DURING UPDATES AND REBOOTS. FOR INSTALL AND REBOOT SCHEDULE PLEASE SEE SPREADSHEET LOCATED AT: G:\INFORMATION SYSTEMS\CHANGE MANAGEMENT\MSPATCH20050422NTDEPLOYMENT.XLS. | N | WARREN ROSENBLUM (N); DWIGHT ALLMON (N) | JOHN SKALSKY (Y); BRIAN LANGE (N) | A FULL BACKUP WILL BE COMPLETED PER CURRENT SCHEDULE. IF A RESTORE IS NEEDED, A FULL AND ANY INCREMENTAL BACKUPS WILL BE USED. IF CHANGE EXCEEDS THE CHANGE WINDOW, THE ONCALL MANAGER WILL BE CONTACTED. | UPDATE ALL PRODUCTION SERVERS WITH LATEST SECURITY PATCHES RECOMMENDED BY MICROSOFT, THEN REBOOT. THE MS RECOMMENDED PATCHES ARE: MS05-020, ALL SERVERS; MS05-021, EXCHANGE SERVERS; MS05-019, ALL SERVERS; MS05-016, ALL SERVERS; MS05-018, ALL SERVERS. THESE HAVE BEEN APPROVED BY BRIAN LANGE | ALL PATCHES WILL HAVE BEEN APPLIED TO TEST AND DEV SERVERS | 1086086 | JOHN SKALSKY | 4/26/05 2:15 PM | ||
| 21112 | DANIEL PECORA | 5/14/05 1:00 AM | 5/14/05 5:00 PM | 8 HOURS | Yes | PRODUCTION | HQ-SQL01/02/03/04/06/07/STG01/ | HQ-SQLSTG01,02,03, HQ-XTEND01, AND NEW IXOS CLUSTE | PER STORAGETEK'S NEW FIRMWARE RELEASE PROGRAM, ALL D AND B SERIES DISK ARRAYS MUST HAVE A MINIMUM ACCEPTABLE FIRMWARE LEVEL INSTALLED (MAL). THE FIRMWARE ON STK428-1 (BC84 - BLADESTORE), STK427-1, AND STK913-1 (D178'S) WILL BE UPGRADED TO 06.10.11.00. | ALL DATABASES AND APPLICATIONS WILL BE UNAVAILABLE DURING THE OUTAGE. APPS/DB'S ARE; HYPERION,PRICEBOOK,BLACKBERRY,CHANNEL SITE QUOTE,CONTRACT REVIEW,EPARTNERS/MEMBERS,FRED,ORDERS,SALES COMMUNITY,MEDIA,NCOMPASS,CMS,PRIMUS,DOCENT,IPC,KPMG TOOL,OSIRIS,CORP TAX,PROMODG,CUSTMART,DIABLO,EDS METRICS,HALO,MARKETING/ETL/CIF,MERCURY TEST DIRECTOR,TESTER DATA,ECOM. | N | 1/4/20 | STANLEY CROUSE (N); WARREN ROSENBLUM (N); ANDREW ZARTMAN (N); WILLIAM PURCELL (N); ASHIK MOMEN (N); THOMAS APPS (N); PENELOPE BARTELL (N); ANN BRUINSMA (N); MARK MARTI (N); JUDY HEIN (N); RAJEEV ANKIREDDYPALLI (N); SHANNON ODONOVAN (N); BARB LARSEN (Y); MARTIN MILES (N); SARAH BROWN (N) | JAMES FREW (N); WENDELL RUSSELL (N); SRIDHAR BOMMENA (N) | DATABASE BACKUPS WILL BE RUN BEFORE THE UPGRADES START. SINCE THE DATA IS MIRRORED, AS LONG AS THE FIRST D178 DISK ARRAY UPGRADE GOES AS PLANNED, THERE SHOULD BE NO REASON TO RESTORE. IF A RESTORE WAS NEEDED, THE DATA ON THE MIRRORED ARRAY WOULD BE USED. IF PROBLEMS OCCUR WITH THE FIRST D178 ARRAY, THE CHANGE CONTROL WILL BE POSTPONED. | SEE UPGRADE PLAN AT G:\EDS\HW CURRENCY\DISK ARRAYS | USE SANTRICITY ARRAY TOOL TO CONFIRM NEW FIRMWARE LEVEL. | HW/SW CURRENCY | N/A | DANIEL PECORA / MATT BAROODY | 12/28/04 11:26 AM |
| 21902 | ROBERT HAYNES | 5/14/05 4:00 AM | 5/14/05 2:00 PM | 10 HOURS | Yes | PRODUCTION | LSV-APPS08, 11 AND 24 | SIEBEL 6.0 PROD | PROMOTION SIEBEL 6.0 QAS REPOSITORY TO SIEBEL 6.0 PROD. | SIEBEL 6.0 PROD WILL BE UNAVAILABLE DUING PROMOTION PROCESS, FOR SIEBEL.SRF REPLACEMENT AND APPLICATION SERVICE CYCLE | N | CHRISTINA D'AMICO (N); ANN BRUINSMA (Y); RAJEEV ANKIREDDYPALLI (Y) | WILLIAM MALLOT (Y) | SIEBEL 6.0 PROD HAS A COLD BACKUP TAKEN EVERY SATURDAY MORNING. RESTORE OF THE DATABASE CAN TAKE FROM 8 TO 10 HOURS. NOTIFY BOB HAYNES IF RESTORE WINDOW IS EXCEEDED. | PROMOTION OF SIEBEL 6.0 QAS REPOSITORY, COMPILATON OF SIEBEL.SRF FILE, CREATION AND DISTRIBUTION OF SIEBEL.SRF KIT, REPLACEMENT OF SIEBEL.SRF WITH NEW COPY AND CYCLE OF APPLICATION SERVICES ON ALL THREE WINDOWS APPLICATION SERVERS | SIEBEL 6.0 QAS FUNCTIONALITY WILL BE AVAILABLE IN PRODUCTION. | RESPOSITORY MIGRATION/PROMOTION | 1083168 | ROBERT HAYNES | 4/19/05 8:51 AM | |
| 21910 | ROBERT HAYNES | 5/14/05 4:00 AM | 5/14/05 2:00 PM | 12 HOURS | Yes | PRODUCTION | SAN MIGUEL CLUSTER | SIEBEL 7.5 PRD | PROMOTION/MIGRATION OF SIEBEL 7.5 QAS REPOSITORY TO SIEBEL 7.5 PRD. | SIEBEL 7.5 WILL BE UNAVAILABLE DURING PROMOTION PROCESS AND SERVICE CYCLE | N | CHRISTINA D'AMICO (N); TED GUDLEVICH (N); ANN BRUINSMA (Y); MARTIN MILES (Y) | WILLIAM MALLOT (Y) | SIEBEL 7.5 PRD DATABASE HAS A COLD BACKUP TAKEN EVERY SATURDAY MORNING. IT CAN TAKE FROM 8 TO 10 HOURS TO RESTORE. CONTACT BOB HAYNES IF RESTORE WINDOW IS EXCEEDED. | MIGRATION/PROMOTION OF SIEBEL 7.5 QAS REPOSITIORY TO SIEBEL 7.5 PRD, COMPILE REPOSITORY, MOVE TO THE PRODUCTION SERVER, GENERATE GENBSCRIPTS AND CYCLE APPLICATION AND WEB SERVICES. | SIEBEL 7.5 QAS APPLICATION UPDATES WILL BE VISIBLE IN SIEBEL 7.5 PRD. | REPOSITORY MIGRATION/PROMOTION | 1083221 | ROBERT HAYNES | 4/19/05 10:37 AM | |
| 21675 | ROBERT HAYNES | 5/14/05 5:00 AM | 5/14/05 6:00 PM | 30 MINS | Yes | PRODUCTION | LSV-APPS08, APPS11 AND APPS24 | SIEBEL 6.0 PROD | QUARTERLY TASK OF CHANGING SIEBEL 6.0 PRODUCTION PASSWORDS | SIEBEL 6.0 WILL NOT BE AVAILABLE FOR 30 MINUTES FOR SERVICE CYCLE | N | 3/8/20 | CHRISTINA D'AMICO (Y); RAJEEV ANKIREDDYPALLI (N); ANN BRUINSMA (Y) | WILLIAM MALLOT (Y) | SIEBEL 7.5 DATABASE HAS A COLD BACKUP CREATED SATURDAY MORNING. IT CAN TAKE 8 TO 10 HOURS TO RESTORE THE DATABASE. NOTIFY BOB HAYNES IF RESTORE WINDOW IS EXCEEDED. | CHANGING SIEBEL ADMIN AND DATABASE APPLICATION PASSWORDS | OLD PASSWORDS WILL NOT ALLOW ACCESS TO THE SIEBEL ADMINISTRATIVE AREAS | PASSWORD CHANGING | 1066073 | ROBERT HAYNES | 3/4/05 3:48 PM |
| 21870 | DANIEL PECORA | 5/14/05 7:00 AM | 5/14/05 7:00 PM | 6 HOURS | Yes | PRODUCTION | BELMEAR | LDAP AUTHENTICATION SERVICES | UPGRADE THE VERITAS FILE SYSTEM AND VOLUME MANAGER VERSION TO 4.0. REASON: THE VERSION CURRENTLY ON THE SERVER WILL NOT BE SUPPORTED AFTER 2005. | SIEBEL 7.5, COGNOS, AND THE ID ADMIN TOOL (HELP
DESK) ARE THE ONLY IMPACTED APPLICATIONS. THESE SERVICES WILL NOT
BE AVAILABLE DURING THE UPGRADE. |
N | CARLA LEET (N); RAJEEV ANKIREDDYPALLI (N) | WILLIAM MALLOT (Y); WARREN ROSENBLUM (N); REBECCA MATZ (N); WENDY DYAKOVICH (N); BRAD BALLARD (N); KATHY GOODELL (Y) | FULL AND INCREMENTAL BACKUPS WILL BE CONFIRMED BEFORE THE CHANGE CONTROL STARTS, ALONG WITH A FULL BEFORE THE UPGRADE BEGINS. IF THERE ARE HARDWARE OR BACKUP PROBLEMS THE CHANGE CONTROL WILL BE CANCELED. IT'S POSSIBLE THAT A FULL SERVER RESTORE COULD TAKE 24 HOURS. NORMAL ESCALATION PROCEDURES WILL BE FOLLOWED AS WELL AS COMMUNICATION TO THE BUSINESS CONTACT. | SEE UPGRADE PLAN AT G:\EDS\HW CURRENCY\VERITAS UPGRADES. | UNIX ADMIN WILL VERIFY ALL FILE SYSTEMS AND VOLUMES. ADMIN WILL ALSO USE THE FOLLOWING VERITAS COMMANDS TO CONFIRM DISK GROUP, AND FILE SYSTEM VERSIONS; VXUPGRADE "FILE SYSTEM NAME" : VXDG LIST "DISK GROUP NAME". THE LDAP FUNCTIONS WILL ALSO BE CHECK AFTER THE UPGRADE HAS BEEN COMPLETED. | HW/SW CURRENCY | N/A | DANIEL PECORA / JOHN MCEWAN | 4/13/05 8:30 AM | |
| 21673 | ROBERT HAYNES | 5/14/05 8:00 AM | 5/14/05 6:00 PM | 30 MINS | Yes | PRODUCTION | SAN MIGUEL CLUSTER | SIEBEL 7.5 PROD | QUARTERLY TASK OF CHANGING SIEBEL 7.5 PRODUCTION PASSWORDS | SIEBEL 7.5 PRD WILL NOT BE AVAILABLE FOR 30 MINUTES DURING SERVICE CYCLE. | N | 3/8/20 | CHRISTINA D'AMICO (Y); TED GUDLEVICH (Y); ANN BRUINSMA (Y); MARTIN MILES (Y) | WILLIAM MALLOT (Y) | SIEBEL 7.5 DATABASE HAS A COLD BACKUP CREATED SATURDAY MORNING. IT CAN TAKE 8 TO 10 HOURS TO RESTORE THE DATABASE. NOTIFY BOB HAYNES IF RESTORE WINDOW IS EXCEEDED. | CHANGING SIEBEL ADMIN AND DATABASE APPLICATION PASSWORDS | OLD PASSWORDS WILL NOT ALLOW ACCESS TO THE SIEBEL ADMINISTRATIVE AREAS | CHANGE PASSWORDS | 1066073 | ROBERT HAYNES | 3/4/05 3:38 PM |
| 21952 | JULIANNE IRWIN | 5/15/05 12:00 PM | 5/15/05 8:00 PM | 8 HOURS | Yes | PRODUCTION | HANDIES | SAP | INSTALL PLUG-INS TO GET CURRENT ON CODE CHANGES PROVIDED BY SAP. | ALTHOUGH THE SYSTEM WILL REMAIN UP, SAP USERS SHOULD NOT PERFORM UPDATES AT THIS TIME. THIS DOES NOT APPLY TO ESS. | N | WARREN ROSENBLUM (N) | GREG SCHAFER (N) | RESTORE FROM BACKUP ON 5/14 WHICH WOULD LAST APPROX. 4 HOURS. NORMAL ESCALATION PROCEDURES WOULD APPLY. | INSTALL PLUG-INS (CODE CHANGES FOR SAP PROPRIATORY CODE. | GLOBAL TRADE USERS TO TEST. | SAP STACK UPDATE | N/A | JULIANNE IRWIN | 4/25/05 8:38 AM | |
| 21981 | MATTHEW FRENCH | 5/16/05 4:00 PM | 5/16/05 7:00 PM | 3 HOURS | Yes | PRODUCTION | SUN CLUSTER | STK IDENTITY MANAGER | UPLOAD POST-PRODUCTION FIXES TO SIM. | EAME IDENTITY MANAGEMENT USERS. | N | MARTIN MILES (N) | JAMES BIDDLE (N) | REMOVE UPLOADED CODE FROM PRODUCTION. | UPLOAD FILES THROUGH THE ADMIN INTERFACE .. NO ACTION IS REQUIRED ON THE APP SERVER (NO RESTART REQUIRED). | NEW CODE WILL BE AVAILABLE ON PRODUCTION. | IDENTITY MANAGEMENT POST-PRODUCTION | MATTHEW FRENCH / ARVIND VENKATARAMAN | 4/28/05 8:55 AM | ||
| 21964 | KATHY RUBALCABA | 5/18/05 8:00 AM | 5/18/05 10:00 AM | 30 MINS | Yes | PRODUCTION | DC01 (RMS SERVER) | FILE SERVER | UPDATE THE RMS SERVER, DC01, WITH WINDOWS 2000 SP4. | NONE - THE CUSTOMER REQUESTED THAT SERVERS BE REBOOTED DURING THE DAY, NOT EVENINGS OR WEEK-ENDS. | N | BILL MASTERS (N) | KATHY RUBALCABA (N) | THE SERVERS ARE BACKED UP LOCALLY EVERY NIGHT. LOCAL ADMINS HAVE PROCEDURES TO RECOVER/REBUILD A SERVER. | UPGRADE THE SERVER TO THE LATEST SERVICE PACK. | THE SERVICE PACK IS ALREADY INSTALLED ON ALL LOUISVILLE SERVERS. | TASK ORDER | KATHY RUBALCABA | 4/25/05 3:11 PM | ||
| 21965 | KATHY RUBALCABA | 5/18/05 8:00 AM | 5/18/05 10:00 AM | 30 MINS | Yes | PRODUCTION | UAE01-AUTH (RMS) | AUTHENTICATION SERVER | UPGRADE SERVER TO WIN2000 SERVICE PACK 4. | NONE - THE CUSTOMER REQUESTED REBOOTS DURING THE DAY INSTEAD OF EVENINGS OR WEEK-ENDS. | N | BILL MASTERS (N) | KATHY RUBALCABA (N) | A BACKUP OF THE SERVER IS RUN LOCALLY NIGHTLY. LOCAL ADMINS HAVE PROCESS FOR RESTORE/REBUILD OF SERVER. | UPGRADE SERVER TO WIN2000 SERVICE PACK 4. | SERVICE PACK 4 HAS BEEN INSTALLED ON ALL NORTHAMERICA/LOUISVILLE SERVERS. | TASK ORDER | KATHY RUBALCABA | 4/25/05 3:23 PM | ||
| 21928 | STEPHEN PARKER | 5/19/05 12:00 AM | 5/19/05 12:00 PM | 1 HOURS | Yes | PRODUCTION | TBD | TBD | WORK ORDER - TBD DOCUMENTATION ON WO AVAILABLE AT LSV-DFS01/BET/PROJECTS/6-WORK ORDERS/E-BUSINESS/XXXXXX | NO REBOOT OR IIS RESTART REQUIRED. | N | BARBARA RUCKER (N) | SARAH KENNEDY (N) | THE ONE OLD ASP HAS BEEN COPIED TO A SAVE CODE LOCATION. IF THE MOVE FAILS, THE OLD ASP WILL BE RESTORED. | APS'S WILL BE MOVED FROM THE DEVELOPMENT ENVIROMENT (XXXXX) TO THE PRODUCTION ENVIROMENT (XXXXXX) | ASP DATES IN PRODUCTION WILL MATCH THOSE IN DEVELOPMENT. UPON MOVEMENT, THE PRODUCTION SYSTEM WILL IMMEDIATELY BE TESTED FOR FUNCTIONALITY BY THE DEVELOPER AND CUSTOMER. | TBD | TBD | STEPHEN PARKER | 4/21/05 1:21 PM | |
| 21966 | KATHY RUBALCABA | 5/19/05 8:00 AM | 5/19/05 10:00 AM | 30 MINS | Yes | PRODUCTION | PORTAL1 (RMS) | WEB SERVER | UPGRADE SERVER TO SERVICE PACK 4. | NONE - THE CUSTOMER REQUESTED REBOOTS DURING THE DAY INSTEAD OF EVENINGS OR WEEK-ENDS. | N | BILL MASTERS (N) | KATHY RUBALCABA (N) | A BACKUP OF THE SERVER IS RUN LOCALLY NIGHTLY. LOCAL ADMINS HAVE A PROCESS FOR RECOVERY/REBUILD OF SERVER. | UPGRADE SERVER TO WIN2000 SERVICE PACK 4. | THIS SERVICE PACK HAS BEEN INSTALLED ON ALL NORTHAMERICA/LOUISVILLE SERVERS. | TASK ORDER | KATHY RUBALCABA | 4/25/05 3:31 PM | ||
| 21967 | KATHY RUBALCABA | 5/19/05 8:00 AM | 5/19/05 10:00 AM | 30 MINS | Yes | PRODUCTION | UAE02-AUTH (RMS) | AUTHENTICATION SERVER (SECONDARY) | UPGRADE SERVER TO WIN2000 SERVICE PACK 4 | NONE - CUSTOMER HAS REQUESTED THAT SERVERS BE REBOOTED DURING THE DAY INSTEAD OF EVENINGS OR WEEK-ENDS. | N | BILL MASTERS (N) | KATHY RUBALCABA (N) | A BACKUP IS RUN LOCALLY NIGHTLY. LOCAL ADMINS HAVE PROCESS FOR RECOVERY/REBUILD OF SERVER. | UPGRADE SERVER TO WIN2000 SERVICE PACK 4. | THIS UPGRADE HAS BEEN INSTALLED ON ALL NORTHAMERICA/LOUISVILLE SERVERS. | TASK ORDER | KATHY RUBALCABA | 4/25/05 3:38 PM | ||
| 21971 | BRAD BALLARD | 5/19/05 8:00 AM | 5/19/05 12:00 PM | 4 HOURS | Yes | PRODUCTION | FARWELL, KATAKA, ELBERT | CIF DATA WAREHOUSE | WEEKLY PROMOTION OF CIF CODE, DATABASE AND SCHEDULING CHANGES, AND DATA MAINTENANCE | NO SERVER OR DATABASE OUTAGE, AGREEMENT WITH AFFECTED USERS WILL BE NEGOTIATED PRIOR TO WINDOW. | N | CHERYL LANDWEHR (N); CARLA LEET (N) | SUE TORRERO (N) | DEFINED AND APPROVED BEFORE WINDOW | DEFINED AND APPROVED BEFORE WINDOW | DEFINED AND APPROVED BEFORE WINDOW | CIF SUPPORT | BRAD BALLARD / JABAKUMAR ISAAC | 4/26/05 10:35 AM | ||
| 21982 | SATISH VEGESNA | 5/20/05 7:00 PM | 5/20/05 7:30 PM | 30 MINS | Yes | PRODUCTION | MCKENNA & WASSACH | CLARIFY | THIS IS A STANDARD CHANGE CONTROL FOR ANY CLARIFY NON SCHEMA CHANGES TO BE RELEASD FOR THE WEEK. THIS WILL REQUIRE NO DOWN TIME TO USERS. | SINCE CHANGE WILL REQUIRE NO DOWN TIME TO USERS, THE USERS NEED TO UPDATE THEIR DESKTOP TO GET THE LATEST CODE. THE DETAILED IMPACT WILL BE COMMUNICATED TO THE USER SEPARATELY. | N | WARREN ROSENBLUM (N); BARB LARSEN (N) | WILLIAM MALLOT (N) | PROMOTE THE PREVIOUS VERSION OF THE CODE FROM SOURCE SAFE. | SEND COMMUNICATION TO USERS ON THE CHANGE. PROMOTE THE NEW CODE TO PRODUCTION. VALIDATE THE CHANGES. VALIDATE THE SYSTEM. RELEASE THE SYSTEM TO USERS. | PERFORM THE VALIDATION TASKS FOR THE CHANGE. | STANDARD FRIDAY NIGHT 7:00 | SATISH VEGESNA | 4/28/05 9:08 AM | ||
| 21528 | JIM LUETHYE | 5/20/05 7:00 PM | 5/20/05 8:00 PM | 30 MINS | Yes | PRODUCTION | HQ-WEB01 | CHANGE MANAGEMENT APPLICATION | IMPLEMENTING NEW SEARCH FUNCTION THAT WILL ALLOW ALL REPORTING TO BE DONE VIA THE WEB. ALSO IMPLEMENTING CHANGES TO RESOLVE AUDIT DEFICIENCIES: 1) REMEDY TICKET/WORK ORDER/PROJECT NAME WILL BE REQUIRED; 2) CMRS WILL NOT BE ALLOWED TO BE CLOSED WITHOUT MEETING APPROVAL OF THE REQUEST, 3) RECURRING REQUESTS WILL NO LONGER BE PERMITTED. | ANYONE ACTIVELY USING THE CHANGE MANAGEMENT APPLICATION DURING THE CHANGE REQUEST WINDOW MAY EXPERIENCE UNPREDICTABLE RESULTS | N | 3/15/2 | DWIGHT ALLMON (N) | JIM LUETHYE (Y) | A COPY OF THE CURRENT WEBSITE WILL BE CREATED PRIOR TO UPLOADING FROM DEVELOPMENT TO PRODUCTION. AS A RESULT, THE DATE OF LAST FULL BACKUP IS NOT APPLICABLE. TIME REQUIRED TO RESTORE WILL BE LESS THAN 5 MINUTES. IF THE WINDOW IS EXCEEDED, JIM LUETHYE WILL BE CONTACTED AND WILL ESCALATE TO DWIGHT ALLMON FOR DIRECTION AS TO CONTINUE OR BACKOUT THE CHANGE | UPLOAD DEVELOPMENT INSTANCE OF THE CHANGE MANAGEMENT WEBSITE ON ENG-WEB01 TO PRODUCTION SERVER HQ-WEB01 | NEW SEARCH FUNCTIONALITY IS AVAILABLE ON THE PRODUCTION CHANGE MANAGEMENT WEBSITE | JIM LUETHYE / CHUCK DECAMP | 2/18/05 10:31 AM | ||
| 21903 | ROBERT HAYNES | 5/21/05 4:00 AM | 5/21/05 2:00 PM | 10 HOURS | Yes | PRODUCTION | LSV-APPS08, 11 AND 24 | SIEBEL 6.0 PROD | PROMOTION SIEBEL 6.0 QAS REPOSITORY TO SIEBEL 6.0 PROD. | SIEBEL 6.0 PROD WILL BE UNAVAILABLE DUING PROMOTION PROCESS, FOR SIEBEL.SRF REPLACEMENT AND APPLICATION SERVICE CYCLE | N | CHRISTINA D'AMICO (N); ANN BRUINSMA (Y); RAJEEV ANKIREDDYPALLI (Y) | WILLIAM MALLOT (Y) | SIEBEL 6.0 PROD HAS A COLD BACKUP TAKEN EVERY SATURDAY MORNING. RESTORE OF THE DATABASE CAN TAKE FROM 8 TO 10 HOURS. NOTIFY BOB HAYNES IF RESTORE WINDOW IS EXCEEDED. | PROMOTION OF SIEBEL 6.0 QAS REPOSITORY, COMPILATON OF SIEBEL.SRF FILE, CREATION AND DISTRIBUTION OF SIEBEL.SRF KIT, REPLACEMENT OF SIEBEL.SRF WITH NEW COPY AND CYCLE OF APPLICATION SERVICES ON ALL THREE WINDOWS APPLICATION SERVERS | SIEBEL 6.0 QAS FUNCTIONALITY WILL BE AVAILABLE IN PRODUCTION. | RESPOSITORY MIGRATION/PROMOTION | 1083168 | ROBERT HAYNES | 4/19/05 8:52 AM | |
| 21911 | ROBERT HAYNES | 5/21/05 4:00 AM | 5/21/05 2:00 PM | 12 HOURS | Yes | PRODUCTION | SAN MIGUEL CLUSTER | SIEBEL 7.5 PRD | PROMOTION/MIGRATION OF SIEBEL 7.5 QAS REPOSITORY TO SIEBEL 7.5 PRD. | SIEBEL 7.5 WILL BE UNAVAILABLE DURING PROMOTION PROCESS AND SERVICE CYCLE | N | CHRISTINA D'AMICO (Y); TED GUDLEVICH (N); ANN BRUINSMA (Y); MARTIN MILES (Y) | WILLIAM MALLOT (Y) | SIEBEL 7.5 PRD DATABASE HAS A COLD BACKUP TAKEN EVERY SATURDAY MORNING. IT CAN TAKE FROM 8 TO 10 HOURS TO RESTORE. CONTACT BOB HAYNES IF RESTORE WINDOW IS EXCEEDED. | MIGRATION/PROMOTION OF SIEBEL 7.5 QAS REPOSITIORY TO SIEBEL 7.5 PRD, COMPILE REPOSITORY, MOVE TO THE PRODUCTION SERVER, GENERATE GENBSCRIPTS AND CYCLE APPLICATION AND WEB SERVICES. | SIEBEL 7.5 QAS APPLICATION UPDATES WILL BE VISIBLE IN SIEBEL 7.5 PRD. | REPOSITORY MIGRATION/PROMOTION | 1083221 | ROBERT HAYNES | 4/19/05 10:38 AM | |
| 21738 | DANIEL PECORA | 5/21/05 10:00 PM | 5/22/05 10:00 AM | 6 HOURS | Yes | PRODUCTION | BLANC | UNIX APPLICATION LICENSE SERVER | UPGRADE THE VERITAS FILE SYSTEM AND VOLUME MANAGER VERSION TO 4.0. REASON: THE VERSION CURRENTLY ON THE SERVER IS NO LONGER SUPPORTED BY THE VENDOR. | THE UNIX APPLICATIONS/LICENSES CHECK-OUT WILL NOT BE AVAILABLE DURING THE UPGRADE. | Y | 4/12/2 | L.M. ANDERSON (N); DENNIS REED (N); FRANK MOLNAR (N); ALARIC RENZ (N); RALPH HEWITT III (N); ROGER RUSS (N) | WARREN ROSENBLUM (N) | FULL AND INCREMENTAL BACKUPS WILL BE CONFIRMED BEFORE THE CHANGE CONTROL STARTS. IF THERE ARE HARDWARE OR BACKUP PROBLEMS, THE CHANGE CONTROL WILL BE CANCELED. IT'S POSSIBLE THAT A FULL SERVER RESTORE COULD TAKE 24 HOURS. NORMAL ESCALATION PROCEDURES WILL BE FOLLOWED. | SEE UPGRADE PLAN AT G:\EDS\HW CURRENCY\VERITAS UPGRADES | UNIX ADMIN WILL VERIFY ALL FILE SYSTEMS AND VOLUMES. ADMIN WILL ALSO USE THE FOLLOWING VERITAS COMMANDS TO CONFIRM DISK GROUP, AND FILE SYSTEM VERSIONS; VXUPGRADE "FILE SYSTEM NAME" : VXDG LIST "DISK GROUP NAME". APPLICATION SUPPORT TEAM WILL ALSO CHECK APPLICATIONS. THE UNIX SUPPORT TEAM WILL ALSO CONFIRM ALL LICENSE DAEMONS ARE RUNNING AFTER THE SERVER IS BACK ONLINE. | HW/SW CURRENCY | N/A | DANIEL PECORA / DONALD LOWE | 3/22/05 9:53 AM |
| 21858 | BRAD BALLARD | 5/22/05 1:00 PM | 5/22/05 4:00 PM | 2 HOURS | Yes | PRODUCTION | KATAKA | LEGACY DW | UPGRADE OF P23 LEGACY DATA WAREHOUSE DATABASE TO 9.2.0.6. SCHEDULED ON SHORT NOTICE TO COINCIDE WITH SAP OUTAGE. | LEGACY RAPIDMART AND HR DATABASE WILL BE UNAVAILABLE. | N | 4/12/2 | CARLA LEET (N) | WILLIAM MALLOT (N) | 1) LAST BACKUP 4/15. 2) 2 HOURS 3) BRAD BALLARD | 1) TAKE P23 DATABASE DOWN. 2) UPGRADE TO 9.2.0.6 BINARIES 3) RESTART P23 | DATABASE COMES UP AND IS QUERIABLE. | LEGACY SUPPORT | BRAD BALLARD / DAN LIVINGSTON | 4/11/05 6:10 PM | |
| 21972 | BRAD BALLARD | 5/26/05 8:00 AM | 5/26/05 12:00 PM | 4 HOURS | Yes | PRODUCTION | FARWELL, KATAKA, ELBERT | CIF DATA WAREHOUSE | WEEKLY PROMOTION OF CIF CODE, DATABASE AND SCHEDULING CHANGES, AND DATA MAINTENANCE | NO SERVER OR DATABASE OUTAGE, AGREEMENT WITH AFFECTED USERS WILL BE NEGOTIATED PRIOR TO WINDOW. | N | CHERYL LANDWEHR (N); CARLA LEET (N) | SUE TORRERO (N) | DEFINED AND APPROVED BEFORE WINDOW | DEFINED AND APPROVED BEFORE WINDOW | DEFINED AND APPROVED BEFORE WINDOW | CIF SUPPORT | BRAD BALLARD / JABAKUMAR ISAAC | 4/26/05 10:35 AM | ||
| 21929 | STEPHEN PARKER | 5/26/05 11:00 AM | 5/26/05 12:00 PM | 1 HOURS | Yes | PRODUCTION | TBD | TBD | WORK ORDER - TBD DOCUMENTATION ON WO AVAILABLE AT LSV-DFS01/BET/PROJECTS/6-WORK ORDERS/E-BUSINESS/XXXXXX | NO REBOOT OR IIS RESTART REQUIRED. | N | BARBARA RUCKER (N) | SARAH KENNEDY (N) | THE ONE OLD ASP HAS BEEN COPIED TO A SAVE CODE LOCATION. IF THE MOVE FAILS, THE OLD ASP WILL BE RESTORED. | APS'S WILL BE MOVED FROM THE DEVELOPMENT ENVIROMENT (XXXXX) TO THE PRODUCTION ENVIROMENT (XXXXXX) | ASP DATES IN PRODUCTION WILL MATCH THOSE IN DEVELOPMENT. UPON MOVEMENT, THE PRODUCTION SYSTEM WILL IMMEDIATELY BE TESTED FOR FUNCTIONALITY BY THE DEVELOPER AND CUSTOMER. | TBD | TBD | STEPHEN PARKER | 4/21/05 1:24 PM | |
| 21358 | MICHELLE EVANS | 5/27/05 9:00 PM | 5/29/05 9:00 PM | 24 HOURS | Yes | PRODUCTION | NIMBUS/STRATUS | PROJECT AND HOME DIRECTORIES | MIGRATE RD&E DATA FROM NIMBUS AND STRATUS TO BLUEARC | RD&E USERS (WHO USE THEIR HOME DIRECTORIES) WILL BE IMPACTED - WILL HAVE TO REMAP. THIS WILL AFFECT PRE-DETERMINED INDIVIDUALS, DATA WILL BE DUPLICATED ON BLUE ARC, DURING THE FOLLOWING WEEK INDIVIDUAL HOSTS (CLIENTS AND TEST MACHINES) WILL BE REMAPPED TO THIS DATA FOR CLIENT TESTING. | N | 3/22/2 | DWIGHT ALLMON (N) | GEORGE LOEW (N) | USERS/CLIENTS MAPPED WILL HAVE THESE NEW DIRECTORIES UNMOUNTED AND THE LOCAL MAPS REMOVED. | MIGRATE RD&E DATA FROM NIMBUS AND STRATUS TO BLUEARC | DATA WILL BE EXACTLY THE SAME IN BOTH LOCATIONS, SYSTEMS USING THE NEW LOCATION SHOULD SEE NO NEGATIVE CHANGES IN USE/PERFORMANCE OR CONTENT. | BLUEARC | MICHELLE EVANS / SMOCK RANDALL | 1/25/05 8:59 AM | |
| 21904 | ROBERT HAYNES | 5/28/05 4:00 AM | 5/28/05 2:00 PM | 10 HOURS | Yes | PRODUCTION | LSV-APPS08, 11 AND 24 | SIEBEL 6.0 PROD | PROMOTION SIEBEL 6.0 QAS REPOSITORY TO SIEBEL 6.0 PROD. | SIEBEL 6.0 PROD WILL BE UNAVAILABLE DUING PROMOTION PROCESS, FOR SIEBEL.SRF REPLACEMENT AND APPLICATION SERVICE CYCLE | N | CHRISTINA D'AMICO (N); ANN BRUINSMA (Y); RAJEEV ANKIREDDYPALLI (Y) | WILLIAM MALLOT (Y) | SIEBEL 6.0 PROD HAS A COLD BACKUP TAKEN EVERY SATURDAY MORNING. RESTORE OF THE DATABASE CAN TAKE FROM 8 TO 10 HOURS. NOTIFY BOB HAYNES IF RESTORE WINDOW IS EXCEEDED. | PROMOTION OF SIEBEL 6.0 QAS REPOSITORY, COMPILATON OF SIEBEL.SRF FILE, CREATION AND DISTRIBUTION OF SIEBEL.SRF KIT, REPLACEMENT OF SIEBEL.SRF WITH NEW COPY AND CYCLE OF APPLICATION SERVICES ON ALL THREE WINDOWS APPLICATION SERVERS | SIEBEL 6.0 QAS FUNCTIONALITY WILL BE AVAILABLE IN PRODUCTION. | RESPOSITORY MIGRATION/PROMOTION | 1083168 | ROBERT HAYNES | 4/19/05 8:53 AM | |
| 21912 | ROBERT HAYNES | 5/28/05 4:00 AM | 5/28/05 2:00 PM | 12 HOURS | Yes | PRODUCTION | SAN MIGUEL CLUSTER | SIEBEL 7.5 PRD | PROMOTION/MIGRATION OF SIEBEL 7.5 QAS REPOSITORY TO SIEBEL 7.5 PRD. | SIEBEL 7.5 WILL BE UNAVAILABLE DURING PROMOTION PROCESS AND SERVICE CYCLE | N | CHRISTINA D'AMICO (Y); TED GUDLEVICH (N); ANN BRUINSMA (Y); MARTIN MILES (Y) | WILLIAM MALLOT (Y) | SIEBEL 7.5 PRD DATABASE HAS A COLD BACKUP TAKEN EVERY SATURDAY MORNING. IT CAN TAKE FROM 8 TO 10 HOURS TO RESTORE. CONTACT BOB HAYNES IF RESTORE WINDOW IS EXCEEDED. | MIGRATION/PROMOTION OF SIEBEL 7.5 QAS REPOSITIORY TO SIEBEL 7.5 PRD, COMPILE REPOSITORY, MOVE TO THE PRODUCTION SERVER, GENERATE GENBSCRIPTS AND CYCLE APPLICATION AND WEB SERVICES. | SIEBEL 7.5 QAS APPLICATION UPDATES WILL BE VISIBLE IN SIEBEL 7.5 PRD. | REPOSITORY MIGRATION/PROMOTION | 1083221 | ROBERT HAYNES | 4/19/05 10:39 AM | |
| 21359 | MICHELLE EVANS | 6/3/05 9:00 PM | 6/5/05 9:00 PM | 24 HOURS | Yes | PRODUCTION | NIMBUS/STRATUS | PROJECT AND HOME DIRECTORIES | MIGRATE RD&E DATA FROM NIMBUS AND STRATUS TO BLUEARC | RD&E USERS (WHO USE THEIR HOME DIRECTORIES) WILL BE IMPACTED - WILL HAVE TO REMAP. THIS WILL AFFECT PRE-DETERMINED INDIVIDUALS, DATA WILL BE DUPLICATED ON BLUE ARC, DURING THE FOLLOWING WEEK INDIVIDUAL HOSTS (CLIENTS AND TEST MACHINES) WILL BE REMAPPED TO THIS DATA FOR CLIENT TESTING. | N | 3/15/2 | DWIGHT ALLMON (N) | GEORGE LOEW (N) | USERS/CLIENTS MAPPED WILL HAVE THESE NEW DIRECTORIES UNMOUNTED AND THE LOCAL MAPS REMOVED. | MIGRATE RD&E DATA FROM NIMBUS AND STRATUS TO BLUEARC | DATA WILL BE EXACTLY THE SAME IN BOTH LOCATIONS, SYSTEMS USING THE NEW LOCATION SHOULD SEE NO NEGATIVE CHANGES IN USE/PERFORMANCE OR CONTENT. | BLUEARC | MICHELLE EVANS / SMOCK RANDALL | 1/25/05 9:04 AM | |
| 21840 | CYNTHIA FOREMAN | 6/4/05 1:00 AM | 6/4/05 9:00 AM | 8 HOURS | Yes | PRODUCTION | SAN MIGUEL | CLARIFY | REORG CLARIFY TABLES TO IMPROVE PERFORMANCE | CLARIFY WILL BE UNAVAILABLE | N | BARB LARSEN (Y) | WILLIAM MALLOT (N); JUDITH KING (N) | RESTORE FROM COLD BACKUP | REORG CLARIFY TABLES TO IMPROVE PERFORMANCE | FRAGMENTATION WILL BE REDUCED | CYNTHIA FOREMAN | 4/6/05 3:31 PM | |||
| 21905 | ROBERT HAYNES | 6/4/05 4:00 AM | 6/4/05 2:00 PM | 10 HOURS | Yes | PRODUCTION | LSV-APPS08, 11 AND 24 | SIEBEL 6.0 PROD | PROMOTION SIEBEL 6.0 QAS REPOSITORY TO SIEBEL 6.0 PROD. | SIEBEL 6.0 PROD WILL BE UNAVAILABLE DUING PROMOTION PROCESS, FOR SIEBEL.SRF REPLACEMENT AND APPLICATION SERVICE CYCLE | N | CHRISTINA D'AMICO (Y); ANN BRUINSMA (Y); RAJEEV ANKIREDDYPALLI (Y) | WILLIAM MALLOT (Y) | SIEBEL 6.0 PROD HAS A COLD BACKUP TAKEN EVERY SATURDAY MORNING. RESTORE OF THE DATABASE CAN TAKE FROM 8 TO 10 HOURS. NOTIFY BOB HAYNES IF RESTORE WINDOW IS EXCEEDED. | PROMOTION OF SIEBEL 6.0 QAS REPOSITORY, COMPILATON OF SIEBEL.SRF FILE, CREATION AND DISTRIBUTION OF SIEBEL.SRF KIT, REPLACEMENT OF SIEBEL.SRF WITH NEW COPY AND CYCLE OF APPLICATION SERVICES ON ALL THREE WINDOWS APPLICATION SERVERS | SIEBEL 6.0 QAS FUNCTIONALITY WILL BE AVAILABLE IN PRODUCTION. | RESPOSITORY MIGRATION/PROMOTION | 1083168 | ROBERT HAYNES | 4/19/05 8:54 AM | |
| 21913 | ROBERT HAYNES | 6/4/05 4:00 AM | 6/4/05 2:00 PM | 12 HOURS | Yes | PRODUCTION | SAN MIGUEL CLUSTER | SIEBEL 7.5 PRD | PROMOTION/MIGRATION OF SIEBEL 7.5 QAS REPOSITORY TO SIEBEL 7.5 PRD. | SIEBEL 7.5 WILL BE UNAVAILABLE DURING PROMOTION PROCESS AND SERVICE CYCLE | N | CHRISTINA D'AMICO (Y); TED GUDLEVICH (N); ANN BRUINSMA (Y); MARTIN MILES (Y) | WILLIAM MALLOT (Y) | SIEBEL 7.5 PRD DATABASE HAS A COLD BACKUP TAKEN EVERY SATURDAY MORNING. IT CAN TAKE FROM 8 TO 10 HOURS TO RESTORE. CONTACT BOB HAYNES IF RESTORE WINDOW IS EXCEEDED. | MIGRATION/PROMOTION OF SIEBEL 7.5 QAS REPOSITIORY TO SIEBEL 7.5 PRD, COMPILE REPOSITORY, MOVE TO THE PRODUCTION SERVER, GENERATE GENBSCRIPTS AND CYCLE APPLICATION AND WEB SERVICES. | SIEBEL 7.5 QAS APPLICATION UPDATES WILL BE VISIBLE IN SIEBEL 7.5 PRD. | REPOSITORY MIGRATION/PROMOTION | 1083221 | ROBERT HAYNES | 4/19/05 10:42 AM | |
| 21864 | JOSEPH WIGGINS | 6/9/05 5:00 PM | 12/31/99 5:00 PM | 30 MINS | Yes | PRODUCTION | MUMMY | SAP | CREATE AUTOSYS JOB TO CLOSE THE INVENTORY G/L ACCOUNTS FOR THE PRIOR PERIOD. THIS WILL ENABLE THE PRODUCT COST DEPARTMENT TO BEGIN MONTH-END PROCESSING WITHOUT ANYONE ELSE POSTING TO INVENTORY ACCOUNTS DURING THEIR PROCESS. | ONCE THE INVENTORY G/L ACCOUNTS HAVE BEEN CLOSED, THIS WILL PREVENT ANY/ALL INVENTORY MOVEMENTS FOR THE PRIOR PERIOD. | N | KERRY BEARLY (N) | JOSEPH WIGGINS (Y) | PUT NEW AUTOSYS JOB ON ICE UNTIL THE PROBLEM IS RESOLVED. | CREATE NEW AUTOSYS AND SAP JOBS WHICH WILL CLOSE THE INVENTORY G/L ACCOUNTS FOR THE PRIOR PERIOD. | VERIFY THAT THE NEW JOBS HAVE BEEN CREATED. | ACML PROJECT | JUDY JOHNSON | 4/12/05 11:49 AM | ||
| 21360 | MICHELLE EVANS | 6/10/05 9:00 PM | 6/12/05 9:00 PM | 24 HOURS | Yes | PRODUCTION | NIMBUS/STRATUS | PROJECT AND HOME DIRECTORIES | MIGRATE RD&E DATA FROM NIMBUS AND STRATUS TO BLUEARC | RD&E USERS (WHO USE THEIR HOME DIRECTORIES) WILL BE IMPACTED - WILL HAVE TO REMAP. THIS WILL AFFECT PRE-DETERMINED INDIVIDUALS, DATA WILL BE DUPLICATED ON BLUE ARC, DURING THE FOLLOWING WEEK INDIVIDUAL HOSTS (CLIENTS AND TEST MACHINES) WILL BE REMAPPED TO THIS DATA FOR CLIENT TESTING. | N | 2/8/20 | DWIGHT ALLMON (N) | GEORGE LOEW (N) | USERS/CLIENTS MAPPED WILL HAVE THESE NEW DIRECTORIES UNMOUNTED AND THE LOCAL MAPS REMOVED. | MIGRATE RD&E DATA FROM NIMBUS AND STRATUS TO BLUEARC | DATA WILL BE EXACTLY THE SAME IN BOTH LOCATIONS, SYSTEMS USING THE NEW LOCATION SHOULD SEE NO NEGATIVE CHANGES IN USE/PERFORMANCE OR CONTENT. | BLUEARC | MICHELLE EVANS / SMOCK RANDALL | 1/25/05 9:06 AM | |
| 21906 | ROBERT HAYNES | 6/11/05 4:00 AM | 6/11/05 2:00 PM | 10 HOURS | Yes | PRODUCTION | LSV-APPS08, 11 AND 24 | SIEBEL 6.0 PROD | PROMOTION SIEBEL 6.0 QAS REPOSITORY TO SIEBEL 6.0 PROD. | SIEBEL 6.0 PROD WILL BE UNAVAILABLE DUING PROMOTION PROCESS, FOR SIEBEL.SRF REPLACEMENT AND APPLICATION SERVICE CYCLE | N | CHRISTINA D'AMICO (Y); ANN BRUINSMA (Y); RAJEEV ANKIREDDYPALLI (Y) | WILLIAM MALLOT (Y) | SIEBEL 6.0 PROD HAS A COLD BACKUP TAKEN EVERY SATURDAY MORNING. RESTORE OF THE DATABASE CAN TAKE FROM 8 TO 10 HOURS. NOTIFY BOB HAYNES IF RESTORE WINDOW IS EXCEEDED. | PROMOTION OF SIEBEL 6.0 QAS REPOSITORY, COMPILATON OF SIEBEL.SRF FILE, CREATION AND DISTRIBUTION OF SIEBEL.SRF KIT, REPLACEMENT OF SIEBEL.SRF WITH NEW COPY AND CYCLE OF APPLICATION SERVICES ON ALL THREE WINDOWS APPLICATION SERVERS | SIEBEL 6.0 QAS FUNCTIONALITY WILL BE AVAILABLE IN PRODUCTION. | RESPOSITORY MIGRATION/PROMOTION | 1083168 | ROBERT HAYNES | 4/19/05 8:55 AM | |
| 21914 | ROBERT HAYNES | 6/11/05 4:00 AM | 6/11/05 2:00 PM | 12 HOURS | Yes | PRODUCTION | SAN MIGUEL CLUSTER | SIEBEL 7.5 PRD | PROMOTION/MIGRATION OF SIEBEL 7.5 QAS REPOSITORY TO SIEBEL 7.5 PRD. | SIEBEL 7.5 WILL BE UNAVAILABLE DURING PROMOTION PROCESS AND SERVICE CYCLE | N | CHRISTINA D'AMICO (Y); TED GUDLEVICH (N); ANN BRUINSMA (Y); MARTIN MILES (Y) | WILLIAM MALLOT (Y) | SIEBEL 7.5 PRD DATABASE HAS A COLD BACKUP TAKEN EVERY SATURDAY MORNING. IT CAN TAKE FROM 8 TO 10 HOURS TO RESTORE. CONTACT BOB HAYNES IF RESTORE WINDOW IS EXCEEDED. | MIGRATION/PROMOTION OF SIEBEL 7.5 QAS REPOSITIORY TO SIEBEL 7.5 PRD, COMPILE REPOSITORY, MOVE TO THE PRODUCTION SERVER, GENERATE GENBSCRIPTS AND CYCLE APPLICATION AND WEB SERVICES. | SIEBEL 7.5 QAS APPLICATION UPDATES WILL BE VISIBLE IN SIEBEL 7.5 PRD. | REPOSITORY MIGRATION/PROMOTION | 1083221 | ROBERT HAYNES | 4/19/05 10:43 AM | |
| 21863 | JOSEPH WIGGINS | 6/13/05 1:00 AM | 12/31/99 1:00 AM | 30 MINS | Yes | PRODUCTION | MUMMY | SAP | MONTHLY EXTRACT OF ACTUAL COST DATA FROM SAP. PASS THE EXTRACTED FILE TO THE NEW MATERIAL SAVINGS DATABASE. | ADDITIONAL CPU, I/O, ETC. ON SAP SERVER AND ON THE MATERIAL SAVINGS DATABASE SERVER. | N | KERRY BEARLY (N) | JOSEPH WIGGINS (Y) | PUT AUTOSYS JOB ON ICE UNTIL PROBLEM RESOLVED | CREATE NEW AUTOSYS JOB/SAP JOB TO EXTRACT THE ACTUAL COST DATA | NEW AUTOSYS AND SAP JOBS ARE DEFINED | ACML PROJECT | JUDY JOHNSON | 4/12/05 11:40 AM | ||
| 21430 | MICHELLE EVANS | 6/17/05 9:00 PM | 6/19/05 9:00 PM | 24 HOURS | Yes | PRODUCTION | NIMBUS/STRATUS | PROJECT AND HOME DIRECTORIES | MIGRATE RD&E DATA FROM NIMBUS AND STRATUS TO BLUEARC | RD&E USERS (WHO USE THEIR HOME DIRECTORIES) WILL BE IMPACTED - WILL HAVE TO REMAP. THIS WILL AFFECT PRE-DETERMINED INDIVIDUALS, DATA WILL BE DUPLICATED ON BLUE ARC, DURING THE FOLLOWING WEEK INDIVIDUAL HOSTS (CLIENTS AND TEST MACHINES) WILL BE REMAPPED TO THIS DATA FOR CLIENT TESTING. | N | 3/1/20 | DWIGHT ALLMON (N) | GEORGE LOEW (N) | USERS/CLIENTS MAPPED WILL HAVE THESE NEW DIRECTORIES UNMOUNTED AND THE LOCAL MAPS REMOVED. | MIGRATE RD&E DATA FROM NIMBUS AND STRATUS TO BLUEARC | DATA WILL BE EXACTLY THE SAME IN BOTH LOCATIONS, SYSTEMS USING THE NEW LOCATION SHOULD SEE NO NEGATIVE CHANGES IN USE/PERFORMANCE OR CONTENT. | BLUEARC | MICHELLE EVANS / SMOCK RANDALL | 2/3/05 3:02 PM | |
| 21907 | ROBERT HAYNES | 6/18/05 4:00 AM | 6/18/05 2:00 PM | 10 HOURS | Yes | PRODUCTION | LSV-APPS08, 11 AND 24 | SIEBEL 6.0 PROD | PROMOTION SIEBEL 6.0 QAS REPOSITORY TO SIEBEL 6.0 PROD. | SIEBEL 6.0 PROD WILL BE UNAVAILABLE DUING PROMOTION PROCESS, FOR SIEBEL.SRF REPLACEMENT AND APPLICATION SERVICE CYCLE | N | CHRISTINA D'AMICO (Y); ANN BRUINSMA (Y); RAJEEV ANKIREDDYPALLI (Y) | WILLIAM MALLOT (Y) | SIEBEL 6.0 PROD HAS A COLD BACKUP TAKEN EVERY SATURDAY MORNING. RESTORE OF THE DATABASE CAN TAKE FROM 8 TO 10 HOURS. NOTIFY BOB HAYNES IF RESTORE WINDOW IS EXCEEDED. | PROMOTION OF SIEBEL 6.0 QAS REPOSITORY, COMPILATON OF SIEBEL.SRF FILE, CREATION AND DISTRIBUTION OF SIEBEL.SRF KIT, REPLACEMENT OF SIEBEL.SRF WITH NEW COPY AND CYCLE OF APPLICATION SERVICES ON ALL THREE WINDOWS APPLICATION SERVERS | SIEBEL 6.0 QAS FUNCTIONALITY WILL BE AVAILABLE IN PRODUCTION. | RESPOSITORY MIGRATION/PROMOTION | 1083168 | ROBERT HAYNES | 4/19/05 8:56 AM | |
| 21915 | ROBERT HAYNES | 6/18/05 4:00 AM | 6/18/05 2:00 PM | 12 HOURS | Yes | PRODUCTION | SAN MIGUEL CLUSTER | SIEBEL 7.5 PRD | PROMOTION/MIGRATION OF SIEBEL 7.5 QAS REPOSITORY TO SIEBEL 7.5 PRD. | SIEBEL 7.5 WILL BE UNAVAILABLE DURING PROMOTION PROCESS AND SERVICE CYCLE | N | CHRISTINA D'AMICO (Y); TED GUDLEVICH (N); ANN BRUINSMA (Y); MARTIN MILES (Y) | WILLIAM MALLOT (Y) | SIEBEL 7.5 PRD DATABASE HAS A COLD BACKUP TAKEN EVERY SATURDAY MORNING. IT CAN TAKE FROM 8 TO 10 HOURS TO RESTORE. CONTACT BOB HAYNES IF RESTORE WINDOW IS EXCEEDED. | MIGRATION/PROMOTION OF SIEBEL 7.5 QAS REPOSITIORY TO SIEBEL 7.5 PRD, COMPILE REPOSITORY, MOVE TO THE PRODUCTION SERVER, GENERATE GENBSCRIPTS AND CYCLE APPLICATION AND WEB SERVICES. | SIEBEL 7.5 QAS APPLICATION UPDATES WILL BE VISIBLE IN SIEBEL 7.5 PRD. | REPOSITORY MIGRATION/PROMOTION | 1083221 | ROBERT HAYNES | 4/19/05 10:44 AM | |
| 20500 | JAMES BIDDLE | 7/5/05 7:00 AM | 7/5/05 9:30 AM | 60 MINS | Yes | PRODUCTION | HQ-LDAP.STORTEK.COM | SIEBEL 6 | CHANGE ALL SIEBEL 6 USER ACCOUNT TO INCLUDE VALUE FOR CREDENTIALS ATTRIBUTE ON HQ-LDAP USER ACCOUNTS. ALREADY IMPLEMENTED ON TEST LDAP. | 1300 SIEBEL USER ACCOUNTS WHEN THEY LOG-IN USING SIEBEL 6. THIS CHANGE WILL NOT AFFECT SIEBEL 6 USERS UNTILL REMEDY 20509 CHANGES SIEBEL 6 TO USE LDAP FOR AUTHENTICATION. | N | 10/19/ | WILLIAM MALLOT (N); WARREN ROSENBLUM (Y); RAJEEV ANKIREDDYPALLI (N) | JAMES BIDDLE (N); ROBERT HAYNES (Y) | LDAP BACKUP HAPPENS EVERY DAY AT MIDNIGHT. | RUN A LDAPMODIFY COMMAND USING A SIEBEL USER FILE TO MODIFY SIEBEL USER ACCOUT INFORMATION. INFORMATION TO BE MODIFIED: CREDENTIALS FIELD VALUE | CHECK LDAP MODIFY OUTPUT, COMMUNICATE WITH BOB HAYNES ON THE SIEBEL SIDE. | SIEBEL | 1004451 | JAMES BIDDLE | 9/7/04 2:40 PM |
| 20509 | ROBERT HAYNES | 7/9/05 5:00 PM | 7/9/05 5:30 PM | 30 MINS | N/A | QAS/STAGING | LSV-TST06, LSV-DEV02 | SIEBEL 6.0 QAS AND QAL | DISTRIBUTE NEW SIEBEL.CFG FILE TO ALL SIEBEL 6.0 QAS CUSTOMERS. NEW CONFIG FILE CONTAINS PARAMETERS REQUIRED FOR LDAP SECURITY AUTHENTICATION. | ALL SIEBEL 6.0 QAL AND QAS CUSTOMER'S LOGIN PASSWORDS WILL BE UPDATED TO MATCH THEIR RESPECTIVE NT LOGIN VALUES | N | 10/19/ | -- NO BUSINESS APPROVER(S) ASSIGNED -- | WILLIAM MALLOT (N); ROBERT HAYNES (N) | CREATE AND DISTRIBUTE NEW KIT CONTAINING A SIEBEL.CFG FILE MINUS THE LDAP SECURITY PARAMETERS | CREATE AND DISTRIBUTE NEW SIEBEL.CFG FILE IN A SIEBEL ANYWHERE KIT TO ALL SIEBEL 6.0 QAS CUSTOMERS. NEW CONFIG FILE CONTAINS PARAMETERS REQUIRED FOR LDAP SECURITY AUTHENTICATION. | ALL SIEBLE 6.0 QAL AND QAS CUSTOMERS LOGINS WILL BE ALIGNED WITH THEIR RESPECTIVE NT VALUES | SOX - LDAP IMPLEMENTATION FOR SIEBEL 6.0 | 1000475 | ROBERT HAYNES | 9/8/04 2:34 PM |
| 21352 | MICHELLE EVANS | 7/10/05 9:00 PM | 7/10/05 11:45 PM | 60 MINS | Yes | PRODUCTION | CYCLONE | UNIX MAIL SERVER | MIGRATE CYCLONE TO BLUEARC | MIGRATE CYCLONE TO BLUEARC | N | 1/25/2 | DWIGHT ALLMON (N) | GEORGE LOEW (N) | MIGRATE CYCLONE TO BLUEARC | MIGRATE CYCLONE TO BLUEARC | MIGRATE CYCLONE TO BLUEARC | BLUEARC | MICHELLE EVANS / BRETT WRIGHT | 1/24/05 1:25 PM | |
| 20511 | ROBERT HAYNES | 7/16/05 8:00 AM | 7/16/05 8:30 AM | 30 MINS | Yes | PRODUCTION | LSV-APPS08 | SIEBEL 6.0 PROD | DISTRIBUTE NEW SIEBEL.CFG FILE TO ALL SIEBEL 6.0 PROD CUSTOMERS. NEW CONFIG FILE CONTAINS PARAMETERS REQUIRED FOR LDAP SECURITY AUTHENTICATION. | ALL SIEBEL 6.0 PROD CUSTOMERS LOGINS/PASSWORDS WILL BE ALIGNED WITH THEIR RESPECTIVE NT VALUES | N | 10/19/ | RAJEEV ANKIREDDYPALLI (N) | WILLIAM MALLOT (N); ROBERT HAYNES (N) | CREATE AND DISTRIBUTE, VIA EMAIL, A NEW SIEBEL KIT THAT WILL BE MINUS THE LDAP PARAMETERS. | CREATE AND DISTRIBUTE NEW SIEBEL.CFG FILE IN A SIEBEL ANYWHERE KIT TO ALL SIEBEL 6.0 PROD CUSTOMERS. NEW CONFIG FILE CONTAINS PARAMETERS REQUIRED FOR LDAP SECURITY AUTHENTICATION. | ALL SIEBEL 6.0 PROD CUSTOMER'S PASSWORDS WILL BE SET TO THEIR RESPETIVE NT AUTHENTICATION VALUES | SOX - LDAP IMPLEMENTATION FOR SIEBEL 6.0 | 1004451 | ROBERT HAYNES | 9/8/04 2:49 PM |